Change Control Board Correct Answer-Group whose function is to review, approve or reject changes on
the project as they relate to the various
...
PMP Certification Questions and
Answers Latest 2022 A+ Work
(Recommended)
Change Control Board Correct Answer-Group whose function is to review, approve or reject changes on
the project as they relate to the various areas of the represented bussiness
Change Control System Correct Answer-Used to asses the impact and consequnces of requested
changes on the project
Contraints Correct Answer-Factors that limits project options such as the number of people available,
amount of time or money available to finish the job or other resources or assest issues
1. Close out any contracts w/ outside vendors
2. Deliver any required reports assoc. w/ closure (Opa updates)
3. Complete any Close Project of Phase activites
4. Performed Lessons Learned
5. Complete Archives of any project Files (OPA updates)
6. Release resources for other projects Correct Answer-General Closing Order of itmes for a project (6)Opportunity that allows the team to learn from past experience and improve on the project as the
complete it. LL can come along before the end on the project . If they come at the end administrative
procedures come into play Correct Answer-What are Lessons Learned?
1. To develop a consistent process to evaluate changes
2. To create an environment in which you can review and approve appropiate changes to modify the
project for the better.
3. To set communication standards so the project team can communicate those changes to the
appropiate stakeholders Correct Answer-3 main goals of a configuration mgmt system
Project Managment Plan Correct Answer-A cumulative document that contains all the documents used
in the project mgmt apporach on the project. It describes the steps associated w/ executing, monitoring
and controlling and closing
Product Verification Lesson Learned
Updating records - Project files, contract files
Reporting Archiving Formal Acceptance Correct Answer-Closing a Project Includes the Following (3)
When you perform project mgmt part of the concept of planning is to deal with items unkown, here you
must make assumptions for scheduling and budgeting. In most cases as the project evolves you learn
more about it Correct Answer-Know Assumptions as they relate to a ProjectPMIS Correct Answer-Used for communication and information distribution on the project not
necessarily a high tech system but whatever is used for project communication on the project. Normally
a mixture of technology and non-technology.
Project Scope is built Correct Answer-What is the result of Executing?
Project Charter and Stakholders are Identified Correct Answer-What is the result of Initiating?
Corrective Action Correct Answer-What is the result of Monitoring and Controlling?
results in the product, service or result transition of the project Correct Answer-What is the result of
Closing?
Characteristics of the PMO (3)
A centralized area for all 1.PM personnel to and be assigned. 2. for documentation a process support 3.
For Project mgmt support and auditing of projects. Correct Answer-Characteristics of the PMO (3)
Mgmt by Projects Correct Answer-Performing day to day operations by a project Mgmt approach...
Project Initiation Correct Answer-The process that result in the authorization of a project..Planning Process Correct Answer-The process required to develop the activites to attain objective..
Project Mgmt Correct Answer-Emcompasses project of similar work or correlated activites managed in a
coordinated way to attain benefits that could not achieved separately
Project Life Cycle Correct Answer-Process of completing work on the Project. It is not the management
of the work, but rather the work process. Can be describe what work is done (and who does the work )
in each phase of the project, what the deliverables are, and the approval for each phase
Sub Project Correct Answer-A smaller piece of the project as a result of decomposition; is usually
created as a result of creating the work breakdown structure
Characterisitics of Project(5) Correct Answer-Has a specific purpose Creates specific results
Has a start a nd finish Temporary
Could be progressively elaborated as more is learn
Product Life Cycle Correct Answer-Involves the product or service from concept to divestment (closure)
This cycle typically begins with a business plan end with a product or service
Project Mgmt Life Cycle in 5 process group Correct Answer-Initating Planning Executing Monitoring and
Controlling
ClosingProjects (or project selection) are typically authorized as result of the following Correct Answer-Market
Demand Strategic Opportunity Customer Request
Technological Advance Legal requirements
Program Management Correct Answer-A group of related projects managed in a coordinated way to
obtain benefits and control not availble from managing the individually
Strategic Planning Correct Answer-Practice by which a company looks into the furture for products or
services it must have, typically 3 to 5 years in the future. Projects are the tools that company will use to
implement the strategic goals
Scope time cost Correct Answer-What is the triple contraints?
Quality gurus HR gurus Comm Channels Fromula
Expected Monetary Value Formula
Four Core Earned Value Formula
Standard Deviation Values Triangular pert formulas Correct Answer-10 things remember for a brain
dump
Process groups /Knowledge areas are number by Correct Answer-2 - 20 - 8 - 10 - 2Portfolio Correct Answer-A group of programs of projects related and managed in a coordinated way to
achieve specific strategic business goals
Program Correct Answer-A group of related projected project that are managed to obtain synergistic
benefits and control
Projectized Organization Correct Answer-An Organizational which authorizes the project manager to
assign resources to the project to establish priorities and to direct the work of the project
Portfolio Mgmt Correct Answer-Mgmt of various portfolios that include the project and programs of
which they consist can in prioritization, authorization, mgmt
Opportunity that allows the team to learn from past experience and improve on the project as the
complete it. LL can come along before the end on the project . If they come at the end administrative
procedures come into play Correct Answer-What are Lessons Learned?
Baseline Correct Answer-The original estimate plus any approve changes. it is the value against which
the work results (somtimes called actuals) are compared
Anything that ends with a plan or baseline Correct Answer-Components of the project Mgmt Plan..Configuration Mgmt Correct Answer-Process used to control product features and details through
change control
1. Anyone whose has an authority to create a charter. 2. even a PM - but it must be signed by someone
who can invest authority for the project w/ the PM typically Senior Mgmt Correct Answer-Who creates a
the Project Charter?
Develop Project Charter Correct Answer-Process of developing a document that formally authorizes a
project or a phase and document initial requirements that satisfy the stakeholders needs and
expectations
Work Authorization System Correct Answer-Formal or informal system used in project mgmt to ensure
that work is done as planned. It ensures that right work is done in the right order at the right time by the
right people
4.1 Develop Project Charter
4.2 Develop Proj Mgmt Plan
4.3 Direct and Manage Project Execution
4.4 Monitor and Control Work
4.5 Perform Integrated Change Control
4.6 Close Project or Phase Correct Answer-6 process for Project Integration Mangement (6)Organization Process Assest Correct Answer-Inputs to many process that deal with variables external to
the project, such as information systems and company policies and procedures. They can include
processes, definitions, templates, orgranization communications needs
It's important to explain the impact of requested changes to the authorized requestor or sponsor and let
that person make the call on approving the changes based on the impact Correct Answer-Know how to
correctly interpret stakeholder requests for project changes.
Enterprise Environmental Factors Correct Answer-Inputs to many processes because they deal w/
variables external to the project such as gov't regulations and market conditions. Examples are org
structures gov't standards, personnel policies, business market.
RC- request made by someone on a project not approved and has no impact
AC - Request that have been made through the change control system and approved. They are appart
now part of the project w/ any potential impact now affecting the project. Correct Answer-Difference
between Requested changes and approved changes?
Project Mgmt plan Correct Answer-What is the result of Planning?
Run Chart Correct Answer-Used to track technical performance such as how well something works or
schedule or cost performance such as how things were completed on time or budget, respectively
Team Member - Responsible for the quality of their own work.PM- Responsible for quality standards for the project
Senior Exe - Responsible for the quality standards at the company Correct Answer-Who is responsible
for quality and at what level?
Population Testing - you test every item
Sample testing - you determine how much of something must be tested to ensure that defects are
caught Correct Answer-Difference between Sample and Population Testing?
Design of Experiments Correct Answer-Statistical process used to determine the factors that can
influence variables associated with a process or product
Variable Correct Answer-Characteristic that the Perform Quality Control process is to measure. It is a
generic characteristic or property, such as capacity or height.
Attribute Correct Answer-A specific measurement being recorded - for example square ft., inches or
meters.
ISO 9000 (International Organization Correct Answer-Standard is associcated with companies that wish
to document their process and adhere to those processes.
Document what you do
Do what you documentDocument any variance (from the normal process) Correct Answer-ISO 3 Steps
Is the likelihood that something will occur. It can be expressed in a percentage (1% 75% 100%) or (0.01,
0.75, 1.0) The sum of all probabilities equals 100% or 1.0 Correct Answer-What is Probabilities?
Sigma is also know as Standard Deviation. It is considered the quality standard.
1 Sigma - 68.26%
2 Sigma - 95.45%
3. Sigma - 99.73% Correct Answer-What is Sigma?
Quality Correct Answer-The degree to which a set of inherent characteristics fulfill requirements.
Compliance with compliance
Variable Correct Answer-A quality characteristic measured in increments
Attribute Correct Answer-A quality charateristic that either is classified as conforming or nonconforming
Total Quality Management (TQM) Correct Answer-A quality philosophy that focuses on a proactive
attitude toward quality with a detail toward statistical analysis to document improvement.Customer Satisfaction
Prevention over inspection
Continous Improvement
Management Responsibility Correct Answer-Modern quality managment complements projects. Both
disciplines recognize the importance of: (4)
Fishbone AKA cause/effect diagram Correct Answer-Tool you can use initially in a project to evaluate
what could potentially cause defects. You can use it during the project to review symptoms to
determine the real problem (continue to ask questions until the root cause is determine)
Demings 14 principles of managment are generally seen as the founding basis for total quality
managment
Points are:
1. be proactive, not reactive
2. Utilize leadership and accountability
3. Measure and strive for constant improvement Correct Answer-Who is W Edward Deming ?
Conformance- company pay for quality in a proactive way, typically up front in the planning area of a
project ie - increase morale
Nonconformance - company pays for quality in a reactive way, on the back end - decrease morale -
decrease customer perception Correct Answer-Cost of Conformance and nonconformance examples...Design of Experiments Correct Answer-Key tool that is a statistical method or tool, that helps identify
which factors may influence specific variable of a product or process under development or in
production. It lets you change many factors at once.
Quality Management Plan Correct Answer-Output that defines what standards to work plus how to
attain and test for the standards
Cost-Benefit Analysis Correct Answer-Key tool how to minimize rework and maximize satisfaction and
productivity
Benchmarking Correct Answer-Key tool for comparing a product or service to other standards
Accuracy deals with the alignment of a value with its target value. It deals with how close the the
measurement is to the target
Precision deals with consistency of the output- it deals with many of the outputs meet the target Correct
Answer-Difference between Precision and accuracy?
CMMI 6 SIGMA LEAN 6 Sigma Quality Function Correct Answer-Proprietary Quality Management
Methodolgies (4)
Upper Control Limit (UCL)Lower Control Limit (LCL) Correct Answer-Represent the control points of the proces. Typically the limits
are set +/- 3 sigma
Upper/Lower Specification limits (USL/LSL) Correct Answer-Limits that are customer established and can
be inside or outside the control limits
Pareto Diagram Correct Answer-A cumulative histogram you can use to see where the key problems lie.
You can see what is causing the most frequency of prob