A program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. Correct Answer: -*True*
-False
Program cost increases an
...
A program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. Correct Answer: -*True*
-False
Program cost increases and schedules slips are most likely caused by __________________, changes to the design, and changes to the production processes. Correct Answer: -Changes to the number of systems ordered
-Robust and accurate configuration management
-Well-defined and documented technical data packages
-*Changes to user capability needs*
An Early Operational Assessment is typically conducted to _____________________. Correct Answer: -Support the decision to begin low rate initial production (LRIP)
-Meet the requirement to conduct initial operational test and evaluation (IOT&E)
-Track the evolution of critical technical parameters against the system design
-*Identify potential operational effectiveness and suitability issues during system development*
The management of internal interface design would usually be the responsibility of the _____________? Correct Answer: -Independent Test and Evaluation Agency
-Joint Interoperability Test Command
-Government Program Manager
-*Contractor*
The Program Manager just received approval of his proposed acquisition strategy with one exception: he has been directed to make maximum use of existing Air Force software. Which of the best software acquisition practices is most applicable to his situation? Correct Answer: -Use metrics to manage
-Use system based software design
-*Assess reuse risks and cost*
-Inspect requirements and design
When a program deviation occurs, the Program Manager should notify the Milestone Decision Authority within 90 days of the occurrence. Correct Answer: -True
-*False*
The below-threshold maximum amount of Research, Development, Test, and Evaluation (RDT&E) funds that can be moved into a program element is __________. Correct Answer: -$5 million
-$15 million