Mathematics > AS Mark Scheme > GCE Further Mathematics B (MEI) Y422/01: Statistics major Advanced GCE Mark Scheme for November 2020 (All)

GCE Further Mathematics B (MEI) Y422/01: Statistics major Advanced GCE Mark Scheme for November 2020

Document Content and Description Below

Oxford Cambridge and RSA Examinations GCE Further Mathematics B (MEI) Y422/01: Statistics major Advanced GCE Mark Scheme for November 2020Oxford Cambridge and RSA Examinations OCR (Oxford Cambri... dge and RSA) is a leading UK awarding body, providing a wide range of qualifications to meet the needs of candidates of all ages and abilities. OCR qualifications include AS/A Levels, Diplomas, GCSEs, Cambridge Nationals, Cambridge Technicals, Functional Skills, Key Skills, Entry Level qualifications, NVQs and vocational qualifications in areas such as IT, business, languages, teaching/training, administration and secretarial skills. It is also responsible for developing new specifications to meet national requirements and the needs of students and teachers. OCR is a not-for-profit organisation; any surplus made is invested back into the establishment to help towards the development of qualifications and support, which keep pace with the changing needs of today’s society. This mark scheme is published as an aid to teachers and students, to indicate the requirements of the examination. It shows the basis on which marks were awarded by examiners. It does not indicate the details of the discussions which took place at an examiners’ meeting before marking commenced. All examiners are instructed that alternative correct answers and unexpected approaches in candidates’ scripts must be given marks that fairly reflect the relevant knowledge and skills demonstrated. Mark schemes should be read in conjunction with the published question papers and the report on the examination. © OCR 2020Y422/01 Mark Scheme November 2020 2 Text Instructions Annotations and abbreviations Annotation in scoris Meaning and  BOD Benefit of doubt FT Follow through ISW Ignore subsequent working M0, M1 Method mark awarded 0, 1 A0, A1 Accuracy mark awarded 0, 1 B0, B1 Independent mark awarded 0, 1 E Explanation mark 1 SC Special case ^ Omission sign MR Misread BP Blank page Highlighting Other abbreviations in mark scheme Meaning E1 Mark for explaining a result or establishing a given result dep* Mark dependent on a previous mark, indicated by *. The * may be omitted if only previous M mark. cao Correct answer only oe Or equivalent rot Rounded or truncated soi Seen or implied www Without wrong working AG Answer given awrt Anything which rounds to BC By Calculator DR This indicates that the instruction In this question you must show detailed reasoning appears in the question.Y422/01 Mark Scheme November 2020 3 Subject-specific Marking Instructions for AS Level Mathematics B (MEI) a Annotations must be used during your marking. For a response awarded zero (or full) marks a single appropriate annotation (cross, tick, M0 or ^) is sufficient, but not required. For responses that are not awarded either 0 or full marks, you must make it clear how you have arrived at the mark you have awarded and all responses must have enough annotation for a reviewer to decide if the mark awarded is correct without having to mark it independently. It is vital that you annotate standardisation scripts fully to show how the marks have been awarded. Award NR (No Response) - if there is nothing written at all in the answer space and no attempt elsewhere in the script - OR if there is a comment which does not in any way relate to the question (e.g. ‘can’t do’, ‘don’t know’) - OR if there is a mark (e.g. a dash, a question mark, a picture) which isn’t an attempt at the question. Note: Award 0 marks only for an attempt that earns no credit (including copying out the question). If a candidate uses the answer space for one question to answer another, for example using the space for 8(b) to answer 8(a), then give benefit of doubt unless it is ambiguous for which part it is intended. b An element of professional judgement is required in the marking of any written paper. Remember that the mark scheme is designed to assist in marking incorrect solutions. Correct solutions leading to correct answers are awarded full marks but work must not always be judged on the answer alone, and answers that are given in the question, especially, must be validly obtained; key steps in the working must always be looked at and anything unfamiliar must be investigated thoroughly. Correct but unfamiliar or unexpected methods are often signalled by a correct result following an apparently incorrect method. Such work must be carefully assessed. When a candidate adopts a method which does not correspond to the mark scheme, escalate the question to your Team Leader who will decide on a course of action with the Principal Examiner. If you are in any doubt whatsoever you should contact your Team Leader.Y422/01 Mark Scheme November 2020 4 c The following types of marks are available. M A suitable method has been selected and applied in a manner which shows that the method is essentially understood. Method marks are not usually lost for numerical errors, algebraic slips or errors in units. However, it is not usually sufficient for a candidate just to indicate an intention of using some method or just to quote a formula; the formula or idea must be applied to the specific problem in hand, e.g. by substituting the relevant quantities into the formula. In some cases the nature of the errors allowed for the award of an M mark may be specified. A method mark may usually be implied by a correct answer unless the question includes the DR statement, the command words “Determine” or “Show that”, or some other indication that the method must be given explicitly. A Accuracy mark, awarded for a correct answer or intermediate step correctly obtained. Accuracy marks cannot be given unless the associated Method mark is earned (or implied). Therefore M0 A1 cannot ever be awarded. B Mark for a correct result or statement independent of Method marks. E A given result is to be established or a result has to be explained. This usually requires more working or explanation than the establishment of an unknown result. Unless otherwise indicated, marks once gained cannot subsequently be lost, e.g. wrong working following a correct form of answer is ignored. Sometimes this is reinforced in the mark scheme by the abbreviation isw. However, this would not apply to a case where a candidate passes through the correct answer as part of a wrong argument. d When a part of a question has two or more ‘method’ steps, the M marks are in principle independent unless the scheme specifically says otherwise; and similarly where there are several B marks allocated. (The notation ‘dep*’ is used to indicate that a particular mark is dependent on an earlier, asterisked, mark in the scheme.) Of course, in practice it may happen that when a candidate has once gone wrong in a part of a question, the work from there on is worthless so that no more marks can sensibly be given. On the other hand, when two or more steps are successfully run together by the candidate, the earlier marks are implied and full credit must be given. e The abbreviation FT implies that the A or B mark indicated is allowed for work correctly following on from previously incorrect results. Otherwise, A and B marks are given for correct work only – differences in notation are of course permitted. A (accuracy) marks are not given for answers obtained from incorrect working. When A or B marks are awarded for work at an intermediate stage of a solution, there may be various alternatives that are equally acceptable. In such cases, what is acceptable will be detailed in the mark scheme. If this is not the case, please escalate the question to your Team Leader who will decide on a course of action with the Principal Examiner. Sometimes the answer to one part of a question is used in a later part of the same question. In this case, A marks will often be ‘follow through’. In such cases you must ensure that you refer back to the answer of the previous part question even if this is not shown within the image zone. You may find it easier to mark follow through questions candidate-by-candidate rather than question-by-question.Y422/01 Mark Scheme November 2020 5 f Unless units are specifically requested, there is no penalty for wrong or missing units as long as the answer is numerically correct and expressed either in SI or in the units of the question. (e.g. lengths will be assumed to be in metres unless in a particular question all the lengths are in km, when this would be assumed to be the unspecified unit.) We are usually quite flexible about the accuracy to which the final answer is expressed; over-specification is usually only penalised where the scheme explicitly says so. • When a value is given in the paper only accept an answer correct to at least as many significant figures as the given value. • When a value is not given in the paper accept any answer that agrees with the correct value to 2 s.f. unless a different level of accuracy has been asked for in the question, or the mark scheme specifies an acceptable range. NB for Specification A the rubric specifies 3 s.f. as standard, so this statement reads “3 s.f” Follow through should be used so that only one mark in any question is lost for each distinct accuracy error. Candidates using a value of 9.80, 9.81 or 10 for g should usually be penalised for any final accuracy marks which do not agree to the value found with 9.8 which is given in the rubric. g Rules for replaced work and multiple attempts: • If one attempt is clearly indicated as the one to mark, or only one is left uncrossed out, then mark that attempt and ignore the others. • If more than one attempt is left not crossed out, then mark the last attempt unless it only repeats part of the first attempt or is substantially less complete. • if a candidate crosses out all of their attempts, the assessor should attempt to mark the crossed out answer(s) as above and award marks appropriately. h For a genuine misreading (of numbers or symbols) which is such that the object and the difficulty of the question remain unaltered, mark according to the scheme but following through from the candidate’s data. A penalty is then applied; 1 mark is generally appropriate, though this may differ for some units. This is achieved by withholding one A or B mark in the question. Marks designated as cao may be awarded as long as there are no other errors. If a candidate corrects the misread in a later part, do not continue to follow through. E marks are lost unless, by chance, the given results are established by equivalent working. Note that a miscopy of the candidate’s own working is not a misread but an accuracy error. i If a calculator is used, some answers may be obtained with little or no working visible. Allow full marks for correct answers provided that there is nothing in the wording of the question specifying that analytical methods are required such as the bold “In this question you must show detailed reasoning”, or the command words “Show” and “Determine. Where an answer is wrong but there is some evidence of method, allow appropriate method marks. Wrong answers with no supporting method score zero. If in doubt, consult your Team Leader. j If in any case the scheme operates with considerable unfairness consult your Team Leader.Y422/01 Mark Scheme November 2020 6 Question Answer Marks AOs Guidance 1 (a) P(all 4) = 4 10 × 3 9 × 2 8 × 1 7 = 1 210 M1 A1 [2] 1.1 1.1 AG 1 (b) E(X) = 1.6 B1 1.1a BC Var(X) = 0.64 B1 [2] 1.1 BC 1 (c) Loss L = 1.00 – 0.4X B1 3.3 E(L) = 0.36 (36 pence) SD(L) = 0.4*0.8 = 0.32 (32 pence) M1 A1 1.1 1.1 [3] 1 (d) Expected amount = 1.00 – (0.25E(X) + 100 × 1 210 ) M1 1.1 Allow M1 if use original distribution but miss out 1×1/210 term (12.3809…) Allow answer rounded to 12 (pence) provided there 12.4 pence loss A1 [2] 1.1 is working 2 (a) (i) People with the antigen occur randomly and occurrences are independent with constant probability 0.00025. The number of people with the antigen out of 1200 is being counted, so a binomial distribution is appropriate. Because n (= 1200) is large and p (= 0.00025) is small a Poisson distribution is also appropriate E1 E1 E1 [3] 2.4 2.4 2.4 For partial explanation of binomial For full explanation For explanation of Poisson. 2 (a) (ii) Binomial (1200, 0.00025) or Poisson (0.3) P(X = 3) = 0.0033 M1 A1 3.3 1.1 NB both distributions give same answer to 4 dp P(X > 3) = 0.0003 A1 [3] 1.1 2 (b) P(≤5000 needed) = 1 – P(0 or 1 in 5000 have antigen) M1 3.3 Use B(5000, 0.00025) or Po(1.25) = 1 – 0.6446 = 0.3554 B1 A1 3.4 1.1 [3]Y422/01 Mark Scheme November 2020 7 Question Answer Marks AOs Guidance 3 (a) Mean of 2 large bags ⁓ N(201.3,1.72/2 ) M1 3.3 For Normal and mean Allow M1 for total N(402.6, 5.78) even if not used i.e. N(201.3, 1.445) A1 1.1 For correct variance P(Mean > 200) = 0.8603 B1 3.4 [3] 3 (b) Need distribution of 8 small – 2 medium – 1 large M1 3.1b For distribution required. soi eg correct mean or variance Method for mean Method for variance Correct distribution mean = 8 × 51.5 – 2 × 100.7 – 1 × 201.3 M1 3.3 variance = 8 × 1.12 + 2 × 1.62 + 1 × 1.72 M1 1.1 so distribution is N(9.3, 17.69) A1 1.1 P( > 0) = 0.9865 A1 [5] 3.4 4 (a) Because the sample size is large so by the central limit theorem the sample mean is approximately Normally distributed E1 E1 [2] 2.4 2.4 Must mention sample mean for second mark 4 (b) –0.0286 < µ < 0.2632 B1 1.1 [1] 4 (c) This is σ/√60 B1 3.4 [1] 4 (d) The confidence interval contains zero Which suggests that the two measurements broadly agree. E1 E1 [2] 3.4 2.4 Allow valid alternative answers such as ‘Although the interval contains zero almost all of the interval is above zero, which suggests that on average the digital gauge may be reading lower than the traditional gauge.’Y422/01 Mark Scheme November 2020 8 Question Answer Marks AOs Guidance 5 (a) If all did the same test first, the experience gained in the first test might affect their performance in the second test E1 E1 [2] 3.4 2.4 Allow 1 mark for ‘To avoid bias’ or ‘because one test might affect the other test’ oe 5 (b) x =12.375 y =11.79375 2 2554.87 (198.0 188.7 /16) 219.7075 2936.92 198.0 /16 486.67 xy xx S b S − × = = = − = 0.4515 For correct line (y on x) hence regression line equation is: y y b x x − = − ( ) y – 11.79375 = 0.4515 (x – 12.375) y = 0.4515 x + 6.207 M1 A1 B1 M1 A1 [5] 1.1a 1.1 1.1 3.3 1.1 For attempt at gradient (b) For 0.4515 cao For equation of line FT their b 5 (c) Prediction for 12 is 11.6 Prediction for 25 is 17.5 B1 B1 [2] 3.4 1.1 FT Allow B1B0 if answers given to more than 2 dp FT 5 (d) Because the points do not lie very close to the line, the first prediction is only moderately reliable. The second prediction is rather less reliable because in addition it is extrapolation. E1 E1 [2] 2.2a 2.4 Allow 1 mark for either not very close to line and so not very reliable or for second value is extrapolation so unreliable. 5 (e) Coordinates (18, 1.9) The expert should check whether this data item is genuine and if not then remove it from the analysis B1 E1 [2] 1.1 3.5c Allow y-coordinate between 1.7 and 2 ⇒⇒Y422/01 Mark Scheme November 2020 9 Question Answer Marks AOs Guidance 6 (a) H0: ρ = 0 , H1: ρ ≠ 0 (two-tailed test) where ρ is the population correlation coefficient (between wind-speed and nitrogen dioxide level) For n = 10, 5% critical value = 0.2144 Since 0.3231 > 0.2144 the result is significant. There is sufficient evidence to reject H0 There is sufficient evidence at the 10% level to suggest that there is correlation between wind-speed and nitrogen dioxide level B1 B1 B1 M1 A1 [5] 3.3 2.5 3.4 1.1 2.2b For both hypotheses For defining ρ For critical value For comparison leading to a conclusion FT for conclusion in words 6 (b) The population from which the data are drawn must be bivariate Normally distributed. B1 [1] 2.5 Do not allow ‘Data must be bivariate Normally distributed’ but condone ‘Data must be from a bivariate Normal distribution’ 6 (c) For very large samples, the sample correlation coefficient is very often significant. However as in this case those significant correlations which are very close to zero are of very little real use. E1 E1 [2] 3.5a 3.5a oe eg ‘large sample size means lower values of r can be significant’ 6 (d) Although four out of five of the correlation coefficients are statistically significant, very little use can be made of most of them as the effect sizes are small. However the effect size of 0.25 between wind-speed and NO2 suggests that the windier it is, the higher the level of NO2 pollution. E1 E1 2.2b 2.2b [2]Y422/01 Mark Scheme November 2020 10 Question Answer Marks AOs Guidance 7 (a) The population from which the sample is drawn must be Normally distributed E1 [1] 1.2 Do not allow ‘The sample is Normally distributed’ 7 (b) Because the Normal probability plot appears to be linear. E1 [1] 3.5a Do not allow ‘linear correlation’ 7 (c) Sample mean = 285.2 B1 1.1 DR BC Allow 285 BC For general form For 5 degrees of freedom For 2.571 For 15.30 √6 OE Condone 269 < μ < 301 provided working seen, but must be from 285.2, not from 285 Sample SD = 15.30 B1 1.1 Confidence interval is given by 285.2 ± 2.571× 15.30 √6 M1 M1 A1 M1 3.4 1.1a 1.1 1.1 269.1 < μ < 301.3 or 285.2 ± 16.1 A1 [7] 1.1Y422/01 Mark Scheme November 2020 11 Question Answer Marks AOs Guidance 8 Est. population mean 51.92 1.298 40 = = B1 1.1 DR Est. population variance = − 39 40 1 51.92 (70.57 2 ) M1 1.1 = × 39 1 3.1778 = 0.0815 A1 1.1 or est. pop sd = 0.2854 Test is based on a Normal distribution B1 3.4 soi H0: µ = 1.25, H1: µ ≠ 1.25, B1 1.1a Both correct; if stated in words only, must include ‘population’ where µ is the population mean (electricity consumption) B1 1.2 For definition of µ in context Test statistic is 1.298 1.25 0.0815 / 40 − = 1.064 M1 3.3 Allow wrong mean or sd here Alternative: calculate P(X > 1.298) using N(1.25, 0.0815/40) = 0.856 Critical value (2-tailed) at 5% level is 1.96 B1 1.1 Use of 0.975 (not 0.95) 1.064 < 1.96 so not significant (do not reject H0) M1 2.2b FT wrong (sensible) c.v. and test statistic if calculation is of right form for M1 but not for A1 Insufficient evidence to suggest that the website claim is not true A1 3.5a [10]Y422/01 Mark Scheme November 2020 12 Question Answer Marks AOs Guidance 9 (a) p = 1.72/10 = 0.172 M1 A1 [2] 3.3 1.1 9 (b) Cell C2 = 0.1515 Cell D2 = 22.7193 B1 B1 3.4 1.1 Allow 22.725 from 0.1515 Cell E2 = (22.7193 39)2 22.7193 − = 11.6668 M1 A1 [4] 1.1a 1.1 For correct form Allow 11.6557 from 22.725 9 (c) Because otherwise at least one expected frequency would be less than 5 so too small for the test to be valid. E1 [1] 3.5b For ‘less than 5 so invalid’ 9 (d) H0: the binomial model is appropriate H1: the binomial model is not appropriate B1 2.4 For both. Ignore any reference to value of binomial parameter. X 2 = 23.32 Refer to χ32 Critical value at 1% level = 11.34 23.32 > 11.34 Result is significant There is insufficient evidence to suggest that the binomial model is a good fit. B1 B1 B1 M1 A1 [6] 1.1 3.4 1.1 1.1 2.2b For degrees of freedom = 3 soi For comparison with critical value Conclusion in context 9 (e) The contribution of 11.67 suggests that far more trays have no rotten peaches than would be expected if a binomial model were appropriate. E1 3.5a The contribution of 6.22 suggests that far more trays have four or more rotten peaches than would be expected if a binomial model were appropriate. The other three smaller contributions suggest that the numbers of trays with 1, 2 or 3 rotten peaches are very roughly as expected if a binomial model were appropriate. E1 E1 [3] 3.5a 3.5a Allow answers suggesting less than expected for 2 trays (or similar valid answers).Y422/01 Mark Scheme November 2020 13 Question Answer Marks AOs Guidance 10 (a) Estimate of P(X − 2Y > 0) is 0.5 B1 1.1 Estimate of P(X − 2Y > 1) is 0.45 B1 1.1 [2] 10 (b) By using more rows in the spreadsheet E1 2.4 Condone ‘Run more simulations’, ‘take more samples’ or [1] ‘increasing the number of values sampled’ o.e. 10 (c) E(W) = 0 Var( ) 20 0.3 0.7 X = × × B1 M1 1.1 3.3 = 4.2 A1 1.1 Var( ) 3 Y = B1 1.1 Var( 2 ) 4.2 2 3 X Y − = + × 2 =16.2 M1 A1 3.4 1.1 Distribution is N 0, ( 16.2 50 ) M1 3.3 For Normal M1 1.1 For parameters P(W > 1) = P(Normal > 1.01) = 0.0380 A1 [9] 1.1 (Omitting cc gives 0.0395) 11 (a) F(4) = 1 so k(8×42 – 43 – 24) = 1 So 40k = 1 so 1 k = 40 B1 [1] 2.1 AG 11 (b) P( 2.5 ≤ T ≤ 3.5) = F(3.5) – F(2.5) 1 1 2 3 2 3 = × − − − × − − 40 (8 3.5 3.5 24) (8 2.5 2.5 24) 40 = 0.51875 M1 A1 [2] 1.1a 1.1 11 (c) 0.025(8�2 – �3 – 24) = 0.5 (8�2 – �3 – 24) = 20 �3 − 8�2 + 44 = 0 M1 A1 [2] 2.1 1.1 Condoned additional substitution of 2 in equation since this gives zero AG 11 (d) F(2.945) = 0.496 F(2.955) = 0.501 B1 3.4 For either OR Calculation of �3 − 8�2 + 44 For 2.945 (= 0.158) For 2.955 (= –0.053) So change of sign So median is 2.95 to 2 dp E1 [2] 1.1Y422/01 Mark Scheme November 2020 14 Question Answer Marks AOs Guidance 11 (e) 1 2 f ( ) (16 3 ) t t t = − 40 E(T) = ∫24 0.025�(16� – 3� 2)�� = 2.967 B1 M1 A1 3.1a 1.1 1.1 BC E(T2) = ∫24 0.025�2(16� – 3�2)�� = 9.12 M1 1.1 BC Var( ) 9.12 2.967 0.3189 T = − = 2 SD = 0.5647 A1 1.1 P( µ – σ < T < µ + σ) = P(2.402 < T < 3.531). M1 3.3 = F(3.531) – F(2.402) = 0.586 A1 [7] 1.1 11 f B1 B1 [2] 1.1 1.1 For main part of graph For axes and for part where f(t) = 0 Numbers not required on F(t) axis but 2 and 4 required on t-axis 11 g The probability will be less than the Normal probability because the graph of the Normal distribution is more peaked and only the central section of the Normal curve is involved E1 E1 [2] 2.2a 2.2a For partial explanation. For full explanation Must clearly state which is greater to get any marks at all.OCR (Oxford Cambridge and RSA Examinations) The Triangle Building Shaftesbury Road Cambridge CB2 8EA [Show More]

Last updated: 2 years ago

Preview 1 out of 16 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Reviews( 0 )

$6.50

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

66
0

Document information


Connected school, study & course


About the document


Uploaded On

Oct 10, 2022

Number of pages

16

Written in

Seller


seller-icon
Bobweiss

Member since 4 years

39 Documents Sold

Reviews Received
2
0
0
0
2
Additional information

This document has been written for:

Uploaded

Oct 10, 2022

Downloads

 0

Views

 66

Document Keyword Tags

Recommended For You

Get more on AS Mark Scheme »

$6.50
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·