Construction and The Built Environment > QUESTIONS & ANSWERS > Professional Home Inspector Exam NHIE / TREC Questions and Answers Already Passed (All)

Professional Home Inspector Exam NHIE / TREC Questions and Answers Already Passed

Document Content and Description Below

Professional Home Inspector Exam NHIE / TREC Questions and Answers Already Passed The inspector is not required to determine ____ ___ of any system or component. ✔✔-Years of age -Life expecta... ncy -Make model Horizontal waste pipe should slope ____ inch per foot ✔✔1/4" per foot if < 3 inch pipe. 1/8" per foot if > or = to 3 inch pipe Drip screed ✔✔Also called weep screed. Used at the base/bottom of stucco walls to release moisture. Pressure Vacuum Breaker (PVB) ✔✔Used for Backflow Prevention. Lawn Irrigation systems: installed vertically 6 to 12 inches above highest outlet/emitter and before the irrigation system valves. Lintel ✔✔L shaped steel installed to support brick veneer above openings such as windows and doors. Should bear on 6 inches or greater of the supporting veneer. Rusted lintels may expand and cause cracks around openings. Guardrail for decks and patios ✔✔A deck 30" above grade requires a guardrail. Required if deck is > or = to 30 inches above grade. Balusters and openings should not exceed 4 inches in diameter. Rail height must be > or = to 36 inches from deck.Minimum overlap on vertically installed fiber cement siding ✔✔1 1/4 inches overlap, and blind nailing recommended Distance required between wall cladding and roof covering materials? ✔✔1" to 2" (1 inch minimum, some local code is 2") What is the concern with a Double sided key lock deadbolt ✔✔All means of egress (escape), must be operable from the inside without special knowledge or tools. A keyed lock is a danger. Fiberglass shingle roof that is 5 years old is losing granular and cupping. Attic insulation and venting is adequate. What is the most reasonable explanation? ✔✔Improper installation. Sealing strip or nailing was not done properly. What is the last part to fail in a slate roof system? ✔✔The slate itself. Flashings eventually wear out, but long before the slate. Metal roof has minor rust in spots. What is the corrective action? ✔✔Removing the rust, priming and painting. What type of flashing is found on a gable edge? ✔✔Rake edge or edge flashing. A gable Edge is called a rake. Which construction framing provides fire blocking? ✔✔a platform-framed structure The Bottom chords of trusses were cut to fit other construction. What is the recommendation? ✔✔Recommend a structural engineer . [Show More]

Last updated: 2 years ago

Preview 1 out of 63 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Reviews( 0 )

$8.00

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

124
0

Document information


Connected school, study & course


About the document


Uploaded On

Nov 16, 2022

Number of pages

63

Written in

Seller


seller-icon
Alphascore

Member since 2 years

48 Documents Sold

Reviews Received
0
4
2
2
3
Additional information

This document has been written for:

Uploaded

Nov 16, 2022

Downloads

 0

Views

 124

Document Keyword Tags


$8.00
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·