CTS Exam Prep Questions Bank
What are the four teams that comprise the overall Project Team? - ✔✔Owner, Design,
Installation, and Management
Who would belong to the Design team? - ✔✔Anyone with Consultant in their tit
...
CTS Exam Prep Questions Bank
What are the four teams that comprise the overall Project Team? - ✔✔Owner, Design,
Installation, and Management
Who would belong to the Design team? - ✔✔Anyone with Consultant in their title except
the moving consultant
Which groups make up the Management Team? - ✔✔Developer, Construction
Manager, and Building Management Agency
The End-User, Facility Manager and Building Committee comprise which team within
the Project Team? - ✔✔Owner
Which group represent the generic roles that are important to the Project process? -
✔✔Project Managers, Designers and Installers
Which project characteristics must be considered in order to determine which method is
best suited for a particular project? - ✔✔Schedule, Size, Type, Complexity, and
Procurement Requirements
What is an important aspect of funding that has a direct impact on the project process
and design/installation? - ✔✔Technical Support Funding
Whether a construction project is large or small, which milestones must be achieved in
a typical schedule? - ✔✔Programming, Building Design, AV Bid, and Move-In
What type of project is a typical Consultant-Led Design-Bid-Build contract structure
good for? - ✔✔Long term projects with extended project cycles
What is the risk in using an OFE/Integrator Installed contract structure? - ✔✔System
and infrastructure design and facility functionality may suffer
What are some of the important project scope and size considerations in selecting an
AV provider? - ✔✔Financial Stability, Current Workload, and Company Credentials
What type of document typically includes Project Size Requirements, Corporate Profile,
Team Personnel, and Warranty Response Time? - ✔✔RFQ
a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - ✔✔Negotiate with the
highest ranking firm to finalize the contract
What is one of the disadvantages of contracting the AV integrator to the electrical
subcontractor? - ✔✔More layers of responsibility and communication
When conducting a complete project bid process, what milestone follows the issuing of
the RFP? - ✔✔Pre-Bid Meeting
Under what circumstances would you likely use an A305-1986 form? - ✔✔Scoring
responses to an RFQ
What is the ideal way to contract an AV integrator? - ✔✔Directly to the Owner
The process of identifying the activities that end-users need to perform, and developing
the functional descriptions of your systems is referred to as:? - ✔✔Needs Analysis
What is the main task of the third Step of the Program Phase of a Project? -
✔✔Conducting program meetings
What should be included in the written Program Report? - ✔✔...A conceptual and
functional system description
The more accurate means to estimate dimensions of a commercial space during a site
inspection would be to? - ✔✔Count Ceiling Tiles in a drop tile instalation
A client requires a new boardroom. The sales person and engineer are sent to the
premises to measure the facility and talk to the client. At this stage they should be
performing a _ - ✔✔Needs Analysis
Sightlines for audience viewing in a given presentation space can be improved by: -
✔✔Providing a sloped, or stepped, seating arrangement
After presenting a proposal, what is the correct plan of action for following up with the
client? - ✔✔Regularly, until a decision is made
AV professionals determine the end user's needs by examining three things: the
required applications, the tasks, and the: - ✔✔Functions to support the applications
When working with a client to design an AV solution for a new conference center, the
client requests a detailed budget for the equipment and installation. What phase is the
project in? - ✔✔Design phase
The HDTV aspect ratio is equal to which of the following? - ✔✔1.78:1
Please select the appropriate resolution for SXGA. - ✔✔1280 x 1024
The Brightness control adjusts which level? - ✔✔Black Level
For what purpose would the AV technician designate a loopback internet protocol
address in the 127.0.0.1 to 127.255.255.254 range in a network configuration? - ✔✔To
test the local device to see if TCP/IP is working on your system
It is important to consider Polar Patterns when____ - ✔✔Selecting Microphones for use
at live events
When training a new user how to operate the solution that has been provided, which of
the following is a best practice? - ✔✔Provide complete user documentation prior to
training
What is a benefit of offering a free training session for a client with new equipment? -
✔✔It is a positive approach for a long-term partnership
Which phase comes first in a project? - ✔✔The Program Phase
A dimmer rack with a constant load capability is powering twenty four incandescent
lights during a stage production. The dimmer rack is running on a steady 230VAC
supply and averaging approximately 98 amps draw. Suddenly the line voltage drops to
211VAC. Calculate the expected amperage draw. - ✔✔90 amps
When terminating a Category 5e cable with an 8P8C (RJ-45) connector, it is best
practice to untwist each wire pair: - ✔✔As little as possible to get each wire to enter the
proper channel in the connector
A camera was installed about 180' (55m) from its 1.5A 12v power supply, the power
supply is dead, and needs replacing. Assuming that the camera can operate normally
within +/- 10% of the power supply voltage, if 18 gauge wire was run initially and an
almost 3v drop is present, what is the correct action? - ✔✔Re-locate the power supply
near the camera
There is concern about the noise level in an AV rack room. What weight setting on the
SPL meter should be used to demonstrate that the noise level doesn't require hearing
protection at all times? - ✔✔A Weighted
On a new construction project, there is a need to verify that power has been installed in
the correct place. Who should be contacted to verify this information? - ✔✔Project
Manager
An audio signal is an _____ representation of a sound - ✔✔Electrical
Any sound reinforcement system consists of two equal parts: the electronic system
used
to manipulate the audio signal and - ✔✔The acoustical environment
What type of loudspeaker system is typically made up of speakers strategically
suspended overhead or placed in the ceiling and may use center-to-center overlap? -
✔✔Cluster
The study of sound-wave motion and sound behavior is the science of - ✔✔The Study
of Acoustics
Which type of sound is most intelligible? - ✔✔Direct sound
Sound that bounces off of many surfaces before reaching the listener is called ______
sound - ✔✔Reverberant
Sound waves have a time relationship to each other known as - ✔✔Phase
When sound waves are 180 degrees out of phase what happens? - ✔✔Phase
cancellation
Decibels are always expressed as a(n) ______ of two quantities. - ✔✔Ratio
A dB may be used to express or describe - ✔✔SPL
All sounds start with physical motion, such as vibrating string. This causes adjacent air
molecules to push together, or _______ - ✔✔Rarefy.
A wavelength is measured at the starting points of two consecutive - ✔✔Cycles
Sound level decreases _______dB every time the source to listener distance is
doubled. - ✔✔6
Hertz is the unit of measure
[Show More]