ACQ 101 Module 12 Test & Evaluation
Overview Already Passed
What are DOT&E and/or DASD (DT&E) responsibilities? ✔✔attend systems engineering
technical reviews; develop in consult with DoD components, the OSD T&E overs
...
ACQ 101 Module 12 Test & Evaluation
Overview Already Passed
What are DOT&E and/or DASD (DT&E) responsibilities? ✔✔attend systems engineering
technical reviews; develop in consult with DoD components, the OSD T&E oversight list;
provide advice and make recommendations to the secretary of defense (SECDEF).
The service operational test agency uses T&E information to obtain information to help plan for
training and logistics support. ✔✔false; SOTA used T&E information to plan and conduct
operational tests, report results, and provide evaluations of effectiveness and suitability, not to
conduct training and logistics support.
What is the best definition of "evaluate" in the T&E process? ✔✔review, analysis and
assessment of data
What tests and evaluations does the DoD use for weapon system throughout its life cycle?
✔✔DT&E and OT&E
Live fire test and evaluation LFT&E is a special type of developmental test and evaluation
DT&E? ✔✔true
Operational test & evaluation OT&E is a SIMULATION of any item or key component of
weapons, equipment or munitions? ✔✔false; OT&E is a field test conducted under realistic
operational conditions.
What is part of the test and evaluation T&E planning process? ✔✔establishing safe test
procedures; projecting resource and schedule requirements; determining types and quantity of
data to be collected
It supports the identification of cost-performance tradeoffs and progress toward meeting critical
technical parameters: ✔✔What is DT&E?
Assessing progress toward meeting critical technical parameters occurs during this state:
✔✔What is DT&E?
The group or team responsible for conducting the DT&E: ✔✔Who are the government and
contractor?
This is a type of operational test and evaluation conducted after IOT&E: ✔✔What is follow-on
operational test and evaluation?
An early operational assessment is conduct on this type of system: ✔✔What is a prototype
system?
An operational assessment is an assessment of this: ✔✔What is a system's potential?
This must be developed prior to Milestone A and updated before each subsequent review:
✔✔What is the test and evaluation master plan?
This requires extensive planning to ensure the warfighter gets a system capable of meeting
documented requirements in a timely manner and at reasonable cost: ✔✔What is T&E?
This is the purpose of the TEMP: ✔✔What is an overall test management plan and framework?
Which of the following best describes Test and Evaluation (T&E)? ✔✔ensures that the system
meets the capability needs
After a program successfully passes IOTE and begins full deployment, no further test and
evaluation activities take place? ✔✔false
Select the type of Operational Test and Evaluation that is conducted after the Full-Rate
Production Decision: ✔✔follow-on operational test and evaluation
Select the type of Operational Test and Evaluation that assesses crew vulnerability required by
Title 10 U.S.C 2366. ✔✔live fire test and evaluation
For ACAT I and IA programs, a Test and Evaluation Master Plan (TEMP) is optional and can be
used at the discretion of the Milestone Decision Authority on these programs? ✔✔false
[Show More]