Project 3: Lock Down
Software Development Life Cycle Assessment
Team 1 – United States
CYB 670 Capstone in Cybersecurity
University of Maryland University College
Table of Contents
Software Development Life Cy
...
Project 3: Lock Down
Software Development Life Cycle Assessment
Team 1 – United States
CYB 670 Capstone in Cybersecurity
University of Maryland University College
Table of Contents
Software Development Life Cycle Assessment.4
Phase One – Planning...4
Phase Two – System Analysis.5
Phase Three – System Design..5
Phase Four – Development......5
Phase Five – Testing.....6
Phase Six – Implementation....6
Phase Seven – Maintenance.....6
Software Development Life Cycle Methodologies/Models....7
Incremental SDLC Model........7
Rapid Application Model (RAD)........8
Spiral SDLC Model......8
Structured Evolutionary Prototyping Model.9
V-Shaped SDLC Model9
Waterfall Model..........10
Summary...11
References.12
3
Software Development Life Cycle Assessment
The Software Development Life Cycle (SDLC) is a systematic process utilized by the
software industry to design, develop and test quality software and their aim is to produce high
quality software that meets or exceeds customers’ expectations. The SDLC concept is applied to
any hardware or software configuration, since the system can only be composed of hardware or
software (Crnkovic & Larsson, 2006)
The SDLC identifies the process involved from the initial exploration to the final
maintenance of the developed application or software. It comprises a thorough plan describing
how to develop, maintain, replace and alter or enhance specific software. The overall goal is to
be able to ensure the production of high-quality results, while meeting all of the customers’
requirements (Cohen & Haan, 2010).
The SDLC defines a methodology for improving the quality of software and the overall
development process, consisting of seven different phases. Each phase performs a significant
role towards the development of the overall system. The seven phases are: Planning, System
Analysis, System Design, Development, Testing, Implementation, and maintenance. The
following section is going to provide a brief overview of each of the phases.
Phase One – Planning
The planning phase could be considered the most critical phase within the SDLC. Within
this phase key decisions are made on what is exactly is wanted, how it will get done, and how
issues are going to be address if they happen to arise. This is also the time when the customers’
requirements and needs are organized in order to create a project plan. The project plan entails all
the details describing what technology is appropriate for the project, cost of the project, time
4
schedules etc. The time spent within the planning phase is critical because it will serve as a
guideline for the subsequent phases to follow.
Phase Two – System Analysis
During the analysis phase the system’s requirements are analyzed in order to create
specific documentation that consists of all the previously defined requirements. These
requirements then become validated Functional Requirement Documents (FRD). The FRD’s
provide guidance on the software on who will utilize the application, as well as defining the data
input and output.
Phase Three – System Design
The design phase is also another critical phase within the SDLC because this is when the
entire software comes into a pictorial representation by the design team. The design team use the
information that is created within the previous phase in order to create several prototypes. Once
the prototypes are ready for demo, they are shared with the customer in order to receive their
approval for the way forward. Once a prototype is approved its design layout will flow into the
subsequent phases within the SDLC.
Phase Four – Development
The development phase of the SDLC is when the previously mentioned functional
requirements are transferred into the specific computer language in order to register as code. All
of the functional and software components are divided into modules and disseminated amongst
the development team in order for them to start working the code. This is usually the longest
portion of the SDLC because it requires the most physical work and writing code can be a
monotonous process.