1. Introduction
1.1 Project goals and objectives
The Getta Byte Software project is a mission that is formed with the main goal in mind of
replacing the current manual billing system with an online software-based sy
...
1. Introduction
1.1 Project goals and objectives
The Getta Byte Software project is a mission that is formed with the main goal in mind of
replacing the current manual billing system with an online software-based system that will
enable accurate, easy and fast data entry system. It is worth noting that the existing system has
the capability of helping the company to carry out the duties in daily operations. This is quite
fine, but there are a few challenges that calls for an online system. The first concern is that the
existing system is manual and therefore, time consuming and very inaccurate. A lot of time is
needed in entering the information into the system and the end result is the inconsistency of the
information entered and therefore, putting the company at risk. The solution to this problem is to
come up with an automated system that shall be very fast and produce accurate data. The system
shall be base on online operation which will enhance an easy way of entering the data, conceive
a dynamic update towards the receivables. The system shall have a goal of saving up to 25 % of
the total labor per month since, human resources to operate the billing system shall be reduced.
The extra cost saved by the company shall be used elsewhere and hence, raising the total profits
made by the company each month. The project focuses towards working with a bunch of people
to spread risks in the company. These people shall include the CFO, CEO the billing department
and also customer care services. The success of the project shall be attributed to the fact that the
billing cycles are reduced to more than 30% each month.
As per the project schedule, it is expected that the first piloting shall be done by September
1
st. This shall imply that the development and testing of the software shall be done by 15th
August. This shall give an ample time to facilitate the first piloting study and see if the system is
working correctly and in accordance to the expectations and goals of the project. The final real
3
Getta Byte Software project
ease of the software shall be done by September 1st, this will be after having checked all parts
that are not in a good working condition and rectify them accordingly. The project is budgeted $
250, 000 for the entire work. Therefore, the work shall be scheduled accordingly and individual
tasks split to enable the project team to carry out all duties with little or no friction.
1.2 Management of the project
The project charter shall establish the requirements of the project and the basic needs of the
project. In addition, the person who shall be liable of carrying out the entire project is the project
manager. The project manager shall then appoint their team such as the human resource manager,
the software engineer, the project coordinator and other different people who shall carry out
duties assigned to them by the project manager. Each person shall be responsible in their area of
operation to make sure that there is smooth running of activities. The project manager role shall
be to oversee the entire process and therefore, providing all the resources, including the human
resource, material and cost that shall be used in the project. The project manager will also ensure
that communication is done and there is adequate control of all the resources provided.
1.3 Internal and external factors that may affect processes and p