RIICWD507D Prepare detailed geotechnical design Assessment Task 1 This unit describes a participant’s skills and knowledge required to prepare detailed geotechnical designs in Civil construction. This unit is appropria
...
RIICWD507D Prepare detailed geotechnical design Assessment Task 1 This unit describes a participant’s skills and knowledge required to prepare detailed geotechnical designs in Civil construction. This unit is appropriate for those working in management roles. No licensing, legislation or certification requirements apply to this unit at the time of publication. The Elements and Performance Criteria of this unit are outlined below. Elements describe the essential outcomes. Performance criteria describe the performance needed to demonstrate achievement of the element.
1. Plan for the detailed design of geotechnical works 1.1 Access, interpret and apply geotechnical works design documentation and ensure the work activity is compliant 1.2 Obtain, read, interpret, clarify and confirm work requirements 1.3 Identify and confirm the geotechnical works project requirements and information 1.4 Prepare a design plan which makes best use of the available resources
2. Undertake the detailed design of geotechnical works 2.1 Interpret and analyse data and identify viable options 2.2 Interpret and analyse data and make a recommendation for the preferred option 2.3 Complete the detailed design of the geotechnical works 2.4 Prepare a cost estimate for executing the designed geotechnical works 2.5 Participate in the review of the geotechnical works design with peers and stakeholders 2.6 Complete the documentation for the geotechnical works design 2.7 Monitor and coordinate the progress of other team members involved in the design process 2.8 Gain design approval
3. Finalize design processes of geotechnical works 3.1 Ensure filing of design records is completed 3.2 Complete and submit design cost and other reporting 3.3 Participate in performance review of the design process 3.4 Seek client feedback and contribute to the verification of the design 3.5 Close out all systems
4. Support and review the application of the design of geotechnical works 4.1 Provide clarification and advice to those applying the design 4.2 Review the application of the design and recommend changes for continuous improvement 4.3 Contribute to the validation of the design