LORA Correct Answer: Level of Repair Analysis: LORA will ensure that
operational readiness is achieved throughout a system's life cycle in an optimal,
least cost fashion. Starting the LORA process early in a system
...
LORA Correct Answer: Level of Repair Analysis: LORA will ensure that
operational readiness is achieved throughout a system's life cycle in an optimal,
least cost fashion. Starting the LORA process early in a system's development, and
continuous evaluation throughout its life cycle, can ensure LORA influences the
systems design and the maintenance planning by producing an effective support
solution.
LORA considers: Correct Answer: Cost, performance, schedule, and
supportability to aid in finalizing an effective and supportable design solution.
FTA Correct Answer: Fault Tree Analysis: Involves using deductive logic to
determine the possible causes of a defined undesired operational result. It is a top-
down failure analysis of a system that analyzes a series of lower-level events.
RCM Correct Answer: Reliability Centered Maintenance (RCM): consists of a
systematic approach of analyzing system/equipment reliability and system safety
data to determine the feasibility and desirability of preventive maintenance
activities, to highlight maintenance problem areas for design review consideration,
and to establish the most effective preventative maintenance program for a
system/equipment.
Level of repair Analysis (LORA) Correct Answer: The objectives of performing a
LORA is to ensure that operational readiness is achieved throughout a system's life
cycle in an optimal, least cost fashion. Starting the LORA process early in a
system's development, and continuous evaluation throughout its life cycle, can
ensure a LORA influences the systems design and the maintenance planning by
producing an effective support solution.
MTA Correct Answer: Maintenance Task Analysis (MTA): The identification of
the steps, spares and materials, tools, support equipment, personnel skill levels as
well as any facility issues that must be considered for a given repair task. Also
include in the MTA are elapsed times required for the performance of each task.
The Four Prime factors that govern system acquisition programs are: Correct
Answer: Cost, schedule, performance, and supportability.