What are three recommended methods for downloading data for a backup or archive?
Choose 3 answers.
A. Schedule a weekly export from the system.
B. Use the Dataloader to download the data.
C. Schedule a report to emai
...
What are three recommended methods for downloading data for a backup or archive?
Choose 3 answers.
A. Schedule a weekly export from the system.
B. Use the Dataloader to download the data.
C. Schedule a report to email to the Admin.
D. Configure outbound messages for all objects.
E. Use an Extract Transform Load (ETL) Tool. - A. Schedule a weekly export from the
system.
B. Use the Dataloader to download the data.
E. Use an Extract Transform Load (ETL) Tool
In the context of a formal data governance program, which two activities are the
responsibility of the Data Architect? Choose 2 answers.
A. Create and maintain database backups.
B. Translate business requirements into data models.
C. Maintain data architecture metadata repository.
D. Manage the data governance program. - B. Translate business requirements into
data models.
C. Maintain data architecture metadata repository.
Universal Containers would like to import 1+ million Lead records into Salesforce. What
API should be used for optimal performance during the load? Choose one answer.
A. SOAP API
B. Bulk API in serial mode
C. Streaming API
D. Bulk API in parallel mode - D. Bulk API in parallel mode
Universal Containers (UC) has a set of integrations that execute sequentially.
Salesforce is the final downstream system for integrations. Management is complaining
that data is taking too long to appear in Salesforce. Choose two answers.
A. Document the data flow within each system and through each integration.
B. Add CPU and memory to the integration platform hardware.C. Confirm that network bandwidth and latency are within expected parameters.
D. Increase the number of parallel integration processes that are running. - A.
Document the data flow within each system and through each integration.
C. Confirm that network bandwidth and latency are within expected parameters.
Universal Containers (UC) has two existing Salesforce orgs used for Sales and Service.
UC plans to merge one of the Salesforce orgs (the source) into the other org (the
target).
Which two tasks should be completed first to document the target data architecture?
Choose two answers.
A. Analyze the source and target Salesforce orgs to identify data model conflicts and
gaps.
B. Gather and analyze the system audit logs from each org to reconcile the metadata
change history.
C. Gather and analyze new business requirements for the combined Salesforce orgs.
D. Deploy all customizations and data as-is from the source org to the target org to
identify conflicts. - A. Analyze the source and target Salesforce orgs to identify data
model conflicts and gaps.
C. Gather and analyze new business requirements for the combined Salesforce orgs.
What can be done to prevent lock contention errors when performing bulk d
[Show More]