NCCER 26208-17 Questions and
Answers Already Graded A
To properly install heat-shrink insulators, _____. ✔✔Slip the insulator over the connector and
apply heat for a few seconds
When used in control cable, which of t
...
NCCER 26208-17 Questions and
Answers Already Graded A
To properly install heat-shrink insulators, _____. ✔✔Slip the insulator over the connector and
apply heat for a few seconds
When used in control cable, which of the following must be grounded in order to be effective?
✔✔Drain wires
To determine the correct connector size for MC cable, _____. ✔✔Refer to the manufacturer
literature
Burnishes, nicks, and scrapes are generally the result of which of the following? ✔✔Poorly
stripped conductors
When stripping conductors, be sure to _____. ✔✔Cut the insulation so that no frayed pieces or
threads extend past the point of cut off
Which of the following inscriptions on a wire connector indicates that it is designed for use on
both copper and aluminum wire? ✔✔AL-CU
A true statement concerning solid versus stranded conductors is _____. ✔✔The diameters are
different
Wire connectors marked only with the wire size should only be used on _____. ✔✔Copper
conductors
A good electrical connection should ____. ✔✔Be mechanically and electrically secure
Heat-shrink insulators are intented to provide _____. ✔✔Strain relief and much protection
Before a splice or connection can be made to a Type THHN conductor, the _____.
✔✔Conductor ends must be stripped and cleaned
Which of the following is true of drain wires in fire alarm and instrumentation cable? ✔✔Only
one end is typically grounded
How can you determine the wire size that can be used effectively with an insulated barrel crimp
connector? ✔✔It is indicated by the color-coding of the insulation on the connector
The best electrical tape to use as a pretective overwrap on high-voltage cables is _____. ✔✔High
temp silicone rubber
Which of the following eliminates the need for taping and the use of filler tape? ✔✔Motor
connection kit
To position cable so that it is not under tension, it is necessary to _____. ✔✔Train conductors
Stripped wire should be inserted into the barrel of the crimper until _____. ✔✔The insulation
butts against the foward stop
How should terminal space be measured from the end of the lug or wire connector? ✔✔In a
straight line
When installing mechanical connectors, which of the following is used to prevent the formation
of surface oxides? ✔✔An oxide-inhibiting joint compound
The NEC section that governs electrical connections and splices is _____. ✔✔NEC section
110.14