Computer Science > QUESTIONS & ANSWERS > WGU C857 Software Quality Assurance – Preassessment 2022 with complete solution (All)

WGU C857 Software Quality Assurance – Preassessment 2022 with complete solution

Document Content and Description Below

WGU C857 Software Quality Assurance – Preassessment 2022 with complete solution Management has requested that the development team have a moderator review their newest module of code. Which type ... of review is being asked for? -Answer- Inspection An informal review of a module of code has been completed. The development team has decided to evaluate the module from an end user perspective. Which method should be used to determine if the code meets quality standards? -Answer- Black box There is a requirement to verify the usability of a product as it is being delivered to ensure overall design and functionality without regard to the internal functioning of the code. Which quality method meets this requirement? -Answer- Black box testing QA proposes a formal group meeting where the programmer narrates, statement by statement, the logic of a program as an error detection technique. Which quality method meets this proposal? -Answer- Code inspection A program's state changes from what is expected. Which practice should be applied to find the location of the defect? -Answer- Backtracking A web developer or QA tester encounters an error. What is the best practice to initiate resolution of this error? -Answer- Reproducing the error Which action should a developer take after receiving an email from a QA tester stating that the application under test is not working? -Answer- Ask to document each issue with details in a bug report. Which step should be taken first by a developer about a bug that was identified or reported by the QA team? -Answer- Ask the QA team to provide the steps that led to that error. Which action should a developer take after the review of a bug report? -Answer- Talk directly with the QA engineer. Which action should the QA team lead take when the developer has failed to provide feedback after the bug report was delivered? -Answer- Ask the developer if the bug report was reviewed. During the implementation phase of a project, the developer realizes the need to change part of the project that has already been written and tested. Which test type should be performed after these changes are made? -Answer- Regression Which standards and procedures are used for managing change in an evolving software product? -Answer- Configuration management [Show More]

Last updated: 2 years ago

Preview 1 out of 4 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Reviews( 0 )

$7.00

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

141
0

Document information


Connected school, study & course


About the document


Uploaded On

Sep 23, 2022

Number of pages

4

Written in

Seller


seller-icon
Excel

Member since 3 years

245 Documents Sold

Reviews Received
15
2
2
1
6
Additional information

This document has been written for:

Uploaded

Sep 23, 2022

Downloads

 0

Views

 141

Document Keyword Tags


$7.00
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·