*NURSING > STUDY GUIDE > NERC Transmission Practice Test, Exam Q&As, A+ Guide (All)

NERC Transmission Practice Test, Exam Q&As, A+ Guide

Document Content and Description Below

NERC Transmission Practice Test, Exam Q&As, A+ Guide-Station #1 is at 539KV and station #2 is at 534 KV. Which direction will the MVAR typically flow? A. From station #1 to station #2 B. From statio... n #2 to station #1 C. Downhill based on power angle D. Uphill based on power angle - A. From station #1 to station #2 Each transmission operator shall arrange for supply of _____ resources within its boundaries to protect the voltage levels under contingency conditions A. Transmission B. Generation C. Reactive D. Regulating - C. Reactive Relay schemes should be designed so that automatic re-closing during _____ conditions should be prevented A. System restoration B. TLR C. Out of step D. Thunderstorm - C. Out of step You received indication that all of the CBs on a bus have opened and locked out, which of the following relays would you have expected to operate? A. 59G B. 87B C. 87T D. 21-1 - B. 87B High speed relays, high-speed circuit breakers, and ____ should be used where studies indicate the application will enhance stability margins A. Automatic voltage regulators B. Automatic re-closings C. Special protection schemes D. Under frequency relaying - B. Automatic re-closings Dynamic thermal ratings are ratings that limit transmission line loading A. With a conservative mindset B. With current temperature and wind speed C. Based on current transaction schedules D. Based on projected transaction schedules - B. With current temperature and wind speed In order for each transmission operator to protect its system voltage levels under normal and contingency conditions, they must acquire which of the following? A. Sufficient reactive resources B. Dynamic reactive resources C. Sufficient generation supplies D. Sufficient transmission capacity - A. Sufficient reactive resources Which of the following would be a concern if you were operating on the system with an open ended transmission line? A. Ferranti-rise effect B. Transmission Loop flows C. Exceeding surge impedance loading D. Reactive depletion - A. Ferranti rise effect Which of the following devices would you use if you were calculating dynamic reactive reserve for your systems A. Shunt reactors B. Transformers C. Shunt capacitors D. Generators - D. Generators Which of the following is an advantage of coordinating planned transmission outages? A. Ensure system reliability B. Increasing transmission overloads C. Keeping information away from generators D. Not having to post on OASIS - A. Ensur [Show More]

Last updated: 5 months ago

Preview 1 out of 18 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Also available in bundle (1)

NERC BUNDLED EXAMS QUESTIONS WITH 100% CORRECT & VERIFIED ANSWERS, LATEST UPDATE (INCLUDING STUDY GUIDES)

NERC BUNDLED EXAMS QUESTIONS WITH 100% CORRECT & VERIFIED ANSWERS, LATEST UPDATE (INCLUDING STUDY GUIDES)

By PROF 2 years ago

$29.5

8  

Reviews( 0 )

$12.50

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

84
0

Document information


Connected school, study & course


About the document


Uploaded On

Feb 24, 2023

Number of pages

18

Written in

Seller


seller-icon
PROF

Member since 4 years

150 Documents Sold

Reviews Received
21
4
2
0
6
Additional information

This document has been written for:

Uploaded

Feb 24, 2023

Downloads

 0

Views

 84


$12.50
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·