Which of the following are purposes of the Defense Acquisition System? - ANSWER A. Develop technology
B. Produce weapons system.
C. Provide logistics support.
Documents produced during the JCIDS process are used to
...
Which of the following are purposes of the Defense Acquisition System? - ANSWER A. Develop technology
B. Produce weapons system.
C. Provide logistics support.
Documents produced during the JCIDS process are used to support Defense Acquisition System milestone decisions? - ANSWER True
Which of the following are characteristics of the Material Solution Analysis phase? - ANSWER a. The AoA is conducted.
b. A PM is selected and a program office is established.
c. Promising technologies are analyzed to determined which one is best suited to meet validated requirements.
The results of the basis for which of following? - ANSWER Acquisition Strategy.
Which one of the following is considered a primary goal of an Acquisition Strategy? - ANSWER Minimize the time and cost needed to satisfy validated needs.
Which term is defined as the minimum acceptable value for the performance that is necessary to satisfy an identified need? - ANSWER Threshold.
Which of the following are considered parameters of the Acquisition Program Baseline? Select all that apply. - ANSWER a. Cost
b. Performance.
c. Schedule.
A successful Milestone A decision leads to entry into which phase? - ANSWER Technology Maturation and Risk reduction.
The AS must be approved by the MDA prior to what? - ANSWER Release of a formal solicitation.
The MDA must approve which of the following for a program to successfully complete Milestone A? (Select All the apply).
. - ANSWER a. The proposed material solution.
b. The Acquisition Strategy.
c. A life Cycle Sustainment Plan
When does a program enter the TMRR phase? - ANSWER When the AoA has been completed and the MDA has approved the AS.
Which of the following are goals of the TMRR phase? (Select all that apply) - ANSWER a. Reduce technology risk.
b. Demonstrate critical technologies through prototyping.
c. Conduct a preliminary design review.
True or False? One of the requirements for a project to exit the TMRR phase is that the technology has been demonstrated in a relevant environment. - ANSWER True
What is the purpose of Milestone B? - ANSWER Initiate engineering and manufacturing development.
Which of the following are key considerations of the EMD phase? (Select all that apply) - ANSWER a. Completes all needed hardware and software detailed design.
b. Systemically retires any open risks.
c. Prepares for production and deployment.
Which of the following is a responsibility of the PM during EMD phase? - ANSWER Finalizing designs of the product support elements
Which of the following are considerations for Milestone C? (Select all that apply). - ANSWER a. Cost estimates.
b. Environmental issues.
c. Manpower estimates.
True or False? An updated Acquisition Program Baseline is required for Milestone C approval. - ANSWER True.
MDA decisions made during the Production and deployment phase are documented where? - ANSWER Acquisition Decision Memorandum.
True or False? Acquisition programs enter the Full Rate Production and Deployment after completing the Life Cycle Sustainment Plan. - ANSWER False
The Operations and Support phase is based in what? - ANSWER An MDA-approved LCSP.
True or False? PMs are encouraged but not required to establish organic depot maintenance capabilities? - ANSWER False.
Which of the following are PM considerations during the Disposal? (Select all that apply). - ANSWER a. Complete reuse or recycling of system components and materials.
b. Waste disposal.
c. Sale or donation to the private sector or other governments.
Which of the following are key considerations of Low Rate Initial Production? (Select all that apply). - ANSWER a. Establishes an initial production base for the system.
b. Provides OT&E test articles.
c. Provides an efficient ramp-up to full rate.
Defense Acquisition System (DAS) uses "Milestones" to oversee and manage acquisition programs. True or False? - ANSWER True.
How many "Milestones" they are? - ANSWER Three: A, B, & C.
What are the names of the "Milestones?" - ANSWER 1. Milestone "A: Initiates Technology Maturation and Risk Reduction phase (TMRR).
2. Milestone "B: initiates Engineering and Manufacturing Development phase (EMD).
3. Milestone C: Initiates Production and Deployment phase (PD).
The Defense Acquisition System is governed by? - ANSWER a. DoDD 5000.01
b. DoDI 5000.02
A favorable Milestone C decision authorizes entry to this phase. - ANSWER What is production and development?
This is a true statement about the Acquisition Program Baseline (ABP)? - ANSWER What is the PM, in coordination with the user, prepares the APB at program initiation?
The Acquisition strategy defines the increment about to be undertaken, as well as subsequent increments in this requirement. - ANSWER What is the time-phased needs?
This is used to create the Acquisition Program Baseline (ABP). - ANSWER What is the Defense Acquisition Management Information Retrieval (DAMIR)?
This person prepares the Acquisition Strategy during the MSA. - ANSWER Who is the Program Manager?
Prepared at program initiation and revised to subsequent milestone reviews, program, restructuring, or unrecoverable deviations. - ANSWER What is the APB?
During this phase, the appropriate operational authority will declare Initial Operational Capability (IOC) when the defined operational organization has been equipped and trained, and is determined to be capable of conducting missing operations. - ANSWER What is the Production and Deployment phase?
The acquisition document that states each PM must prepare and the MDA must approve an Acquisition Strategy (AS). - ANSWER What is the DoDI 5000.02?
This is the agreement between the MDA and Program Manager that will be used for tracking a program. - ANSWER What is the Acquisition Program Baseline?
The Operations and Support Phase begins after the production or deployment decision and is based on which Milestone Decision Authority (MDA) approved document? - ANSWER Life Cycle Sustainment Plan (LCSP).
What is the purpose of an Acquisition Strategy (AS)? - ANSWER a. To guide execution from initiation through re-procurement of systems, subsystems, components, spares, and services beyond the initial production contract award and during post-production support.
Before a project enters the TMRR phase, the AoA must be complete and the Acquisition Strategy (AS) is approved by the MDA. - ANSWER True
When is the Acquisition Program baseline (APB) prepared? - ANSWER Prepared at program initiation and revised to subsequent milestone reviews, program restructuring, or unrecoverable deviations.
What authorizes entry into the Engineering and Manufacturing Development (EMD) phase? - ANSWER Milestone B decision.
What authorizes entry into the Production and Deployment phase? - ANSWER Life Cycle Sustainment Plan (LCSP)
DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and provides logistics support through the Defense Acquisition System. - ANSWER True.
The Materiel Solution Analysis Phase (MSA) ends when the Analysis of Alternatives (AoA) has been completed, a materiel solution option for the capability need is recommended, and the phase-specific entrance criteria for the initial review milestone have been satisfied. - ANSWER True.
In order for the Program Manager to maximize affordability from program initiation through post-production, the Acquisition Strategy must evolve and become increasingly more definitive. - ANSWER True.
What authorizes entry into the Production and Deployment phase? - ANSWER Milestone C decision.
What authorizes entry into the Engineering and Manufacturing Development (EMD) phase? - ANSWER Milestone B decision.
In what document does the Program Manager (PM) address the demilitarization and disposal requirements? - ANSWER Life Cycle Sustainment Plan (LCSP).
What is the purpose of an Acquisition Strategy (AS)? - ANSWER To guide execution from initiation through re-procurement of systems, subsystems, components, spares, and services beyond the initial production contract award and during post-production support.
What are two outputs of the Technology Maturation and Risk Reduction (TMRR) phase? - ANSWER a. Capability Development Document (CDD) and Reliability, Availability, and Maintainability Cost Report (RAM_C).
The key activity during the Materiel Solution Analysis Phase (MSA) is to analyze promising technologies to determine which one is best suited to meet the validated requirement. - ANSWER True.
Which is used to create the Acquisition Program Baseline (APB)? - ANSWER Defense Acquisition Management Information Retrieval (DAMIR).