Electrical Engineering > PROJECT FINAL > Final Project Cedar Creek Wind Farm EEL 4216 (All)
Final Project Cedar Creek Wind Farm EEL 4216 Kevin RuzichFinal Project: Cedar Creek Wind Farm Objective: The objective of this project is to make different design recommendations on the least co... st design for the Cedar Creek Wind Company, which is a 200MW wind farm. The transmission system must be stable for any base case or first contingency loading situation when the wind farm is operating at maximum output and should minimize the system losses to lower the long term cost. The chart below shows the available new right of ways and their distances: Right-of-Way/Substation Right-of-Way Mileage(miles) CCW to JO 4.5 CCW to LYNN 5 CCW to ROGER 8 CCW to WOLEN 11 CCW to SHIMKO 4 ROGER to SHIMKO 6.5 WOLEN to SHIMKO 12 SAVOY to SHIMKO 6 BOB to SHIMKO 6.7 Table 1: Available New Rights-of-Ways Design 1: One of the designs created was a simple design. The CCW bus was connected directly to SHIMKO69 and to WOLEN 69. In this design, 3 different cable types were tested and the cost of 3 cables were compared to see which case was more efficient. The 3 different cables used were Rook, Condor, and Cardinal. The drawings for all 3 are shown below: [Show More]
Last updated: 2 years ago
Preview 1 out of 11 pages
Buy this document to get the full access instantly
Instant Download Access after purchase
Buy NowInstant download
We Accept:
Can't find what you want? Try our AI powered Search
Connected school, study & course
About the document
Uploaded On
May 18, 2021
Number of pages
11
Written in
This document has been written for:
Uploaded
May 18, 2021
Downloads
0
Views
98
In Scholarfriends, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Scholarfriends · High quality services·