When a contractor begin work generated by a change order that does not have a full negotiated agreement on terms of work, cost, and schedule signed
...
ACQ 202 Module 5 Exam: Producing System Questions. 100% pass rate,
When a contractor begin work generated by a change order that does not have a full negotiated agreement on terms of work, cost, and schedule signed by both parties, a contract change has been initiated that is _______ . - ✔✔Undefinitized
All of the five elements (5Ms) of manufacturing contribute o the cost of production. Which one of the following is NOT one of the 5Ms? - ✔✔Mandates.
According to learning curve theory, when the quantity of an item produced doubles, the labor hours required to produce the item _______. - ✔✔Decreased by a fixed percentage.
The ____________ has a direct line of communication with the Procuring Contracting Officer, and the __________ has a direct line of communication with the Program Manager. - ✔✔Administrative Contracting Officer, Program Integrator.
Personal liability for unauthorized commitments is determined by _________. - ✔✔The procedures of each agency.
Design changes that are made after the beginning of production tend to be equal in cost to changes made prior to production. - ✔✔False
The cost of achieving quality can be broken down into which THREE of the following areas (Select three answers): - ✔✔1). Appraisal
2). Failure
3). Prevention
In determining the correct appropriation for funding the development of a product improvement, the first/primary consideration is: - ✔✔Will it increase the performance capability?
Process proofing ensures that high risk areas, such as assembly methods and personnel training, are optimized _______________________. - ✔✔Before the start-up of full rate production
Which of the following can negatively impact the learning curve, production costs, and schedule? - ✔✔Inconsistent product design.
Manpower, measurement, methods, machinery, and materials are collectively referred to as the ___________________. - ✔✔5Ms of Manufacturing.
Which process is recommended for those products with the highest volume and the highest standardization on the product continuum? - ✔✔Continuous flow.