Education > QUESTIONS & ANSWERS > SaFe Agile Advanced Scrum Master Exam Questions and Answers Already Passed (All)

SaFe Agile Advanced Scrum Master Exam Questions and Answers Already Passed

Document Content and Description Below

SaFe Agile Advanced Scrum Master Exam Questions and Answers Already Passed What is one characteristic of an effective Agile Team? To provide steady, high quality, incremental value How does a Scrum Ma... ster lead a team's efforts in relentless improvement? By facilitating the Iteration Retrospective How does the Scrum Master help teams address the challenges of modern Enterprises? By actively addressing impediments Why are SAFe Scrum Masters challenged differently in an Enterprise? The team is affected by teams and stakeholders beyond their control Which SAFe configuration requires having a Vision? All SAFe configurations Which SAFe organizational construct allows businesses to build large and complex systems which require hundreds of people in a Lean-Agile manner? Solution Train Who is responsible for assisting to establish Continuous Integration in SAFe? The System Team SAFe Scrum Masters interact with which level(s) of Framework? All Levels One of the Scrum Master's main responsibilities is to communicate with management and outside stakeholders to help the team in what way? Protect them from uncontrolled addition of work What provides objective evidence that the system is iterating? System Demo In complex systems development, what do local integration points ensure? That each Capability of the system is meeting its responsibilities in contributing to the overall Solution Intent Which statement is true about the phase-gate Milestone model? It does not mitigate risk as intended How can learning Milestones be used? To test the concept of a new Feature or Capability What are two reasons why too much work in process (WIP) is a problem? (Choose two.) It hides bottlenecks in the workflow;It shows that the overall system is inefficient; What is the connection between feedback and optimum batch size? Lack of feedback contributes to higher holding cost What is the value of periodic resynchronization? It limits variance to a single time interval How should decentralized decision-making be used with respect to system design? When Agile Teams are empowered, self-organized, and the design is allowed to emerge During Iteration planning, the Product Owner (PO) introduces a new Story to the team. They cannot come to a consensus on the size of the new Story and ask the PO for more details. No; the team left the Story in the Team Backlog for further refinement with the PO A team's Product Owner (PO) takes an unexpected leave of absence for the last week of the Iteration. Three of the team's Stories have been completed and are waiting to be accepted. Work with the Release Train Engineer to find a solution What is a recommended Story-splitting technique for Agile Teams? Implement the 'happy path' first and the rest of the scenarios afterwards During Iteration Review, the team decides to carry forward three Stories to the next Iteration. This is the second time during this PI that some of the team's Stories are carried over. What are two actions the Scrum Master should take? (Choose two.) Discuss the issue at the Iteration Retrospective;Perform the 5 Whys to find the root cause of the delays; What are three Iteration Retrospective anti-patterns? (Choose three.) When the team's people manager comes in to observe;When only some of the team attends;When the Scrum Master decides what the retrospective topic(s) will be and directs the team on specific improvement items to work on; What anti-pattern can emerge during the scrum of scrums? Scrum Masters report on the teams' task status each day What is the SAFe recommended duration of a PI? 8 - 12 weeks What are two key areas a team should be organized around? (Choose two.) Enablers;Features; What are two Release Train Engineer responsibilities? (Choose two.) Drive relentless improvement through Inspect and Adapt;Facilitate PI Planning readiness and the event itself; What are the responsibilities of a SAFe Scrum Master on an ART that go beyond basic team facilitation? (Choose three.) Facilitate preparation for the System Demo;Facilitate team preparation for PI Planning;Participate in the scrum of scrums; When does the Inspect and Adapt event happen? At the end of each PI Achieving the goals of Release on Demand requires an understanding of how to decouple what? The release from deployment Who reviews the top Capabilities for the upcoming PI? Solution Management Which statement describes how Kanban teams handle capacity during PI Planning? They use throughput as an indication of their capacity How does work flow from one state to the next in a team K [Show More]

Last updated: 2 years ago

Preview 1 out of 7 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Reviews( 0 )

$8.50

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

76
0

Document information


Connected school, study & course


About the document


Uploaded On

Jan 21, 2023

Number of pages

7

Written in

Seller


seller-icon
brightstudy

Member since 2 years

1 Documents Sold

Additional information

This document has been written for:

Uploaded

Jan 21, 2023

Downloads

 0

Views

 76

Document Keyword Tags


$8.50
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·