SAP ERP includes the following (2 are correct)
a. SAP Customer Relationship Management
b. SAP Supply Chain Management
c. SAP NetWeaver
d. SAP ECC Core - CORRECT AN
...
ERP SAP 200 Questions with Verified Answers
SAP ERP includes the following (2 are correct)
a. SAP Customer Relationship Management
b. SAP Supply Chain Management
c. SAP NetWeaver
d. SAP ECC Core - CORRECT ANSWER c. SAP NetWeaver
d. SAP ECC Core
The new capabilities included in an enhancement package focus on which of the following areas: (2 are correct)
a. Simplification
b. Extendibility
c. Functionality
d. Technical Delivery - CORRECT ANSWER a. Simplification
c. Funtionality
What is the highest organizational element in SAP?
a. Plant
b. Client
c. Company Code
d. Sales Organization
e. Purchasing Organization - CORRECT ANSWER b. Client
What is the purpose of the organizational elements in SAP? (2 are correct)
a. They represent a legal entity
b. They represent the application server
c. Data is entered using organizational elements
d. Data is tracked using organizational elements - CORRECT ANSWER c. Data is entered using organizational elements
d. Data is tracked using organizational elements
Which of the following describe data and transactions in the SAP system? (2 are correct)
a. Document is created for every transaction in the system.
b. Documents are created using master data and organizational elements.
c. Master data can be deleted at any time,
d. Master data entered at the client level can only be used by one company code - CORRECT ANSWER a. Document is created for every transaction in the system.
b. Documents are created using master data and organizational elements
Which of the following are correct regarding Master Data Records in an ERP system? (3 are correct)
a. Master data information is organized into view
b. Allows for data redundancies
c. Is used long-term in the SAP System
d Eliminates the need for data conversion
e. Supports the execution of key business processes - CORRECT ANSWER a. Master data information is organized into view
c. Is used long-term in the SAP System
e. Supports the execution of key business processes
IT practices look at the overall SAP NetWeaver platform in a way that focuses on key business goals rather than on isolated technology components. These include goals familiar to almost any IT organization and include: (3 are correct)
a. The need to combine different integration technologies
b. The need for application platforms for development
c. The need to develop composite applications leveraging existing system investments
d. The desire to flexibly build new business process - CORRECT ANSWER a. The need to combine different integration technologies
c. The need to develop composite applications leveraging existing system investments
d. The desire to flexibly build new business process
Rapidly create new enterprise-scale applications that drive your company's differential advantage describes which IT Practices?
a. Application Governance
b. Service-oriented architecture design and deployment
c. Custom Development
d. Consolidation - CORRECT ANSWER c. Custom Development
Consolidate, rationalize, synchronize, and manage all master data for improved business processed describes?
a. User Productivity Enablement
b. Data Unification
c. Information Management
d. Business Event Management - CORRECT ANSWER b. Data Unification
Which component of NetWeaver enables companies to integrate data from across he enterprise and transform it into practical, timely business information to drive sound decision making:
a. Portal Infrastructure
b. Collaboration
c. Business Intelligence
d. Knowledge Management - CORRECT ANSWER c. Business Intelligence
With regard to enhancements, which of the following is true? (3 are correct)
a. Testing is not necessary after enhancements are installed.
b. You only update software components related to the functionality you want to use.
c. Support packages are for customer service.
d. Installation is non-reversible.
e. You install enhancement packages and Support Packages in a single step. - CORRECT ANSWER b. You only update software components related to the functionality you want to use.
d. Installation is non-reversible.
e. You install enhancement packages and Support Packages in a single step.
Which of the following is a layer in the SAP NetWeaver BW Architecture? (2 are correct)
a. Extraction
b. Information Structure
c. Data Analysis and Planning
d. Characteristics
e. Key Figures - CORRECT ANSWER a. Extraction
c. Data Analysis and Planning
Which of the following statements about InfoCubes are correct? 2 are correct
a. An InfoCube consists of a single database
b. An InfoCube has 16 fact tables and 1 dimension table
c. An InfoCube is a central data container used for reports and analysis
d. A fact table can contain 233 key figures - CORRECT ANSWER c. An InfoCube is a central data container used for reports and analysis
d. A fact table can contain 233 key figures
Which statements about SAP BW are correct? 3 are correct
a. Enables OLAP reporting
b. The two types of data stores - physical and logical
c. The central data container in SAP BW is called an InfoProvider
d. An InfoCube links several databases in a Star Schema - CORRECT ANSWER a. Enables OLAP reporting
b. The two types of data stores - physical and logical
d. An InfoCube links several databases in a Star Schema
What are examples of logical views of physical data stores? 4 are correct
a. Infoset
b. Basic Cube
c. Virtual InfoCube
d. Remote Cubes
e. InfoCubes
f. Multi-Providers - CORRECT ANSWER a. Infoset
c. Virtual InfoCube
d. Remote Cubes
f. Multi-Providers
Which of the following statements are correct for a Company Code? 2 are correct
a. Can belong to more than 1 Controlling Area
b. General Ledger administration is set at the level of the Company Code
c. The business Area is identified via the Company Code
d. Many Company Codes can belong to the same Controlling Area - CORRECT ANSWER b. General Ledger administration is set at the level of the Company Code
d. Many Company Codes can belong to the same Controlling Area
Each GL Account has a Chart of Account and Company Code segment. T/F - CORRECT ANSWER True
Each GL Account is defined according to the Chart of Accounts. T/F - CORRECT ANSWER True
Inside the GL Account you can view the balance for each vendor. T/F - CORRECT ANSWER False - The balance can be found in the sub-ledger.
Which of the following statements are correct for the Chart of Accounts? 3 are correct
a. Can be country specific
b. Contains definition of all GL accounts
c. Contains information for account control and management
d. Has a company code assigned to it
e. Is assigned to a Profit Center - CORRECT ANSWER a. Can be country specific
b. Contains definition of all GL accounts
d. Has a company code assigned to it
The _______________ controls the creation of the company code segment fields for a General Ledger Account. - CORRECT ANSWER Account Group
Which of the following statements are true regarding company codes?
a. A company code uniquely identifies a business area
b. A client can only have one company code.
c. The general ledger is managed at company code level
d. The company code can be assigned to multiple controlling areas - CORRECT ANSWER c. The general ledger is managed at company code level
Which of the following statements are true regarding the chart of accounts? The chart of accounts.... 2 are correct
a. contains the definitions of all G/L accounts in a ordered form
b. can be country specific
c. can only have one company code assigned to it
d. determines, during document posting, if an account is credited or debited. - CORRECT ANSWER a. contains the definitions of all G/L accounts in a ordered form
b. can be country specific
Which Organizational Structure is required if you want to use Profitability Analysis?
a. Business Area
b. Company Code
c. Controlling Area
d. Operating Concern - CORRECT ANSWER d. Operating Concern
You've been asked to provide an explanation of some of the organizational levels in SAP ERP. Which of the following statements will you say is true?
a. A company code can belong to more than one controlling area.
b. A plant must be allocated to a company code.
c. A controlling area and a company code must have the same local currency
d. A business area and company code are assigned to each other in the enterprise structure in the IMG - CORRECT ANSWER b. A plant must be allocated to a company code.
A client has asked you to explain the use of currencies in SAP ERP Management Accounting. What currencies will you say can be used in management accounting? 3 are correct
a. Transaction
b. Operative
c. Object Currency
d. Controlling Area
e. Consolidation - CORRECT ANSWER a. Transaction
c. Object Currency
d. Controlling Area
Which of the following components are parts of SAP Management Accounting? 3 are correct
a. Profitability Analysis
b. Accounts Payable
c. Overhead Cost Controlling
d. Product Cost Controlling
e. Payroll Cost Controlling - CORRECT ANSWER a. Profitability Analysis
c. Overhead Cost Controlling
d. Product Cost Controlling
An expense can only be recorded in Financial Accounting or Management Accounting but not both. T/F - CORRECT ANSWER False
Cost and revenue postings to Management Accounting can result in true (or real) and statistical postings. Which of the items below are considered true objects? 3 are correct
a. Cost Center
b. Profit Center
c. Project
d. Profitability Segment
e Statistical Order - CORRECT ANSWER a. Cost Center
c. Project
d. Profitability Segment
Which of the following statements about Purchasing Organization are correct?
a. Negotiates Conditions of purchase with vendors
b. Must only purchase for one Company
c. Can purchase for multiple plants
d. Identifies a buyer or group of buyers - CORRECT ANSWER a. Negotiates Conditions of purchase with vendors
c. Can purchase for multiple plants
The material type controls whether inventory management takes place on a value basis. What are the material types that exist for consumable materials? 2 are correct
a. maintenance materials
b. production materials
c. non-valuated materials
d. non-stock materials
e. account assigned materials - CORRECT ANSWER c. non-valuated materials
d. non-stock materials
What organization elements control the entry of the data views for a vendor?
a. Client and Company Code
b. Client, Company Code, and Plant
c. Client and Purchasing Organization
d. Client, Company Code, and Purchasing Organization
e. Company Code - CORRECT ANSWER d. Client, Company Code, and Purchasing Organization
What information can't be maintained on a Purchasing Info Record?
a. Freight and Discounts
b. Vendor Material Number
c. Vendor Address
d. Texts - CORRECT ANSWER c. Vendor Address
What are the required assignment of organizational data for a Purchase Order (Header or Item)(Required Y/N).
a. Company Code - H or I Req. Y or N
b. Purchasing Organization - H or I Req. Y or N
c. Purchasing Group - H or I Req. Y or N
d. Plant - H or I Req. Y or N
e. Storage Location - H or I Req. Y or N - CORRECT ANSWER a. Company Code - Header Req. Yes
b. Purchasing Organization - Header Req. Yes
c. Purchasing Group - Header Req. Yes
d. Plant - Item Req. Yes
e. Storage Location - Item Req. No
Which of the following Organizational Units are used in purchasing?
a. Purchasing Group
b. Plant
c. Business Area
d. Cost Center
e. Purchasing Organization - CORRECT ANSWER a. Purchasing Group
b. Plant
e. Purchasing Organization
A Purchase Requisition can't be created by the following:
a. Automatically via MRP
b. Automatically via Goods Verification
c. Automatically via other internal logistics orders
d. Manually - CORRECT ANSWER b. Automatically via Goods Verification
For which of the following scenarios can you have a cross-plant purchasing organization buy materials?
a. All plants in 1 company code
b. Only 1 plant
c. All plants in all company codes - CORRECT ANSWER a. All plants in 1 company code
What field facilitates the integration of the Vendor Master record to Financial Accounting? - CORRECT ANSWER Reconciliation Account
The key elements of SAP List Viewer and ALV Grid Control can be summarized as follows: 3 are correct
a. Uniform design of all lists and tables
b. Cross-application, standardized function with uniform icons
c. Simple creation and changing of layouts
d. Uses the Information Structures of Characteristic, Time Unit, and Key Figures
e. Used in both Standard and Flexible Analyses - CORRECT ANSWER a. Uniform design of all lists and tables
b. Cross-application, standardized function with uniform icons
c. Simple creation and changing of layouts
What general ledger accounts are impacted in FI as the result of a GR?
a. Account Payable Reconciliation
b. Inventory account
c. Goods Receipt/Invoice Receipt Account
d. Vendor Account - CORRECT ANSWER b. Inventory account
c. Goods Receipt/Invoice Receipt Account
How would you describe the integration of the Vendor Master? 2 are correct
a. Be directly used in production
b. Groups of views in SD
c. Groups of views for FI
d. Be used to post directly in supplier or vendor accounting - CORRECT ANSWER c. Groups of views for FI
d. Be used to post directly in supplier or vendor accounting
Which of the following determines the views available when creating a material master?
a. Info Type
b. Item Category
c. Material Type
d. Movement Type - CORRECT ANSWER c. Material Type
Which of these statements is true regarding company codes?
a. A company code uniquely identifies a business area.
b. A client can only have 1 company code
c. The general ledger is managed at the company code level.
d. The company code can be assigned to multiple controlling areas. - CORRECT ANSWER c. The general ledger is managed at the company code level.
Which attributes are present in the FI document items? Select 2
a. Amount
b. Document Type
c. Posting Date
d. Currency
e. Posting key - CORRECT ANSWER a. Amount
e. Posting key
Document Type and Posting Date can be found in the header
From which of the following can financial statements be generated? Select 2
a. Operative Chart of Accounts
b. Country specific Chart of Accounts
c. Revenue accounts
d. Assets
e. Liability accounts - CORRECT ANSWER a. Operative Chart of Accounts
b. Country specific Chart of Accounts
Which component of NetWeaver makes disparate application and systems work together consistently to perform business processes?
a. Portal Infrastructure
b. Collaboration
c. Business Event Management
d. End-to-End Process Integration - CORRECT ANSWER d. End-to-End Process Integration
Which of the following simplifies the upgrade process and includes new innovations and functionality?
a. Enhancement packages
b. Support packages
c. Extension packages
d. Service packages - CORRECT ANSWER a. Enhancement packages
What general ledger accounts are impacted in FI as a result of a GR for consumption by a cost center? 2 are correct
a. Account Payable Reconciliation
b. Expense Account
c. Goods Receipt/Invoice Receipt Account
d. Vendor Account - CORRECT ANSWER b. Expense Account
c. Goods Receipt/Invoice Receipt Account
Which of these are possible effects of invoice Verification?
a. Goods Receipt is deleted
b. Moving Average Price is updated
c. Vendor Master is updated
d. Invoice document is in PO History - CORRECT ANSWER b. Moving Average Price is updated
d. Invoice document is in PO History
The movement type is a 3 digit key used to differentiate between goods movements in the system. The movement type has some important control functions which include: 3 are correct
a. Plays a central role in automatic account determination
b. Updates the vendor account for the invoice verification
c. Determines the structure of the screens
d. Updates the consumption values in the material master
e. Updating of the quantity fields - CORRECT ANSWER a. Plays a central role in automatic account determination
c. Determines the structure of the screens
e. Updating of the quantity fields
Which of the following statements about Bill of Materials are true? 2 are correct
a. BOMs are used for MRP, Production, and Procurement
b. The base quantity in the BOM header specifies the component quantities used to produce the finished good.
c. The Bill of Material may contain other Bills of Material
d. A BOM consists of a BOM Header, BOM Items, and Schedule Items - CORRECT ANSWER a. BOMs are used for MRP, Production, and Procurement
c. The Bill of Material may contain other Bills of Material
Which of the following types of conditions in purchasing can be used? 3 are correct
a. Contract
b. Quotation
c. Purchase Requisition
d. Purchasing Info Record
e. Payment Transation - CORRECT ANSWER a. Contract
b. Quotation
d. Purchasing Info Record
What are the stock types you can use to post a Goods Receipt of material into a warehouse? 3 are correct
a. Restricted-Use
b. Blocked
c. Unrestricted-Use
d. Quarantined
e. Quality Inspection
f. Validated - CORRECT ANSWER b. Blocked
c. Unrestricted-Use
e. Quality Inspection
If the GR is valuated, the system generates only an accounting document. T/F - CORRECT ANSWER False, also creates a Material Document and sometimes a Controlling Document
Which one of the statements below is not one of the effects of posting an invoice?
a. Accounting document is created
b. Material document is updated
c. Individual items post to their accounts
d. Reverses the provisions in the GR/IR clearing account
e. Invoice document entered in the PO history
f. MAP and Stock value udpated - CORRECT ANSWER b. Material document is updated
The Logistics Execution (LE) links procurement and distribution regardless of whether they use internal processes or third parties (Vendors, customers, or service providers). T/F - CORRECT ANSWER True
Invoice verification with reference to PO uses PO number, delivery note number, and Bill of lading number - CORRECT ANSWER False, it will use any one of them, but not all of them.
What integration role do account assignment objects play when used in a purchase order?
a. The objects determine if the material will be ordered or not
b. The objects help determine which accounts will be debited when the goods are received
c. They must be used whenever consumable materials are ordered
d. They determine how data flows from purchase requisition to purchase order - CORRECT ANSWER b. The objects help determine which accounts will be debited when the goods are received
c. They must be used whenever consumable materials are ordered
What are conditions in a purchase order used to determine?
a. Price
b. Contract information
c. Delivery data
d. Payment terms - CORRECT ANSWER a. Price
Which of the following represent different MRP Types? 2 are correct
a. Re-Order Point Planning (RPP)
b. Production Planning (PP)
c. Material Requirements Planning (MRP)
d. Sales and Operations Planning (SOP) - CORRECT ANSWER a. Re-Order Point Planning (RPP)
c. Material Requirements Planning (MRP)
What kind of master data records are used in Material Planning? 3 are correct
a. Material Master
b. PRT
c. Routing
d. Bill of Materials
e. Work Center - CORRECT ANSWER a. Material Master
c. Routing
d. Bill of Materials
Sometimes the Work Center is used as well.
The __________ is the G/L clearing account for Purchasing. - CORRECT ANSWER GR/IR
In the purchasing process an FI document committing funds is created upon the creation of the purchase order. T/F - CORRECT ANSWER False, it creates a controlling document
In the procurement cycle, what general ledger account ensures that goods are received for each invoice and vice versa?
a. Goods Receipt/ Invoice Receipt Account
b. Reconciliation Account
c. Material Stock Account
d. Consumption Expense Account - CORRECT ANSWER a. Goods Receipt/ Invoice Receipt Account
When will postings made in Financial Accounting update Management Accounting (CO)? 2 are correct
a. The statistical controlling object is entered on the FI posting
b. A business area is entered on the FI posting
c. A functional area is entered on teh FI posting
d. A real controlling object is entered on the FI posting
e. If FI account number has a corresponding secondary cost element. - CORRECT ANSWER a. The statistical controlling object is entered on the FI posting
d. A real controlling object is entered on the FI posting
During an automatic payment run in Financial Accounting, which of the following does not occur?
a. It posts payment documents
b. Clears open items
c. Prints the payment media - CORRECT ANSWER c. Prints the payment media
Which Controlling Component is tasked with assimilating costs that cannot be directly assigned to the goods and services of a company?
a. Overhead Costs Controlling
b. Profit Center Accounting
c. Cost Element Accounting
d. Product Cost Controlling - CORRECT ANSWER a. Overhead Costs Controlling
Which Organizational Structure is required if you want to use Profitability Analysis?
a. Business Area
b. Company Code
c. Controlling Area
d. Operating Concern - CORRECT ANSWER d. Operating Concern
Which of the following describe data and transactions in the SAP system? 2 are correct
a. Document is created for every transaction in the system
b. Documents are created using master data and organizational elements
c. Master data can be deleted at any time
d. Master data entered at the client level can only be used by 1 company code - CORRECT ANSWER a. Document is created for every transaction in the system
b. Documents are created using master data and organizational elements
Improve user productivity through enhanced collaboration, optimized knowledge management, and personalized access to critical applications and data describes which IT Practice?
a. End-to-End Process Integration
b. Unified Life-Cycle Management
c. User Productivity Enablement
d. Consolidation - CORRECT ANSWER c. User Productivity Enablement
IT scenarios enable the implementation of a defined IT concept, such as evolving a company's system landscape into a services-based architecture. T/F - CORRECT ANSWER True
Which of the following is not a component of NetWeaver?
a. SAP NetWeaver Portal
b. SAP NetWeaver CRM
c. SAP NetWeaver Mobile
d. SAP Auto-ID Infrastructure - CORRECT ANSWER b. SAP NetWeaver CRM
Information contained in an information structure includes: 2 are correct
a. Key Figures
b. Dimension Tables
c. Periodicity
d. Fact Tables - CORRECT ANSWER a. Key Figures
c. Periodicity
Dimension Tables and Fact Tables are part of an InfoCube
Which of the following statements about Work Centers are correct? 3 are correct
a. A cost center can be assigned to a work center
b. People, Positions, and Qualification can be assigned to a work center on the Scheduling tab.
c. Formula keys are used to calculate cost, calculate execution time and calculate capacity requirements
d. Work Centers are used to maintain resource related data - CORRECT ANSWER a. A cost center can be assigned to a work center
c. Formula keys are used to calculate cost, calculate execution time and calculate capacity requirements
d. Work Centers are used to maintain resource related data
Which of the following are elements of Production Order? 3 are correct
a. A production order must have at least 2 operations
b. Material components, PRTs and trigger points can be assigned to a Production Order
c. Documents from the Document Management System can be linked to Production Orders
d. Only Actual costs can be tracked on a Production Order
e. The Production Order status controls the allowed activities - CORRECT ANSWER b. Material components, PRTs and trigger points can be assigned to a Production Order
c. Documents from the Document Management System can be linked to Production Orders
e. The Production Order status controls the allowed activities
Which functions of a production order can be automated? 3 are correct
a. Order Release
b. Material Staging
c. Material Withdrawal Posting
d. Goods Receipt
e. Order Settlement - CORRECT ANSWER a. Order Release
c. Material Withdrawal Posting
d. Goods Receipt
What status must a Production Order be at in order to complete Material Withdrawals?
a. Created
b. Material Availability Check
c. Settlement Rule Created
d. Released
e. Printed - CORRECT ANSWER d. Released
A plant is a: 3 are correct
a. Manufacturing facility
b. Distribution Center
c. Plant Maintenance Plant
d. Inventory - CORRECT ANSWER a. Manufacturing facility
b. Distribution Center
c. Plant Maintenance Plant
What documents are created during goods issue for a production order? 3 are correct
a. Material Document
b. Purchase Requisition
c. Material Reservation
d. Controlling Document
e. Financial Accounting Document - CORRECT ANSWER a. Material Document
d. Controlling Document
e. Financial Accounting Document
How would you describe the integration of the Vendor Master? 2 are correct
a. Be directly used in Production
b. Groups of views for SD
c. Groups of views for FI
d. Be used to post directly in supplier or vendor accounting - CORRECT ANSWER c. Groups of views for FI
d. Be used to post directly in supplier or vendor accounting
Name the material master view that is responsible or relevant for integration with production?
a. Cost Planning
b. Work Scheduling
c. Sales and Distribution
d. MRP - CORRECT ANSWER b. Work Scheduling
Which of the following items result in a debit to a Production Order? 2 are correct
a. Material Withdrawal
b. Goods Receipt
c. Confirmation
d. Variance Posting - CORRECT ANSWER a. Material Withdrawal
c. Confirmation
What is the result of confirming a production order? 2 are correct
a. Credit management will check the material availability
b. Planned independent requirements are consumed
c. Activities, such as labor, are posted to the production order
d. Newly manufactured product can be received into Inventory - CORRECT ANSWER c. Activities, such as labor, are posted to the production order
d. Newly manufactured product can be received into Inventory
What is the purpose of routings in Manufacturing Execution?
a. Details for planning your labor
b. List of the components used in the manufacturing process
c. Activities required and the sequence of steps to be performed
d. Operations or activity carried out within a plant - CORRECT ANSWER c. Activities required and the sequence of steps to be performed
A production order in SAP ERP has a mapped order structure. Which of the following is not a part of that structure?
a. Order Header
b. Operation Sequences
c. Operations
d. Capacity Splits
e. Variance Calculation - CORRECT ANSWER e. Variance Calculation
Which of the following statements are true about a planned order? 3 are correct
a. Used to plan in-house production of material
b. Contain the basic dates within which production is to take place
c. There may be no accounting documents, one accounting document, or several accounting documents created
d. Update of costs for unplanned withdrawals
e. Include the basic requirements for the components for production in the form of dependent requirements - CORRECT ANSWER a. Used to plan in-house production of material
b. Contain the basic dates within which production is to take place
e. Include the basic requirements for the components for production in the form of dependent requirements
In releasing a production order it is possible to release single operations, entire orders, and multiple orders simultaneously. T/F - CORRECT ANSWER True
What a production order is released, manufacturing can begin and so the components cab be staged. To do so a goods issue against the production order needs to happen. Which of the steps below are part of what a goods issue performs? 4 are correct
a. Production Resource/Tools (PRTs) are scheduled
b. A settlement rule is created for the order
c. Storage-location specific update of the stock and consumption fields
d. Creation of material document and accounting (FI) document
e. Creation of controlling document
f. Reduction of the reservation (for planned withdrawal) - CORRECT ANSWER c. Storage-location specific update of the stock and consumption fields
d. Creation of material document and accounting (FI) document
e. Creation of controlling document
f. Reduction of the reservation (for planned withdrawal)
All of the following occur at production order confirmation except? 2 are correct
a. Cost estimation to produce order
b. Backflush of goods issue
c. Automatic goods receipt
d. HR data transfer
e. Generation of material and accounting documents - CORRECT ANSWER a. Cost estimation to produce order
e. Generation of material and accounting documents
Once production has been completed there is a goods receipt posting. Which of the following does not happen as a result?
a. System generates material documents, accounting documents, and controlling documents.
b. The system updates the delivered quantity in the order
c. The system updated the moving average price in the material master
d. The system credits the production order
e. The controlling document can be used for various cost analysis purposes. - CORRECT ANSWER c. The system updated the moving average price in the material master
A transfer posting always involve a physical goods movement. T/F - CORRECT ANSWER False
In a stock transfer there is always a physical movement of goods. T/F - CORRECT ANSWER True
Which of the following statements about Bill of Materials are true? 2 are correct
a. BOMs are used for MRP, Production, and Procurement
b. The base quantity in the BOM header specifies the component quantities used to produce the finished goods.
c. A Bill of Materials may contain other Bills of Material
d. A BOM consists of BOM Header, BOM Items and Schedule Items - CORRECT ANSWER a. BOMs are used for MRP, Production, and Procurement
c. A Bill of Materials may contain other Bills of Material
What can be used to create a Sales Operation Plan (SOP)? 3 are correct
a. Data transferred from SIS
b. Data transferred from CO/PA
c. Data entered manually
d. Data transferred from Purchasing - CORRECT ANSWER a. Data transferred from SIS
b. Data transferred from CO/PA
c. Data entered manually
Which of the following about Demand Planning are correct? 2 are correct
a. Planned Independent Requirements are created from Sales Orders
b. Customer Independent Requirements are created from Sales and Distributions
c. The Planning Strategy on the Material Master represents a procedure for planning a material
d. Planned Materials can only be produced In-House - CORRECT ANSWER b. Customer Independent Requirements are created from Sales and Distributions
c. The Planning Strategy on the Material Master represents a procedure for planning a material
Which is not a setp carried out during MRP run?
a. Check Demand - net requirements calculation
b. Checks Lot Size
c. Checks for Warehouse Management requirements
d. Scheduling (start date and finish date) - CORRECT ANSWER c. Checks for Warehouse Management requirements
Net requirements calculation uses data from which modules?
a. Human Resources
b. Warehouse Management
c. Quality Management
d. Material Management
e. Sales and Distribution - CORRECT ANSWER d. Material Management
e. Sales and Distribution
Which of the following represent different MRP Types? 2 are correct
a. Re-Order Point Planning (RPP)
b. Production Planning (PP)
c. Material Requirements Planning (MRP)
d. Sales and Operations Planning (SOP) - CORRECT ANSWER a. Re-Order Point Planning (RPP)
c. Material Requirements Planning (MRP)
What kind of master data records are used in Material Planning? 3 are correct
a. Material Master
b. PRT
c. Routing
d. Bill of Material
e. Work Center - CORRECT ANSWER a. Material Master
b. PRT
c. Routing
d. Bill of Material
What are the three processing keys for MRP? - CORRECT ANSWER 1. Net Change Planning (NETCH)
2. Net change Planning in the planning horizon (NETPL)
3. Online regenerative planning (NEUPL)
What is the outcome of MRP? - CORRECT ANSWER Planned Order
Activity types are the productive output of cost centers. Identify the true statements below. 3 are correct
a. Have to exist in the FI chart of accounts before you create them
b. Usually measured in a time or unit increment
c. Costs of these resources need to be allocated to the receivers of the activity
d. Classifies the activities performed within a company by one or several cost centers
e. Estimates the costs to produce goods or services. - CORRECT ANSWER b. Usually measured in a time or unit increment
c. Costs of these resources need to be allocated to the receivers of the activity
d. Classifies the activities performed within a company by one or several cost centers
In processing MRP, you can execute the planning run at the following levels: 2 are correct
a. Planning labor at a work center
b. Total planning for a plant
c. Activity planning
d. Planning for an individual material - CORRECT ANSWER b. Total planning for a plant
d. Planning for an individual material
You can execute planning in SOP (Sales & Operation Planning) for product groups and materials. For each product group, the system creates a customer master with material type PROD. T/F - CORRECT ANSWER False
For Material Planning, the MRP views and the Work Scheduling views must be created. T/F - CORRECT ANSWER False, Work Scheduling views may not be required.
Following which step in material planning do the Planned Independent Requirements appear in the stock requirements list?
a. Upon creation of a production plan in SOP
b. After running Material Requirements Planning
c. After running Master Production Scheduling
d. After transfer of planning data to demand management - CORRECT ANSWER d. After transfer of planning data to demand management
Which of the following is used to determine the quantity of a planned order during an MRP run?
a. Routing
b. Production version
c. Material Master
d. Bill of Materials - CORRECT ANSWER c. Material Master - Lot Size is specified here
Which controlling object collects costs for different decision making areas of responsibility?
a. Activity Type
b. Cost Center
c. Statistical Key Figure
d. Cost Element Group - CORRECT ANSWER b. Cost Center
What is the purpose of an activity type?
a. Provides a key by which costs can be divided between cost object
b. The basis for allocations using assessment
c. The productive output of a cost center
d. A tracing factor for external allocations. - CORRECT ANSWER c. The productive output of a cost center
Cost and revenue postings to Management Accounting can result in true (or real) and statistical postings. Which of the items below are considered true objects? 3 are correct
a. Cost Center
b. Profit Center
c. Project
d. Profitability Segment
e. Statistical Order - CORRECT ANSWER a. Cost Center
c. Project
d. Profitability Segment
What is the correct assignment for a company code?
a. A Company Code can have multiple leading ledgers
b. A Plant can be assigned to more than 1 Company Code
c. Business Areas are assigned to multiple Company Codes
d. A Company Code can carry out parallel accounting with different ledgers - CORRECT ANSWER d. A Company Code can carry out parallel accounting with different ledgers
How does the system ensure that the general ledger is reconciled with the accounts payable subsidiary ledger?
a. A Company Code can have only 1 account payable G/L account
b. The vendor accounts are listed in the general ledger account
c. The reconciliation account is entered in the vendor master record
d. The reconciliation account is entered in the general ledger account - CORRECT ANSWER c. The reconciliation account is entered in the vendor master record
Which of the following statements about Goods Management are correct? 2 are correct
a. A Goods Receipt decreases the warehouse stock
b. Movement of Inventory between plants is completed with a stock transfer
c. Transfer postings result in a physical movement of inventory
d. A Goods Issue decreases the warehouse stock - CORRECT ANSWER b. Movement of Inventory between plants is completed with a stock transfer
d. A Goods Issue decreases the warehouse stock
Which statements about Goods Receipt are correct? 2 are correct
a. A goods receipt uses a transfer posting to put the goods into blocked stock
b. The value of the stock is updated
c. PO history is not updated
d. Blocked stock is visible on the Stock Overview transaction - CORRECT ANSWER b. The value of the stock is updated
d. Blocked stock is visible on the Stock Overview transaction
Which of the following are examples of Stock Transfers? 2 are correct
a. Quality Inspection to Unrestricted Use movement
b. Storage location to storage location movement
c. Material to Material Movement (change the material number)
d. Plant to Plant movement - CORRECT ANSWER b. Storage location to storage location movement
d. Plant to Plant movement
Examples of Transfer Postings? 2 are correct
a. Stock - to - Stock
b. Plant - to Plant
c. Consignment - to - Warehouse
d. Storage Location - to Storage Location - CORRECT ANSWER a. Stock - to - Stock
c. Consignment - to - Warehouse
Which of the following statements are true regarding stock transfers? 2 are correct
a. A 2 step transfer, from plant to plant will result in the creation of only 1 material document
b. A stock transport order can be used to complete a stock transfer
c. After posting a 1 step stock transfer, the stock is shown as stock in transfer at the receiving location
d. A cross plant stock transfer can create a Financial Accounting document - CORRECT ANSWER b. A stock transport order can be used to complete a stock transfer
d. A cross plant stock transfer can create a Financial Accounting document
Which of the organizational levels, listed below link warehouse management and inventory management? 3 are correct
a. Storage Type
b. Warehouse
c. Plant
d. Storage Location
e. Storage Area - CORRECT ANSWER b. Warehouse
c. Plant
d. Storage Location
Stock Transfers always involve the physical movement of goods? T/F - CORRECT ANSWER True
Which of the following organization units are used to create the Sales Area? 3 are correct
a. Sales Group
b. Company Code
c. Division
d. Sales Organization
e. Distribution Channel - CORRECT ANSWER c. Division
d. Sales Organization
e. Distribution Channel
Which organization unit is used to represent how you distribute goods to the customer?
a. Sales Organization
b. Plant
c. Distribution Channel
d. Sales Group - CORRECT ANSWER c. Distribution Channel
Customer Master Data is grouped into categories. What are the categories?
a. Company Code Data
b. Plant Data
c. General Data
d. Basic Data
e. Sales Area Data - CORRECT ANSWER a. Company Code Data
c. General Data
e. Sales Area Data
Which of the following statements about Sales Order Management are true? 3 are correct
a. The sales document structure is grouped by Header and Lines only
b. One delivery document can be created from multiple sales documents
c. An accounting document when you post goods issue
d. A Sales Order document must reference a quotation
e. Sales Document Flow can be displayed for the header or line level - CORRECT ANSWER b. One delivery document can be created from multiple sales documents
c. An accounting document when you post goods issue
e. Sales Document Flow can be displayed for the header or line level
Which of the following defines customer master data? 3 are correct
a. Comes from FI an MM
b. Contains information necessary to post in FI
c. Is valid for a given Sales Area
d. Has data stored at the client level - CORRECT ANSWER b. Contains information necessary to post in FI
c. Is valid for a given Sales Area
d. Has data stored at the client level
Master Data that is relevant to SD includes? 3 are correct
a. Customer
b. Vendor
c. Customer/Material Info Record
D. Conditions
e. Purchasing Info Record - CORRECT ANSWER a. Customer
c. Customer/Material Info Record
D. Conditions
Which of the following are integrated with SD Goods Issue process? 2 are correct
a. Warehouse Management
b. Project Systems
c. Material Management
d. Human Resources
e. Material Planning - CORRECT ANSWER a. Warehouse Management
c. Material Management
What kind of Master Data is for a sales order? 2 are correct
a. Conditions
b. Asset Master
c. Customer Master
d. Vendor Master
e. Material Master - CORRECT ANSWER a. Conditions
c. Customer Master
e. Material Master
What documents are created at Invoice? - CORRECT ANSWER CO, FI, and SD
What is the highest Sales and Distribution unit?
a. Sales Area
b. Sales Organization
c. Distribution Channel
d. Division
e. Company Code - CORRECT ANSWER b. Sales Organization
How is Sales and Distribution integrated with Material Management and Material Planning? - CORRECT ANSWER Availability Check and Goods Issue
The material master is grouped into views. Which material master view, relevant for Sales and Distribution, is valid for delivering process?
a. Sales: Sales Org 2
b. Sales: Sales Org 1
c. Sales: General/Plant Data - CORRECT ANSWER b. Sales Organization
Organizational units represent the structure of an enterprise organization. Which of the following statements are true regarding SD org level?
a. More than 1 shipping point can be assigned to a plant
b. Assignment between sales organization/distribution channel and plants does not have to be unique
c. A division is a means through which a salable material or service reach the customer
d. A sales organization can belong to multiple company codes - CORRECT ANSWER a. More than 1 shipping point can be assigned to a plant
b. Assignment between sales organization/distribution channel and plants does not have to be unique
In shipping and transportation scheduling is used to confirm the delivery date for materials requested by a customer. The SAP system uses backward scheduling and the customer's requested delivery date to calculate which date?
a. Material availability date
b. Delivery confirmation date
c. Order date
d. Picking data - CORRECT ANSWER d. Picking data
The basis functions in SAP are provided by?
a. SAP XI
b. SAP EP
c. SAP Web AS
d. SAP BI - CORRECT ANSWER c. SAP Web AS
Which of the following are Account Assignment categories for consumable materials? 4 are correct
a. COGS
b. Cost Center
c. Project
d. Profit Center
e. Asset
f. Sales Order - CORRECT ANSWER b. Cost Center
c. Project
e. Asset
f. Sales Order
Which of the following are item categories for a BOM? 3 are correct
a. Stock Item
b. Class Item
c. Flexible Item
d. Variable-Size Item
e. Inventory Item
f. Third Party Item - CORRECT ANSWER a. Stock Item
b. Class Item
d. Variable-Size Item
In Cost Object Controlling (COC), Order Settlement does which of the following?
a. Credits the stock account
b. Debits the cost center
c. Credits the order
d. Debits the order - CORRECT ANSWER c. Credits the order
What does the posting key determine? 3 are correct
a. Account type to be posted
b. Whether the entry is a debit or credit
c. Which G/L account is being posted to
d. Which fields are required in the entry
e. The type of asset transaction is being posted - CORRECT ANSWER a. Account type to be posted
b. Whether the entry is a debit or credit
d. Which fields are required in the entry
Which of the following statements are correct? 2 are correct
a. More than 1 Chart of Accounts can be created for each client
b. The Chart of Accounts contains all the G/L accounts, vendor accounts, and customer accounts
c. More than 1 Company Code can be allocated to the same Chart of Accounts
d. The Chart of Accounts controls all the customizing settings in the R/3 system
e. All accounts within a Chart of Accounts must have the same tax code - CORRECT ANSWER a. More than 1 Chart of Accounts can be created for each client
c. More than 1 Company Code can be allocated to the same Chart of Accounts
What are the 3 phases of Product Cost Account? 3 are correct
a. Product Cost Planning
b. Cost Object Controlling
c. Cost Center Planning
d. Actual Costing/ Material Ledger
e. Activity Based Costing - CORRECT ANSWER a. Product Cost Planning
b. Cost Object Controlling
d. Actual Costing/ Material Ledger
Which of the following are true of the integration between FI and CO? 2 are correct
a. Postings to expense accounts result in a one-sided debit to a primary cost element
b. Postings to expense accounts result in a one-sided credit to a primary cost element
c. Postings to expense accounts require that a controlling object be provided
d. Postings to expense accounts result in a debit on the receiving controlling object and a credit to a primary cost element
e. Postings to expense accounts result in a one-sided debit to a secondary cost element - CORRECT ANSWER a. Postings to expense accounts result in a one-sided debit to a primary cost element
c. Postings to expense accounts require that a controlling object be provided
You're explaining the use of activity types to your boss. Which of the following are true of activity types? 2 are correct
a. You can restrict the use of activity types to certain types of cost centers
b. Activity types are allocated on primary cost elements with a credit to the sender and a debit to the receiver
c. Activity types can be defined for any type of controlling object
d. Activity types can only have 1 price for all the cost centers that use the activity type
e. Activity type prices can be determined automatically through the planning process or entered manually - CORRECT ANSWER a. You can restrict the use of activity types to certain types of cost centers
e. Activity type prices can be determined automatically through the planning process or entered manually
Which of the following organizational elements are used by Enterprise Asset Management? 3 are correct
a. Plant
b. Maintenance Plant
c. Maintenance Planning Plant
d. Purchasing Organization
e. Production Plant - CORRECT ANSWER a. Plant
b. Maintenance Plant
c. Maintenance Planning Plant
A work center can represent which of the following? 2 are correct
a. Person
b. Vendor
c. Machine
d. Cost Center
e. G/L Account - CORRECT ANSWER a. Person
c. Machine
Which objects are technical objects? 3 are correct
a. Work Centers
b. Functional Location
c. Construction Type
d. Bill of Material
e. Equipment - CORRECT ANSWER b. Functional Location
d. Bill of Material
e. Equipment
Which of the statements about Functional Locations are correct? 2 are correct
a. Are not hierarchy structure to define technical system
b. More than 1 equipment can be assigned
c. Plant maintenance tasks can be performed with assignments to or for functional location
d. Are assigned serial numbers in order to keep history about the functional location - CORRECT ANSWER b. More than 1 equipment can be assigned
c. Plant maintenance tasks can be performed with assignments to or for functional location
When you assign a structure indicator (coding template and hierarchy level) to equipment it is automatically assigned to a functional location. T/F - CORRECT ANSWER False - A structure indicator is assigned to a functional location, not to equipment.
What are the phases in the corrective maintenance process? - CORRECT ANSWER Notification, Planning, Controlling, Executing, and Completion
In creating a fixed asset master record which of the statements below are correct? 4 are correct
a. An asset class is the main criterion for defining an asset
b. Each asset belongs to a company code and business area
c. The basic-data view displays data defined at the client level, and all other views are defined at plant level
d. Assets that do not appear in the same line item of the balance sheet (such as buildings and equipment) must be assigned to different asset classes.
e. You can assign the asset to various Controlling (CO) objects
f. Contains global data and location-specific data. Global data is valid across all locations. - CORRECT ANSWER a. An asset class is the main criterion for defining an asset
b. Each asset belongs to a company code and business area
d. Assets that do not appear in the same line item of the balance sheet (such as buildings and equipment) must be assigned to different asset classes.
e. You can assign the asset to various Controlling (CO) objects
Internal orders can be grouped into the following general categories. 4 are correct
a. Overhead orders
b. Investment orders
c. Equipment orders
d. Maintenance orders
e. Accrual orders
f. Orders with revenue - CORRECT ANSWER a. Overhead orders
b. Investment orders
e. Accrual orders
f. Orders with revenue
A commitment identifies costs that are incurred in the future for materials and services requested or ordered. The features of a commitment are as follows: 3 are correct
a. The costs of these resources need to be allocated to the receivers of the activity
b. The transaction type is an addition to the asset posting keys 70 (debit) and 75 (credit)
c. A commitment for future costs is created in the Purchasing function of the materials management (MM) component
d. A commitment can be reduced by posting a goods receipt against a purchase order
e. Commitment management needs to be activated in Management Accounting for each controlling area - CORRECT ANSWER c. A commitment for future costs is created in the Purchasing function of the materials management (MM) component
d. A commitment can be reduced by posting a goods receipt against a purchase order
e. Commitment management needs to be activated in Management Accounting for each controlling area
Costs have to be passed on to their final destination, such as cost center, fixed asset, and profitability segment. This process is called settlement. Identify the true statements below. 3 are correct
a. A settlement rule must be defined for each order
b. Must comply with true objects in CO
c. During a settlement, the actual costs incurred on an internal order are allocated to 1 or more receivers
d. The system automatically generates offsetting entries to credit the internal order
e. Asset balances and transactions often need to be valuated differently for various purposes - CORRECT ANSWER a. A settlement rule must be defined for each order
c. During a settlement, the actual costs incurred on an internal order are allocated to 1 or more receivers
d. The system automatically generates offsetting entries to credit the internal order
Which of the following statements about functional locations are correct? 3 are correct
a. Functional locations are hierarchically ordered structures that could represent a technical system or building
b. Maintenance tasks can be performed at a functional location
c. By assigning a structure indicator to a piece of equipment, it is automatically included in the existing structure
d. Only 1 piece of equipment can be assigned to the same functional location
e. Functional locations allow you to analyze the effects that usage conditions have on the likelihood of damage to the installed equipment - CORRECT ANSWER a. Functional locations are hierarchically ordered structures that could represent a technical system or building
b. Maintenance tasks can be performed at a functional location
e. Functional locations allow you to analyze the effects that usage conditions have on the likelihood of damage to the installed equipment
Internal orders provide capabilities for planning, monitoring, and allocating costs. T/F - CORRECT ANSWER True
A piece of equipment is an individual physical object that is maintained as an autonomous unit. Pieces of equipment usually represent single objects. Some examples of single objects are: 3 are correct
a. Means of transport
b. Test equipment
c. Consumable materials
d. Raw material inventory
e. Building or property - CORRECT ANSWER a. Means of transport
b. Test equipment
e. Building or property
Which of the following determines the views available when creating a material master?
a. Info Type
b. Item Category
c. Material Type
d. Movement Type - CORRECT ANSWER c. Material Type
A GR is used for goods received from which of the following scenarios? 2 are correct
a. External procurement from a vendor
b. Stock Transfers
c. Goods Withdrawal
d. Transfer Postings
e. From a production Order - CORRECT ANSWER a. External procurement from a vendor
e. From a production Order
What is a purpose of a work center? 2 are correct
a. Its capacity is consumed by a cost element
b. It is a basis for scheduling labor cost element
c. It is where an operation or activity is performed in a plant
d. It is where the quantity of an activity type is consumed by an operation - CORRECT ANSWER c. It is where an operation or activity is performed in a plant
d. It is where the quantity of an activity type is consumed by an operation
Result of converting a planned order to a production order
a. Overhead is applied to the production order
b. Capacities in the work centers are consumed
c. Planned independent requirements are consumed
d. Dependent requirements become order reservations - CORRECT ANSWER d. Dependent requirements become order reservations
In Logistics Execution, which of the following are true? 2 are correct
a. Warehouse numbers are assigned to only 1 plant
b. Shipping points can be assigned to more than 1 plant
c. Transportation planning points can be assigned to 1 or more plants
d. Transportation planning points are necessary for cost calculation - CORRECT ANSWER b. Shipping points can be assigned to more than 1 plant
d. Transportation planning points are necessary for cost calculation
Which of the following statements regarding a stock transfer is correct? A stock transfer consists of...?
a. a goods receipt from the issuing point and a goods receipt at the receiving point
b. a goods issue from the issuing point and a goods issue at the receiving point
c. a goods issue from the issuing point and a goods receipt at the receiving point
d. a goods issue from the issuing point and a goods issue at the receiving point - CORRECT ANSWER c. a goods issue from the issuing point and a goods receipt at the receiving point
What is the highest organizational element used for the shipping function of Sales and Distribution?
a. Shipping Point
b. Distribution Channel
c. Company Code
d. Sales Organization - CORRECT ANSWER a. Shipping Point
Posting of a goods issue for a sales order signals the end of the delivery process. What else does the posting of the goods issue signal? 2 are correct
a. An open item is created against the customer's account
b. A customer's invoice is created
c. A material document is created which decreases the inventory level
d. An accounting document is created which decreases inventory valuation - CORRECT ANSWER c. A material document is created which decreases the inventory level
d. An accounting document is created which decreases inventory valuation
Which of the following statements are correct for the Chart of Accounts? 3 are correct
a. Can be country specific
b. Contains definition of all G/L accounts
c. Contains information for account control and management
d. Is assigned to a company code
e. Is assigned to a Profit Center - CORRECT ANSWER a. Can be country specific
b. Contains definition of all G/L accounts
d. Is assigned to a company code
When will postings made in Financial Accounting update Management Accounting (CO)? 2 are correct
a. The statistical controlling object is entered on the FI posting
b. A business area is entered on the FI posting
c. A functional area is entered on the FI posting
d. A real controlling object is entered on the FI posting
e. If FI account has a corresponding secondary element - CORRECT ANSWER a. The statistical controlling object is entered on the FI posting
d. A real controlling object is entered on the FI posting
Which Organizational Structure is required if you want to use Profit Center Accounting?
a. Business Area
b. Company Code
c. Controlling Area
d. Operating Concern - CORRECT ANSWER c. Controlling Area
Which of the following can be a statistical object in controlling?
a. Business Area
b. Project
c. Production Order
d. Cost Center - CORRECT ANSWER b. Project
An object that is used to monitor costs incurred in the production of a fixed asset, such as building a storage facility describes a:
a. Accrual Order
b. Overhead Order
c. Investment Order
d. Asset Order - CORRECT ANSWER c. Investment Order
True objects in CO can act as a sending or receiving object during cost allocation. T/F - CORRECT ANSWER True
A Profit Center is: 2 are correct
a. An internal measurement of profitability
b. A statistical object
c. Measures profitability of the external segments of our enterprise
d. A delimited location where costs occur - CORRECT ANSWER a. An internal measurement of profitability
b. A statistical object
Which of the following statements about Work Breakdown Structures are correct? 2 are correct
a. WBS is a model of the project
b. Project Builder is the only tool available to define the WBS
c. WBS is used to plan only the costs associated with a project
d. WBS elements that you use to plan costs are identified as planning elements - CORRECT ANSWER a. WBS is a model of the project
d. WBS elements that you use to plan costs are identified as planning elements
Which of the following are Activity Categories?
a. Internal Processing
b. External Processing
c. Resources
d. Services
e. Cost Center Processing - CORRECT ANSWER a. Internal Processing
b. External Processing
d. Services
Which component of SAP ERP cannot post actual data to a project?
a. Inventory Management
b. Plant Maintenance
c. Manufacturing Execution
d. Business Warehouse
e. Controlling - CORRECT ANSWER d. Business Warehouse
Which are typical functions inside project systems? 4 are correct
a. Dates
b. Responsibility
c. Costs/Revenues
d. Budget
e. System Status
f. Payments - CORRECT ANSWER a. Dates
c. Costs/Revenues
d. Budget
f. Payments
Name the Operative Indicators for WBS Elements: - CORRECT ANSWER Planning Element
Account Assignment Element
Billing
What is the organizational unit that is unique for the entire project?
a. Business Area
b. Controlling Area
c. Company Code
d. Enterprise - CORRECT ANSWER b. Controlling Area
Explain the difference between the WBS elements and Network Activities - CORRECT ANSWER
The project definition contains data that affects the entire project. T/F - CORRECT ANSWER True
Operative indicators determine whether planning, accounting, or billing will be performed for a WBS element. T/F - CORRECT ANSWER True
WBS Elements can be created within the Hierarchy graphic. T/F - CORRECT ANSWER True
You can re-arrange the WBS element hierarchy in the Hierarchy graphic. T/F - CORRECT ANSWER True
A network contains activities, which describe the sequence of work and flow of a project. T/F - CORRECT ANSWER True
Activities are assigned to the WBS elements and the planned and actual data for the activities can be aggregated at the WBS element level. T/F - CORRECT ANSWER True
Projects are tasks that have which of the following characteristics? 4 are correct
a. Projects are usually complex and unique and involve a high degree of risk
b. Projects are subject to specific quality requirements
c. Projects involve 1 department
d. Projects are limited in duration and are cost and capacity intensive
e. Projects have high level targets that are agreed on between the project manager and the stake holders
f. Projects are of strategic significance for the business carrying them out - CORRECT ANSWER a. Projects are usually complex and unique and involve a high degree of risk
b. Projects are subject to specific quality requirements
d. Projects are limited in duration and are cost and capacity intensive
f. Projects are of strategic significance for the business carrying them out
What are some of the types of cost planning in the work breakdown structure (WBS) elements? 3 are correct
a. Statistical Object Planning
b. Unit Costing
c. Detailed Planning
d. Easy Cost Planning
e. Budget Planning - CORRECT ANSWER b. Unit Costing
c. Detailed Planning
d. Easy Cost Planning
A Maintenance Notification can be created for which of the following? 3 are correct
a. Functional Location
b. Equipment
c. Work Center
d. No Object
e. Plant - CORRECT ANSWER a. Functional Location
b. Equipment
d. No Object
What are the elements of a notification? 2 are correct
a. Tasks
b. Settlement Rule
c. Maintenance Costs
d. Items - CORRECT ANSWER a. Tasks
d. Items
Which of the following statements are correct regarding how a Plant Maintenance order is created? 2 are correct
a. Generated automatically from WBS element
b. Scheduled Maintenance
c. Direct Entry
d. Via a Purchase Requisition - CORRECT ANSWER b. Scheduled Maintenance
c. Direct Entry
Which of the following statements are correct regarding Plant Maintenance orders? 2 are correct
a. By use of object list, you can maintain or repair more than 1 piece of equipment
b. PM work order offers planned costs and actual costs
c. Shows activities and tasks
d. Only created with reference to a notification - CORRECT ANSWER a. By use of object list, you can maintain or repair more than 1 piece of equipment
b. PM work order offers planned costs and actual costs
What are the phases in the corrective maintenance process? - CORRECT ANSWER Notification, Planning, Controlling, Execution, and Completion
Which of the following statements are correct when you set a PM work order to TECO? 3 are correct
a. TECO can be set separately for order notification
b. You can change order data
c. When your notification and order are closed together - tasks need to be closed
d. Open reservations and purchase requisitions are left open until final settlement
e. Settlement rule can be created automatically - CORRECT ANSWER a. TECO can be set separately for order notification
c. When your notification and order are closed together - tasks need to be closed
e. Settlement rule can be created automatically
What is a purpose of a work center? 2 are correct
a. Its capacity is consumed by WBS element
b. It is a basis for scheduling WBS element
c. It is where an operation or activity is performed in a plant
d. It is where the quantity of an activity type is consumed by an operation - CORRECT ANSWER c. It is where an operation or activity is performed in a plant
d. It is where the quantity of an activity type is consumed by an operation
In Logistics Execution, which of the following are true? 2 are correct
a. Warehouse numbers are assigned to only 1 plant
b. Shipping points can be assigned to more than 1 plant
c. Transportation planning points can be assigned to 1 or more plants
d. Transportation planning points are necessary for cost calculation - CORRECT ANSWER b. Shipping points can be assigned to more than 1 plant
d. Transportation planning points are necessary for cost calculation
What is the highest organizational element used for the shipping function of Sales and Distribution?
a. Shipping Point
b. Distribution Channel
c. Company Code
d. Sales Organization - CORRECT ANSWER a. Shipping Point
Which of the following statements are correct with regard to the Customer Master records? 2 are correct
a. Contain reconciliation account information
b. Are created using an account group
c. Have General, Company Code, and Purchasing Organization segments
d. Have General, Company Code, and Sales Organization segments - CORRECT ANSWER a. Contain reconciliation account information
b. Are created using an account group
Which of the following statements are true regarding Operation Concern? An Operation Concern...
a. Represents the structure of external market segments used for multi-dimensional reporting in Financial Account
b. Is a Management Accounting organizational structure that supports Profit Center Accounts
c. Is Management Accounting organizational structure that supports Product Cost Planning
d. Can have multiple controlling areas assigned to it - CORRECT ANSWER d. Can have multiple controlling areas assigned to it
The movement type is a 3 digit key used to differentiate between goods movements in the system. The movement type has some important control functions which include: 3 are correct
a. Plays a central role in automatic account determination
b. Updates the vendor account for the invoice verification
c. Determines the structure of the screens
d. Updates the consumption values in the material master
e. Updating of the quantity fields - CORRECT ANSWER a. Plays a central role in automatic account determination
c. Determines the structure of the screens
e. Updating of the quantity fields
Increase the visibility, reach and usefulness of structured and unstructured enterprise data describes?
a. Use Productivity Enablement
b. Data Unification
c. Business Information Management
d. Business Event Management - CORRECT ANSWER c. Business Information Management
Which of the following is a layer in the SAP NetWeaver BW Architecture? 2 are correct
a. Extraction
b. Information Structure
c. Data Analysis and Planning
d. Characteristics
e. Key Figures - CORRECT ANSWER a. Extraction
c. Data Analysis and Planning
Which of the following statements about InfoCubes are correct? 2 are correct
a. An InfoCube consists of a single database
b. An InfoCube has 16 fact tables and 1 dimension table
c. An InfoCube is a central data container used for reports and analysis
d. A fact table can contain 233 key figures - CORRECT ANSWER c. An InfoCube is a central data container used for reports and analysis
d. A fact table can contain 233 key figures