Defense Acquisition University
CLC 222 (COR) Training
Module 6 Q&A 2022 Test. 100%
DEFINE EVM AND COST PERFORMANCE REPORTING:An Earned Value Management system
that is formally validated and accepted by the cogni
...
Defense Acquisition University
CLC 222 (COR) Training
Module 6 Q&A 2022 Test. 100%
DEFINE EVM AND COST PERFORMANCE REPORTING:An Earned Value Management system
that is formally validated and accepted by the cognizant contracting officer is required on cost or
incentive contracts valued at or greater than ____. $50 million
When "contracting out" governmental functions, it is the policy of the Government to utilize nonpersonal service contracts whenever possible.
The COR can use a variety of techniques for verifying performance, such as: . 100% inspection
The contractor is performing exceptionally, especially Sally. How do you as the COR recognize
Sally's accomplishments?
The Quality Assurance Surveillance Plan identifies ALL work requiring surveillance and the method
of surveillance:
According to the Davis Bacon Act (DBA), contractor employees shall be paid no less than the
prevailing wage rates as determined by the Secretary of Labor and ____________. Employees shall
The American National Standards Institute/Electronic Industries Alliance (ANSI/EIA) established
_______ management system guidelines that ensure and provide complete information needed to
make management decisions:
LIST THE CONTENTS OF A QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)/
PERFORMANCE ASSESSMENT PLAN (PAP):A Quality Assurance Surveillance Plan (QASP) is
__________? .
LIST THE CONTENTS OF A QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)/
PERFORMANCE ASSESSMENT PLAN (PAP):A Quality Assurance Surveillance Plan is included in
the contractor proposal and accepted by the Government.
IN PERFORMANCE BASED CONTRACTS, IDENTIFY TECHNIQUES FOR VERIFYING
PERFORMANCE OF WORK IAW THE GOVERNMENT?S QASP:Considerations for choosing an
appropriate quality assurance surveillance method for a service contract include: x
IN PERFORMANCE BASED CONTRACTS, IDENTIFY TECHNIQUES FOR VERIFYING
PERFORMANCE OF WORK IAW THE GOVERNMENT?S QASP:The Quality Assurance
Surveillance Plan (QASP) provides the government inspection plan to ensure contractor quality. .
EVALUATE THE CONTRACTOR?S COMPLIANCE WITH SAFETY, SECURITY, LABOR, SERVICE
CONTRACT ACT, ENVIRONMENTAL LAW, AND REGULATORY REQUIREMENTS:Information
security ensures that sensitive or proprietary information is disclosed or discussed only to those who
have a need to know.
EVALUATE THE CONTRACTOR?S COMPLIANCE WITH SAFETY, SECURITY, LABOR, SERVICE
CONTRACT ACT, ENVIRONMENTAL LAW, AND REGULATORY REQUIREMENTS:The Service
Contract Act was enacted to protect economies in the geographical areas where the contract is
performed. From the following statements, select the correct statement pertaining to the Service
Contract Act. .
DISTINGUISH BETWEEN PERSONAL AND NON-PERSONAL SERVICES AND ACT
ACCORDINGLY WHEN WORKING WITH CONTRACTOR PERSONNEL:
.
DISTINGUISH BETWEEN PERSONAL AND NON-PERSONAL SERVICES AND ACT
ACCORDINGLY WHEN WORKING WITH CONTRACTOR PERSONNEL:When working with
contractor personnel on a non-personal services contract, the COR should:
DEFINE EVM AND COST PERFORMANCE REPORTING:Earned Value Management is
__________. . A widely accepted industry best practice for project management used across the
ANALYZE THE INSPECTION CLAUSES FOR FIXED TYPE AND COST REIMBURSEMENT
CONTRACTS USED IN CONSTRUCTION:In construction, "differing site conditions" are defined as
known conditions at the site that the contractor missed during site visits and failed to read in the
contract .
ANALYZE THE INSPECTION CLAUSES FOR FIXED TYPE AND COST REIMBURSEMENT
CONTRACTS USED IN CONSTRUCTION:In construction; a Contracting Officer may suspend work
for a "reasonable" period of time. It is imperative a COR maintain adequate records because: .
DEFINE THE MAJOR ACTIONS REQUIRED TO EVALUATE THE CONTRACTOR?S
ENGINEERING EFFORTS AND MANAGEMENT SYSTEMS:The American National Standards
Institute/Electronic Industries Alliance (ANSI/EIA) established 36 management system guidelines
that ensure and provide complete information needed to make management decisions.
DEFINE THE MAJOR ACTIONS REQUIRED TO EVALUATE THE CONTRACTOR?S
ENGINEERING EFFORTS AND MANAGEMENT SYSTEMS:The ANSI/EIA
[Show More]