Physics  >  EXAM  >  2F071 CDC URE Vol 1 (All)

2F071 CDC URE Vol 1

Document Content and Description Below

2F071 CDC URE Vol 1 (001) Who is responsible for developing an operating instruction (OI) to specify tool accountability procedures? a. Noncommissioned officer in charge (NCOIC) fuels distribution ... or operations superintendent. b. Vehicle fleet manager or vehicle maintenance superintendent. c. Fuels maintenance supervisor. d. Fuels management flight commander (FMFC). - ✔✔Vehicle fleet manager or vehicle maintenance superintendent. (002) The Vehicle Maintenance Flight Materiel Control section point of contact (POC) coordinates with applicable supervisors or their designees to update and perform inventories on composite tool kits (CTK) on all these occurrences except a. initial issue. b. quarterly. c. semi-annually. d. when responsible individual is transferred and a new one is assigned. - ✔✔quarterly. (002) Who ensures tools and precision measurement equipment assigned to composite tool kits (CTK) are scheduled for calibration and certification? a. Vehicle maintenance superintendent. b. Vehicle management flight materiel control section. c. Vehicle fleet manager. d. Technician assigned to CTK. - ✔✔Vehicle management flight materiel control section. (003) Type III, IV and V hydrant systems will be flushed at least a. monthly.b. quarterly. c. semiannually. d. annually. - ✔✔monthly. (003) When performing a hydrant flushing operation, ensure the loop is flushed a. with a minimum of twice the line volume. b. using a minimum of 2,000 gallons of product. c. until a sump sample is obtained. d. for at least 30 minutes. - ✔✔with a minimum of twice the line volume. (004) When obtaining quantity readings with the automated tank gauge (ATG) tank control unit, which key must you press first when switching between tanks? a. ESC. b. NEXT. c. TANK. d. ENTER. - ✔✔TANK. (004) Approximately how long will the nitrogen supply last when an automated tank gauging (ATG) tank control unit (TCU) displays an alarm indicating the supply has dropped below 200 pounds per square inch (psi)? a. One week. b. One month. c. Three months. d. Six months. - ✔✔One month. (005) When performing a periodic cryotainer inspection, which items listed in Technical Order (TO) 37C2-8-1-116WC-1 should you complete? a. All items. b. All items preceded by an asterisk (*).c. All items listed under the "Periodic Inspection" heading. d. All items followed by an ampersand (&). - ✔✔All items preceded by an asterisk (*). (006) What action, if any, should be taken if a commercial delivery operator does not provide a Department of Defense (DD) Form 250 with a liquid oxygen (LOX) shipment? a. No action is required. b. Contact Air Force Petroleum Agency (AFPA) for disposition instructions. c. Inform the fuels service center (FSC) and await further guidance. d. Notify the fuels management team (FMT) and obtain an odor sample. - ✔✔Inform the fuels service center (FSC) and await further guidance. (006) Which of the following cryotainer valves should be in the open position before starting a liquid nitrogen (LIN) receipt? a. Vent valve. b. Service valve. c. Fill/drain valve. d. Pressure build up valve. - ✔✔Vent valve. (006) Before beginning a liquid oxygen (LOX) receipt, ensure the commercial delivery operator a. reviews the AFTO Forms 244/245 for accuracy. b. performs an odor test on the receiving cryotainer. c. purges the transfer hose to remove potential contaminants. d. signs the DD Form 250 in the quality assurance representative (QAR) block. - ✔✔purges the transfer hose to remove potential contaminants. (006) When preparing to issue liquid oxygen (LOX), what action, if any, should be taken if a review of a receiving tank's AFTO Form 134 finds that the form is not properly filled out? a. No action is required. b. Do not service the receiving tank.c. Inform aircraft maintenance of the discrepancy. d. Contact the fuels service center and await further instructions. - ✔✔Do not service the receiving tank (006) To what pressure range should source tank pressure be set for cryogenic issuing? a. 10-15 psi. b. 15-20 psi. c. 20-30 psi. d. 30-40 psi. - ✔✔10-15 psi. [Show More]

Last updated: 3 years ago

Preview 1 out of 16 pages

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)
Preview image of 2F071 CDC URE Vol 1 document

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Reviews( 0 )

$10.00

Buy Now

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Instant download

Can't find what you want? Try our AI powered Search

140
0

Document information


Connected school, study & course


About the document


Uploaded On

Jul 08, 2022

Number of pages

16

Written in

All

Seller


Profile illustration for Prof.Pierro
Prof.Pierro

Member since 4 years

240 Documents Sold

Reviews Received
31
7
3
0
0
Additional information

This document has been written for:

Uploaded

Jul 08, 2022

Downloads

 0

Views

 140

Document Keyword Tags

Recommended For You

Get more on EXAM »

$10.00
What is Scholarfriends

Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·