Engineering > EXAM > Elevator Mechanic Test - Section 2 QUESTIONS WITH COMPLETE SOLUTIONS (All)

Elevator Mechanic Test - Section 2 QUESTIONS WITH COMPLETE SOLUTIONS

Document Content and Description Below

In a modernization they plan on moving the controller 30 feet away which ends up resulting in a voltage drop. What do you do? A) Call electric company for a step-up transformer, B) Use a bigger wire. ... Correct Answer: B) Use a bigger wire. Governor trips at 115% of rated speed, the over speed switch trips at 90% of the 115%. Correct Answer: If you are cutting something with a power saw, which way does piece you are cutting face. Up or down? Correct Answer: Down. They give you a voltage of 480 on primary and 216 on secondary and a current. What transformer would you need to order? 1KVA 1to1, 2KVA 2to1, or 3KVA 2to1? Correct Answer: 2KVA 2to1 You have 15 full 16lob rails, and two 8' sections. How much do they weigh? Correct Answer: Static load test - car drifts down 15 inches in ten minutes with no noticeable oil leak. Where is the most likely leak? Correct Answer: Underground You need to reset the step level switch on an escalator. Where is it located? A) top B) bottom C) Both. Correct Answer: C) Both What is needed for a false platform? Correct Answer: False cars require spring-loaded safeties held in locked position and barricades and netting on top, 600-pound capacity. A working platform requires the governor to be installed, and to be counterbalanced correctly. 3 cars, 12 floors. 3 floors do not get PIs. How many PIs do you order? Correct Answer: 27 PIs. The should you a call button wirting diagram with 3 floors, up and down with a common and ground wire. How many wires are needed to wire it? Correct Answer: No answer noted. Where would you look for how many fixtures you need for a job? Correct Answer: Abstract PI goes out too fast at 2nd floor, what contacts are problem on print? Correct Answer: What percentage of accidents are alcohol related? Correct Answer: 75% What is an ok substitute for a top rail for a barricade? A) 1/4 inch wire rope, B) 1/4 steel banding, C) 3/16 nylon rope Correct Answer: A) 1/4 inch wire rope What is the tolerance of a barricade? Correct Answer: 2" [Show More]

Last updated: 2 years ago

Preview 1 out of 4 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Reviews( 0 )

$6.00

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

64
0

Document information


Connected school, study & course


About the document


Uploaded On

Nov 09, 2022

Number of pages

4

Written in

Seller


seller-icon
THE LORD IS GOD

Member since 3 years

40 Documents Sold

Reviews Received
0
0
1
0
2
Additional information

This document has been written for:

Uploaded

Nov 09, 2022

Downloads

 0

Views

 64

Document Keyword Tags

More From THE LORD IS GOD

View all THE LORD IS GOD's documents »

Recommended For You

Get more on EXAM »

$6.00
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·