Aviation Maintenance Technician > EXAM > SKYWEST ERJ 175 SYSTEMS 2024/2025 STUDY QUESTIONS WITH VERIFIED ANSWERS GUARANTEED PASS | RATED A+ (All)

SKYWEST ERJ 175 SYSTEMS 2024/2025 STUDY QUESTIONS WITH VERIFIED ANSWERS GUARANTEED PASS | RATED A+

Document Content and Description Below

When required at certain airports, our SOPM allows us to be towed into a gate with the engines shutdown? - Answer>>> true What must be done if slats/flaps were left up during taxi after de-ice? - An... swer>>> Nothing per the PPM the captain will call for "flaps , before takeoff checklist" During cold weather operations of more than 30 minutes in icing condition, what must be done w/ respect for vibration due to ice? - Answer>>> Increase thrust to 54% N1 for 30 seconds. Prior to conducting the takeoff briefing the PF will normally enter the flight plan into the FMS and both pilots must - Answer>>> verify waypoints and restrictions in MFD plan page and restriction in the MCDU How can you confirm the airplane is ready for pushback? - Answer>>> The steer off message will be displayed on EICAS Emergency brake is off The pushback operator can see a green light When is it appropriate to start the APU in conjunction with the after landing sequence when flying for united or alaska/ - Answer>>> When ground power not available at the gate and when nearing the gate what consideration must be given to shutting down an engine after the 2-min cool down period? - Answer>>> Ensure it's not shutdown while turning the aircraft What are the sources of electrical power - Answer>>> DC Power - Battery, AC Power - GPU, APU, IDG, When they all fail the RAC takes over. What is the TRU? - Answer>>> Transformer rectifier unit, converts AC to DC APU Max Re-starting Altitude - Answer>>> 30,000 ft APU Max Operating Altitude - Answer>>> 33,000 ft Logic for AC powering up sources - Answer>>> Onside - Inside - Outside - CrossSide If receiving an airplane already powered up, what must be done with regard to the Safety and PowerUp Checklist? - Answer>>> It must be verified compliant and the fire panel test must be accomplished. What would you do if you discover a battery at 20.5V upon power up? - Answer>>> Call maintenance [Show More]

Last updated: 7 months ago

Preview 5 out of 24 pages

Buy Now

Instant download

We Accept:

We Accept
loader

Loading document previews ...

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Reviews( 0 )

$18.50

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

12
0

Document information


Connected school, study & course


About the document


Uploaded On

Jan 08, 2025

Number of pages

24

Written in

Seller


seller-icon
A+ Study Guides

Member since 10 months

5 Documents Sold

Additional information

This document has been written for:

Uploaded

Jan 08, 2025

Downloads

 0

Views

 12

More From A+ Study Guides

View all A+ Study Guides's documents »

Recommended For You

Get more on EXAM »

$18.50
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·