What is the purpose of the military munitions rule (MMR)? ✔✔to clarify when conventional and
chemical military munitions become hazardous waste
MM that lands off-range are considered WMM if they ✔✔are not promptly rend
...
What is the purpose of the military munitions rule (MMR)? ✔✔to clarify when conventional and
chemical military munitions become hazardous waste
MM that lands off-range are considered WMM if they ✔✔are not promptly rendered safe or retrieved.
Which of the following is WMM? ✔✔Munitions turned into Supply Point Amnesty Box
Select all items that are considered as MM. ✔✔Chemical munitions and agents
Explosives, pyrotechnics, chemical or riot control agents
Which group takes the lead role to declare, conduct, or terminate Level 1 emergencies? ✔✔EOD
personnel
In which regulation, pamphlet or standard would you locate hazardous WMM characteristics? ✔✔40
CFR, Part 261, Subpart C or D
Which federal entity governs the Resources Conservation Recovery Act (RCRA)? ✔✔U. S. Environmental
Protection AgencyWhen submitting a Designated Disposition Authority (DDA) Request, what item(s) must you provide if
applicable to the appropriate DDA? Select all that apply. ✔✔Potential Use Statement.
Explanation of Circumstances
Statement.
Regulatory Status Statement.
Availability Statement
How does the MMR support sustainable range management? ✔✔By minimizing potential explosive
hazards and harmful environmental impacts and by promoting R3
Select all items not included in the military munitions' definition. ✔✔Nuclear weapons and components
with warhead included
Munitions not produced for DOD purposes
Wholly inert items
Improvised explosive devices (IEDs)
During an emergency response, the EOD leader determined it was necessary to transport an item to a
secure location and destroy it by detonation. Identify this emergency response type. ✔✔letter choice A
When assisted by a Designated Disposition Authority (DDA), which condition code would the DDA
provide to identify WMM? ✔✔Condition Code VTypically, how would munitions Item Managers report to a DDA that a propellant failed its propellant
stability test? ✔✔An Urgent Notice of Ammunition Reclassification (NAR)
Which 40 CFR Part would you research to find regulation requiring storage units to be designed and
operated with containment systems and controls for hazardous waste munitions and explosives? ✔✔40
CFR Part 265.1201
Which of the following is designated as used military munitions (MM)? ✔✔40mm grenade fired in
function test
When are permits required for scrap medal reactivity treatment? ✔✔Only when the material qualifies
as hazardous waste and an exemption does apply.
Which 49 CFR Part would you research to locate treatment, disposal, applicable permitting procedures
and technical standards instructions for hazardous WMM? ✔✔40 CFR Parts 260 through 270
You have requested disposition instructions from an applicable DDA. How long does the DDA have to
respond to your request? ✔✔60 Days
When does MM become WMM? ✔✔All of the above.
Based on the MMR, when can normal transportation requirements for hazardous waste (HW) be
exempted? ✔✔When activities use Conditional Exemption (CE) for transportationPer MMR and RCRA requirements, certain conditions must exist for an item to be considered a military
munition (MM). Select three required conditions that constitute a MM. ✔✔Item must been produced by
or used by or for the U.S. Armed Services .
Item must have been produced or used for national defense and security .
An Explosives Ordinance Disposal (EOD) office receives a call from the local police indicating they require
a Level 2 emergency response. The police request the EOD obtain an emergency permit. What is the first
step the EOD should take? ✔✔Determine if a Level 1 or a Level 2 response is required
During an explosives or munitions emergency response, who must transport munitions from an
operational range to another location for the purpose of destruction? ✔✔Range personnel
Which of the following characteristics distinguishes a difference between Level 1 and Level 2
emergencies? ✔✔Level 2 emergencies do not require immediate response activities.
Why is range boundary documentation required? ✔✔To comply with MMR requirements
[Show More]