GTRAC GCSS S4 Comprehensive PE
Notifications are sent to the PBO using which GCSS Army process - ✔✔SBWP
The ______ provides commanders and managers at all levels, the primary tool for effectively
managing fleet readin
...
GTRAC GCSS S4 Comprehensive PE
Notifications are sent to the PBO using which GCSS Army process - ✔✔SBWP
The ______ provides commanders and managers at all levels, the primary tool for effectively
managing fleet readiness by viewing the operational status of unit equipment - ✔✔Equipment
Situation Report
When you create a reservation for your SLoc, what document does the system create after the
MRP process? - ✔✔Purchase Requisition
Which of the following statements are true about the Total Asset Visibility Business Objects
(BOBJ) report? - ✔✔It is affected by pooled reporting and it derives information from the Mat
comp (ZMATCOMP) report
When creating an OSI BOM for non-standard components, all the components must first have
_____. - ✔✔A Material Master Record
What information can be displayed using the MD04 transaction? - ✔✔All of the Above
When using MB21 to create a manual reservation, what determines if the reservation will be
charged to the Unit's Cost Center or to a WBS Element? - ✔✔Movement type
To open and work simultaneously in another session in GCSS-Army, you will use the GCSS
Army Easy Access Menu and click______. - ✔✔WIN GUI
Use _____ to change the name of stock storage locations to subhand receipt titles. -
✔✔ZPBOSTRUC
When you move property from one Storage Location (SLoc) sub-hand receipt to another, what
transaction and movement type do you use? - ✔✔MIGO, 311
To make a message notification appear on the recipient's screen while they are logged-on or as
soon as they log-on you will check _____. - ✔✔The Express Box
Which button allows you to switch between the Organizational Structure, Force Element Details,
and Object Tab Pages panels when using the Property Book Structure Workbench
(ZPBOSTRUC)? - ✔✔Navigation View
What is the current on-hand balance in GCSS Army for material 002032668? - ✔✔4
What is the name of the tab in the PBO Structure Workbench (ZPBOSTRUC) that lets you view
all stock Storage Locations (SLocs) assigned to a unit? - ✔✔MRP Area
The operational status icons are used to determine the mission capability of a piece of equipment.
The Red Flag icon indicates a ______ operational status. - ✔✔Non-mission Capable
Maintenance
If a request has been created for your storage (SLoc), and you need to review all data associated
with the request, what transaction code in GCSS Army would you use? - ✔✔MD04
Changing the Characteristics columns in a BI Report will do all except _______. - ✔✔Display
the prices for property
How many open inventories can exist at a time for any Storage Location (SLoc) and Material
(NIIN) combination? - ✔✔One
In a TDA unit where you only have on stock SLoc, the Primary Hand Receipt FE/SLoc, what
transaction is used to establish Sub-Hand Receipt's? - ✔✔ZEPA
Using ZNONSTD, who approves request for a Material Master record for stock material
submitted by Unit Supply personnel? - ✔✔PBO
What transaction shows a list of PB01 Work Orders for equipment? - ✔✔IW38
When using the VL06i - Review the Inbound Delivery Monitor, the user can do all the following
options except ____. - ✔✔Return Materials to the SSA
When a BOM is automatically updated and a component is either increased in quantity or added
to the BOM, what other document is changed or created in GCSS Army for you unit? - ✔✔The
PB01 Work Order
What is the current expected credit for all materials in the 002P SLoc that are due for turn-in? -
✔✔$85,382.00
What transaction code is used to generate a near-real-time Authorized vs On-Hand report that
incorporates authorized SubLINs and current In-Lieu-Of authorizations for a Unit? -
✔✔ZMATCOMP
How many pieces of equipment are currently deadline in the WH09A0 UIC? - ✔✔6
In order to generate a Primary Hand Receipt using the Material Situation
(/ISDFPS_DISP_MAT_SIT) transaction, the following entries are required, except: - ✔✔Current
Date
Which example below identifies when MRP is triggered to re-plan a material? - ✔✔Both Qty
change in demand and Qty change to a PR or STO
To change the descriptive name of the sub-hand receipt SLocs, units will need to select the
following in which order. - ✔✔Double click the PB DoDAAC FE
click the Change MRP Area button (pencil)
Click Tab List Button
Click the Stor. Loc tab
Why would you execute a purchase order status report using transaction code ZPROSTAT? -
✔✔To Display a list of Purchase Orders
[Show More]