Information Technology  >  STUDY GUIDE  >  IT510 4-2 Final Project Milestone Two Project Plan (1) (All)

IT510 4-2 Final Project Milestone Two Project Plan (1)

Document Content and Description Below

Work Breakdown Structure In this section the important duties and roles, needed to apply the solution, will be discussed. In order to make the operations run efficiently, the IT unit will be giving ... several jobs to workers in the title of: mobile developer, web developer, system analyst, project manager (PM). Team will be leaded by the project manager, who is assigned to overview and plan duties of every member of the team; and making case records of business to provide details in future. To produce accurate method, the current arrangements will be surveyed by the PM and system analyst. The PM, along with analyst, also have to gather data utilizing fact- finding with different tools mentioned in the lay-out and system analysis (pg. 146 to 159); that is interviews, updating the record, survey forms and polls, surveillance, exploration and examination. Also, checking the notes taken on project and doing manipulations is a part of the PM's job, alongside setting up tribute and making administrative appearance to maintain organization's supervisory team updated. Apart from aforementioned duties, the analyst is more inclined upon technical problems which happen during the procedure. Creating lay-out of the data flow figure (using MS Visio), UI (utilizing provided input devices and program) and user process, are also done by system analyst. System analyst is responsible for managing the solution framework by controlling the team of solution development. The application of solution is very crucial, as if an accurate solution is not provided to the context, a smooth prototype could not be authenticated by the analyst and this will result in running the whole method once more, which will take a lot of time. In the end, job of mobile and web developer, which will help in the application of the solution to the next stage of the method, is to create web page and iPhone Operating System with prototypes for all of them. (Note: beneath is a screen capture of the operations and workers assigned with initiation date and time span of each operation) [Show More]

Last updated: 3 years ago

Preview 1 out of 12 pages

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)
Preview image of IT510 4-2 Final Project Milestone Two Project Plan (1) document

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Reviews( 0 )

$12.50

Buy Now

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Instant download

Can't find what you want? Try our AI powered Search

220
0

Document information


Connected school, study & course


About the document


Uploaded On

Jun 17, 2021

Number of pages

12

Written in

All

Seller


Profile illustration for renurse
renurse

Member since 4 years

32 Documents Sold

Reviews Received
11
0
0
0
0
Additional information

This document has been written for:

Uploaded

Jun 17, 2021

Downloads

 0

Views

 220

Document Keyword Tags

Recommended For You

Get more on STUDY GUIDE »

$12.50
What is Scholarfriends

Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·