NASCLA Accredited Exam 2022
(with verified Answers)
What are 4 types of Steel Decking?
ANS:- Composite, Roof, Cellular, and Form
What are the lengths of Full sheets of Steel Decking?
Who has full responsibility fo
...
NASCLA Accredited Exam 2022
(with verified Answers)
What are 4 types of Steel Decking?
ANS:- Composite, Roof, Cellular, and Form
What are the lengths of Full sheets of Steel Decking?
Who has full responsibility for Safety on a construction site?
ANS:- 12", 18", 24", 30", or
36". All are usually less than 40"
ANS:- The prime
contractor
Who is responsible to ensure workers have appropriate eye protection?
ANS:- The
employer
Safety belt lanyard shall be a minimum of?
ANS:- 1/2 inch nylon, w/ max length to
provide for a fall of no greater than 6ft. The rope shall have a nominal breaking
strength of 5,400 lbs.
When should safety nets be provided?
feet above ground or water surface or where use of ladders, scaffolds, catch
ANS:- When workplaces are more than 25
platforms, temporary floors, safety lines, or safety belts are impractical
What are the different types of Safety Equipment?
ANS:- Head, Eye and Face, and
Respiratory protection. Safety belts, lifelines, lanyards, and safety nets
Where should quantities of flammable liquid in excess of 25 gallons be stored in that
is acceptable or approved?
ANS:- Acceptable wooden storage and Approved metal
storage cabinets. Cabinets shall be labeled in conspicuous lettering "Flammable-
Keep Away from Open Flames"
LP-Gas storage outside of buildings for containers waiting use shall be located from
the nearest building or group of buildings in accordance to?
- 0ft
ANS:- 1. 500 lbs or less
2. ***501 to 6,000 lbs - 10ft
3. 6,001 to 10,000 lbs - 20ft
4. Over 10,000 lbs - 25ft
Clearance and mounting of temporary heating devices are?
ANS:- 1. Room heater,
circulating type - 12" sides, 12" rear, 18" chimney connector
2. ***Room heater, radiant type - 36" sides, 36" rear, 18" chimney connector
How far shall heaters used in the vicinity of the combustible tarpaulins, canvas, or
similar coverings be located from the coverings?
ANS:- 10 feet from coverings
Material stored inside buildings under construction shall not be placed with what
distances?
ANS:- 6 feet of any hoistway or inside floor openings, ***not within 10 feet
of exterior wall which does not extend above the top of the material stored
Bagged materials shall be stacked by stepping back the layers and cross-keying the
bags at least by how many bags high?
ANS:- 10 bags high
Brick stacks shall not be more than?
ANS:- 7 feet in height
[Show More]