Available to Promise (ATP) - Correct Answer-The ability to check if the components on
a work order are in stock.
Batch - Correct Answer-Formerly referred to as "Condition Code." Classifies materiel in
terms of readine
...
Available to Promise (ATP) - Correct Answer-The ability to check if the components on
a work order are in stock.
Batch - Correct Answer-Formerly referred to as "Condition Code." Classifies materiel in
terms of readiness for issue.
Bill of Material (BOM) - Correct Answer-A maintenance bill of material (BOM) is a
complete structured list of the components making up a piece of equipment or
assembly.
Bill of Materials (BOM) - Correct Answer-An exploded view of a component, end item, or
other equipment allowing users to view the authorized parts.
Component - Correct Answer-Repair parts used to repair end items. Engines and
transmissions are serialized components that are included in the GCSS-Army
equipment structure.
Configurable Material - Correct Answer-A materiel that has more than one allowable
configurations based on interchangeable weapon systems/weapon sub-systems and
components.
Counter - Correct Answer-An object (i.e. odometer, tachometer, etc) mounted on a
piece of equipment by which readings are taken to object wear, consumption, or the
reduction of a working supply.
Deobligation - Correct Answer-Completing a utilization notification (Formerly "Closing
out a Dispatch").
Functional Location - Correct Answer-The hierarchical location of a component or
equipment and any of its sub-components. It also represents the place at which a
maintenance task is performed.
Install and Dismantle - Correct Answer-Formerly referred to as "Controlled Exchange."
The removal of serviceable components from unserviceable, economically reparable
end items for immediate reuse in restoring a like item to an operational condition.
Integrated Product and Process Engineering (iPPE) - Correct Answer-Loads header
and structures of an end item. The allowable material is linked to the appropriate nodes.
These structures and the source for the allowable list are determined by MMDF / LCF.
[Show More]