Logistics > QUESTIONS & ANSWERS > Production Planning And Workflow MSSC (All)
Production Planning And Workflow MSSC A process's ________________ is the rate at which a production system creates a finished product. - ✔✔Capacity _______________ is a method of organizing t ... he production of a similar group of products in a cell, or work cell, that contains all the machines that are needed to produce that group of products. - ✔✔cellular manufacturing In a production process, the time required to create a finished product is determined by the slowest processing station. The slowest station is called a ____________ , therefore limits the maximum rate of production. - ✔✔Bottleneck Companies use ______________ to show data about progress of production. - ✔✔job status reports Reallocation of resources is the best way to ___________. - ✔✔increase production if current production cannot meet the demand Manufacturing paths are indicated by _____________ documents. - ✔✔process flow Only the supervisor or a person in the quality assurance department can decide if a part on hold should be __________. - ✔✔Scrapped or reworked The operation number column in the routing sheet contains the operation number, also a __________ number, which indicates its place in the manufacturing process. - ✔✔Sequence Red tags are used to indicate scrapped parts while a yellow tag indicates a part that _____. - ✔✔has been placed on hold Machine time, quality requirements, and task time are __________. - ✔✔Required documents for a process A part that is out-of-spec can either be scrapped or _____________. - ✔✔Reworked to bring the part within the specifications On a bill of materials, the ___________ indicates which parts form each subassembly. - ✔✔Part level number A _____________ is a list of all the materials and components required to make the product and quality of each. - ✔✔Bill of materials Spare parts used in repair work are typically included in the calculation of ________________. - ✔✔Production downtime For a 365-day year with 30 days of scheduled downtime, what is the availability? - ✔✔335 days minus unscheduled downtime Due to the increase in gasoline costs, a part vendor is offsetting his delivery costs by increasing the price of all his products 15%. If the cost of the parts we're buying was $18.50/unit, what will the cost be after the price increase? - ✔✔$21.28 The accuracy of a time study is improved if you time ___________ doing the same job. - ✔✔More than one worker The average time a specific job takes is determined by ____________. - ✔✔Time and motion studies A system that supplies quality products using a pull system instead of the traditional push system of production flow is _____________. - ✔✔JIT or just in time An increase in the number of inspections is likely to do all the following except? - ✔✔Reduce the number of parts that are out of spec Companies strive to eliminate waste and non value added work through a process of ________________. - ✔✔Continuous improvement As part of a ____________, manufacturer's see end of the line inspections as one form of waste. - ✔✔Lean manufacturing process Machine downtime due to failures results in _____________. - ✔✔Lower productivity per labor hour Reducing the amount of non-value work in a process _______________. - ✔✔Is a method of improving the process [Show More]
Last updated: 2 years ago
Preview 1 out of 4 pages
Buy this document to get the full access instantly
Instant Download Access after purchase
Buy NowInstant download
We Accept:
Can't find what you want? Try our AI powered Search
Connected school, study & course
About the document
Uploaded On
Jan 28, 2023
Number of pages
4
Written in
All
This document has been written for:
Uploaded
Jan 28, 2023
Downloads
0
Views
95
Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Scholarfriends · High quality services·