Information Technology  >  PROJECT FINAL  >  BSC203 Introduction to ICT Research Methods - Assignment 2 - Project Management Portfolio: Develop a (All)

BSC203 Introduction to ICT Research Methods - Assignment 2 - Project Management Portfolio: Develop a prototype of a smartwatch-based system that uses camera and GPS

Document Content and Description Below

Project Title: Develop a prototype of a smartwatch-based system that uses camera and GPS Date: 4 March 2019 Prepared by: May Project Justification: (What is this project trying to achieve and why?) ... To identify what the wearer is eating to track energy intake and provide support to the person using it. Major Deliverables: (What will be produced during the project?) • Prototype of a smartwatch-based system that uses camera and GPS to determine what the wearer is eating – both food and quality • Evaluation report – the test results of individual test subjects captured by the prototype and the list of what the subjects have eaten • Report with the outcome of whether the prototype works or not Project Success Criteria: (How will we know if it is successful?) • Within time constraint • Within budget • According to specification, whether have we met the objective and how accurate the prototype has captured the food of what students had consumed and support students with it • Feedbacks from students Constraints and Assumptions: (Constraints – e.g. time frame; budget; other systems involved; assumptions – e.g. specific resources are available) Constraints: • Researchers are hoping to receive 2 years of funding from a university grant scheme and will only undertake the project if they receive the funding • Whether will the project be under the timeline as there is only 1 prototype and 7 students will be testing on it Assumptions: • Internet connection is accessible anywhere as GPS is needed • A group of Polytechnic students of 7 will be participating in this experiment whereby they will take turn to use the prototype for 2 days to monitor the result • Resources are limited and can only make 1 prototype [Show More]

Last updated: 2 years ago

Preview 1 out of 13 pages

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)
Preview image of BSC203 Introduction to ICT Research Methods - Assignment 2 - Project Management Portfolio: Develop a prototype of a smartwatch-based system that uses camera and GPS document

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Reviews( 0 )

$10.00

Buy Now

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Instant download

Can't find what you want? Try our AI powered Search

114
0

Document information


Connected school, study & course


About the document


Uploaded On

Apr 29, 2023

Number of pages

13

Written in

All

Seller


Profile illustration for PAPERS UNLIMITED™
PAPERS UNLIMITED™

Member since 4 years

509 Documents Sold

Reviews Received
55
20
8
2
8
Additional information

This document has been written for:

Uploaded

Apr 29, 2023

Downloads

 0

Views

 114

Document Keyword Tags

More From PAPERS UNLIMITED™

View all PAPERS UNLIMITED™'s documents »

Recommended For You

Get more on PROJECT FINAL »

$10.00
What is Scholarfriends

Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·