Electrical Engineering > QUESTIONS & ANSWERS > NERC RC Exam Questions and Answers Graded A (All)

NERC RC Exam Questions and Answers Graded A

Document Content and Description Below

NERC RC Exam Questions and Answers Graded A Common standard time period for station battery to handle outage of AC power to chargers ✔✔8-12 hours Time to restore data exchange redundancy when ... redundancy testing by RC/TOP/BA deemed unsuccessful ✔✔2 hours Transition period to backup control facility (fully functioning) ✔✔2 hours Annual testing of backup control facility must prove to be functional for this long ✔✔2 hours Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching personnel ✔✔2 hours Every 2 years GOP's with blackstart resources shall provide how many hours of training to operating personnel responsible for startup ✔✔2 hours BAL-002 default contingency reserve restoration period (following disturbance recovery period) ✔✔90 minutes How often should BA calculate and record inadvertent interchange ✔✔60 minutes/hourly How often should BA provide MW-hour meter readings to adjacent BA's ✔✔60 minutes/hourly TLR procedure (identifying TLR level and actions to be implemented) needs updating how often ✔✔60 minutes/hourly Hourly ATC for next 48 hours calculated how often ✔✔60 minutes/hourly During EEA2/3 the energy deficient entity needs to update the RC how often until alert is terminated ✔✔60 minutes/hourly DOE-417 (disturbance reporting) should be completed by when ✔✔60 minutes BA with loss of resources must submit RFI with start time no more than how far beyond the resource loss ✔✔60 minutes Sink BA should ensure interchange modifications are submitted how soon after the modification ✔✔60 minutes If unable to calculate ACE for this long, BA must notify RC ✔✔30 minutes ACE cannot exceed BAAL for how long ✔✔30 minutes If AVR, PSS, or other voltage control device status changes from normal operation, GOP must notify TOP within how long of the change (if it does not last longer than this, no reporting necessary) ✔✔30 minutes GOP must notify TOP of change in reactive capability how quick ✔✔30 minutes TOP should return from unknown operating state how quick ✔✔30 minutes IROL Tv should be less than or equal to... (system should be returned to IROL within this time frame of exceeding) ✔✔30 minutes RC completes RT assessments of SOL/IROL violations how often ✔✔30 minutes Once BA/TOP notifies RC of emergency conditions, RC has how long to notify other BA/TOP's and neighboring RC's ✔✔30 minutes Unplanned evacuation from BES control cent [Show More]

Last updated: 2 years ago

Preview 1 out of 15 pages

Buy Now

Instant download

We Accept:

We Accept
document-preview

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

We Accept

Also available in bundle (1)

NERC BUNDLED EXAMS QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS

NERC BUNDLED EXAMS QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS

By Nutmegs 2 years ago

$16

9  

Reviews( 0 )

$10.00

Buy Now

We Accept:

We Accept

Instant download

Can't find what you want? Try our AI powered Search

140
0

Document information


Connected school, study & course


About the document


Uploaded On

Jan 14, 2023

Number of pages

15

Written in

Seller


seller-icon
Nutmegs

Member since 4 years

620 Documents Sold

Reviews Received
77
14
8
2
21
Additional information

This document has been written for:

Uploaded

Jan 14, 2023

Downloads

 0

Views

 140

Document Keyword Tags


$10.00
What is Scholarfriends

In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·