SCHEDULE DESIGN –
AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION
TCM Framework: 4.1 – Project Implementation
7.1 – Project Scope and Execution Strategy Development
7.2 – Schedule Planning and Development
7
...
SCHEDULE DESIGN –
AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION
TCM Framework: 4.1 – Project Implementation
7.1 – Project Scope and Execution Strategy Development
7.2 – Schedule Planning and Development
7.3 – Cost Estimating and Budgeting
7.4 – Resource Planning
7.5 – Value Analysis and Engineering
7.6 – Risk Management
7.7 – Procurement Planning
10.3 – Change Management
INTRODUCTION
Scope
This recommended practice (RP) for schedule design is intended to provide a guideline, not to establish a standard.
As a recommended practice of AACE International, this document provides guidelines for the project scheduler to
start the planning for developing a baseline schedule and is applicable only as a precursor to the development of
the baseline schedule.
Purpose
This recommended practice is oriented to critical path method (CPM) schedule design. This recommended practice
does not address schedule development but instead provides the framework to enable an efficient and accurate
facilitation of the schedule development process. All schedule development should be done after this schedule
design process is complete since the completion of design is necessary before a good schedule development
process can progress effectively.
Background
This RP provides guidelines to assist engineering, procurement, and construction entities planning for schedule
development. When used, the term “owner” includes the work performed by their agents such as an architect
and/or construction manager. Overall, these participants are responsible for the complete, accurate, and useful
design of the schedule in order to guide and facilitate the development of the baseline schedule.
Schedule design is important to development of an effective baseline schedule. Often, schedulers tend to focus on
the mechanics of schedule development while ignoring the primary purpose of the schedule, which is to
communicate the scope and sequence of activities necessary to complete the project. Decisions such as level of
detail, reporting needs, end user needs, etc. need to be considered as part of the schedule development.
An effective schedule will integrate with project specifications, scope of work, contracts, and other project
deliverables that have an impact on the completion date. Well designed schedules support cost and schedule
forecasts with appropriate level of detail to enable effective project management.
Effective schedules are achieved with sufficient forethought and must be deliberately designed. Schedule design is
an essential prerequisite to schedule development, the latter being a technical function which can be performed
by a competent scheduler. Schedules need to be planned to ensure the right product delivery to the stakeholders.61R‐10: Schedule Design – As Applied in Engineering, Procurement, and Construction 2 of 10
October 11, 2013
Copyright © AACE® International AACE® International Recommended Practices
SCHEDULE DESIGN
Schedule design occurs after the project scope and execution strategy development process (TCM 7.1) has
generated the project implementation basis, and translated that project implementation basis into controllable
project scope definition and an execution strategy. This execution strategy represents only a general approach
through which the work will be performed, and is insufficient by itself to allow a scheduler to begin the schedule
development process (TCM 7.2), including creation of a list of activities, assignment of durations, etc. The start of
the schedule development process requires inputs beyond those encompassed by the project scope and execution
strategy development process. The successful completion of that process alone does not provide sufficient
technical guidance to a scheduler to allow an effective translation of the execution strategy into a coherent
schedule.
Schedule design is the collection, coordination, and organization of the inputs necessary to translate the execution
strategy into a well‐developed schedule. This should accurately represent the project’s proposed means and
methods for accomplishing the work. It also provides the basis for a technically sufficient CPM network which will
allow for monitoring and control of the project.