1) The largest amount of cost for a system is related to its operations and support. [33a.
Recognize the impact and interrelationship of logistics support and life cycle cost.]
Fals
e
True
2) The largest percentage
...
1) The largest amount of cost for a system is related to its operations and support. [33a.
Recognize the impact and interrelationship of logistics support and life cycle cost.]
Fals
e
True
2) The largest percentage of software life cycle costs is associated with _________?
[26b. Relate the typical distribution of software life cycle costs to the planning of an acquisition
program.]
Upgrades and
Maintenance
Research and
Development
Design and
Development
Test and
Evaluation
3) A software costing method that uses a team of experts working both independently
and together to combine different approaches and arrive at a collective judgment
through consensus is an example of the _________ costing method. [28d. Select an
appropriate approach (e.g., Analogy, Parametric, Top-Down, Engineering (Bottom Up, Actual, Delphi) to
estimate the cost and schedule for a software-intensive system.]
Delph
i
Topdown
Bottomup
Parametri
c
4) Based on information from the Initial Capabilities Document (ICD), an AoA includes
(Select all the apply): [2a. Given an Initial Capabilities Document (ICD) and a summary Analysis of
Alternatives, (AoA), select an appropriate concept, from the perspective of the system developer, to
meet the user's requirement.]
Key attributes as defined by Measures of
Effectiveness
Range of Military
Operations
Detailed System
Specifications
Test
Requirements
Functional
Areas
5) Joint Capability Technology Demonstrations (JCTDs) are a special case of Advanced
Technology Demonstrations (ATDs), enhanced so that they can be fielded and used by
operational forces. Additionally, JCTDs are: [3c. Determine the applicability of science and
technology activities to the acquisition of a system.]
Used for both maturing technology and refining operational concepts
in the field
Acquisition programs designed to provide a residual, usable
capability
A means of demonstrating the use of immature technology to address critical
military needs
A critical role player in the development of the program’s Systems Engineering
Plan (SEP)
6) Total ownership cost, which includes the costs associated with research,
development, test and evaluation, procurement, military construction, military
personnel, operations and maintenance, and disposal of a system, is also known as:
[9a. Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, Acquisition Cost, and Life Cycle Cost.]
Life Cycle
Cost
Flyaway
Cost
Program Acquisition
Cost
Weapon System
Cost
7) What is the procurement cost of this system?
Cost Types Cost (millions of
dollars)
Research, Development, Test &
Evaluation $400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[9a2. Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, and Life Cycle Cost.]
$1,000
million
$800
million
$900
million
$1,400
million
8) The Air Force is in process of completing development on an upgrade to an existing
fighter aircraft that will improve survivability and reliability. The contractor has provided
the Government with detailed technical drawings and associated costs of the parts,
materials, and labor required to produce the system. What cost estimating technique
would the Air Force most likely use to prepare their budget estimate for the upgrade?
[9b. Select an appropriate method to estimate the cost of an acquisition program.]
Engineerin
g
Analog
y
Parametri
c
Actual
Cost
9) The best time to reduce life cycle cost is _____ in the life cycle process. ______ can be
applied throughout the life cycle to achieve an affordable and effective system. Which
combination below provides the CORRECT response for the blanks above? [9d. Relate the
concepts of Affordability and Should Cost to the planning of an acquisition program.]
Early / Affordability and Should
Cost
Late /
CAIV
When the budget is submitted / The
spending plan
Mid Way /
Tradeoffs
10) When comparing two alternative concepts, you discover that both will provide the
needed capabilities. Alternative 1 requires new development that will take 7 years and
will cost more than the other alternative. Alternative 2 can be developed in 4 years
relying on proven Joint Capabilities Technology Demonstration (JCTD) technology. Based
on the information provided here, which is the better alternative? [Given a draft Capability
Development Document (CDD) and a summary Analysis of Alternatives (AoA), select an appropriate