NERC > Quiz > NERC Certification Practice QUIZ (30 OUT OF 30) GRADED A (All)

NERC Certification Practice QUIZ (30 OUT OF 30) GRADED A

Document Content and Description Below

Which type of relay operates on the premise of comparing the flow in and out of the area of protection? Differential relay Underfrequency load shedding is set-up so that which of the following d... oes NOT occur? Uncontrolled separation Who is responsible to make sure that the operation of voltage control equipment is coordinated with other impacted entities? Transmission Operator The coordination of voltage schedules by system operators would be utilized to reduce all of the following EXCEPT Reactive inadvertent What should a system operator expect to see if the generator increases its excitation? An increase in MVAR output A transmission line between Bus A and Bus B has MW flow from Bus B to Bus A. After the tripping of a parallel line, the line flow from Bus B to Bus A exceeds the lines thermal rating. Which of the following actions would assist the operator in correcting the problem? Increase generation at Bus A What is a major concern for a System Operator during emergency conditions? System remains connected to the Interconnection If your system has lost a large amount of customer load due to a system disturbance, but has remained connected to all of your neighbors, what is the best solution to consider? Coordinate with the neighbors You report for work on a peak summer day with expected high temperatures and load. What can you do to maintain an adequate system voltage profile? Get under the voltage by placing capacitors in service while maintaining operating limits If a Balancing Authority is unable to calculate ACE for more than _________ minutes it shall notify its Reliability Coordinator. 30 Your system configuration presents you with a situation of having two parallel lines between two stations. The lines have different ratings. Line A has a rating of 250 MVA, while line B has a rating of 200 MVA. Based on the line ratings, what is the first contingency transfer capability between the two stations? 200 MVA [Show More]

Last updated: 1 year ago

Preview 1 out of 2 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Also available in bundle (1)

NERC EXAMS AND STUDY GUIDES COMPILATION PACKAGE DEAL.

NERC EXAMS AND STUDY GUIDES COMPILATION PACKAGE DEAL.

By Goodluck Academia 1 year ago

$22.5

14  

Reviews( 0 )

$9.50

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

84
0

Document information


Connected school, study & course


About the document


Uploaded On

Oct 12, 2023

Number of pages

2

Written in

Seller


seller-icon
Goodluck Academia

Member since 4 years

165 Documents Sold

Reviews Received
46
9
10
4
9
Additional information

This document has been written for:

Uploaded

Oct 12, 2023

Downloads

 0

Views

 84

More From Goodluck Academia

View all Goodluck Academia's documents »

Recommended For You

Get more on Quiz »

$9.50
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·