Mssc 1st test 135 Questions with 100% Correct Answers
a _____ is important for a timely closure of PM work orders. -Ans-completion date
IN a well organized plant, it should take a worker ____ to find the right tool
...
Mssc 1st test 135 Questions with 100% Correct Answers
a _____ is important for a timely closure of PM work orders. -Ans-completion date
IN a well organized plant, it should take a worker ____ to find the right tool. -Ans-30 seconds
Zero defects and breakdowns is a goal of ___? -Ans-TPM
Reactive maintenance is considered a ____ activity. -Ans-Unplanned maintenance
what is often outlined and detailed in a maintenance log? -Ans-maintenance scheduling
Perhaps the best place to store preventative maintained records is ___. -Ans-In a safe and secure location
________ should be disposed of in a OSHA-approved fireproof container. -Ans-Oily rags
What should a technician do before preforming preventive maintenance? -Ans-Acquire tools and supplies, then shut down the machine
The frequency of a maintenance schedule is usually an item found on the _________. -Ans-Preventive maintenance schedule
If a machine is obviously leaking, _______ -Ans-The employee should notify a supervisor
_________ should preside over housekeeping inspections or audits, -Ans-Unbiased auditors or inspectors
____________ should be replaced immediately if found to be missing during a equipment inspection. -Ans-Safety guarding
_______ normally include verification that the floor is clean. -Ans-Routine housekeeping inspections.
To make sure tools remain in good working order, _____ -Ans-Store them properly
A thorough check for a history of similar problems should occur ______. -Ans-On problems that keep recurring at regular intervals.
Preventive maintenance is best described as what? -Ans-Periodic in nature
Daily preventive maintenance procedures, such as machine lubrication, are __________. -Ans-Planned maintenance activities
The first thing an employee should do when discovering a building maintenance issue that negatively impacts his/her work are is _________. -Ans-Report the situation to the supervisor
The best way to store liquids such as paint or cleaning fluids is __________. -Ans-Sealed and in a cabinet.
Noise, temperature, and vibration should be monitored when? -Ans-During machine operations
_________ are not permitted on the floor of a workstation. -Ans-Extension cords
W. Edwards Deming's plan for continuous improvement is_____ -Ans-Plan-do-check-act (PDCA)
The employee verifies that preventive maintenance is complete when __________. -Ans-Closing out a PM work order
An example of preventive maintenance is __________. -Ans-Scheduled replacement of minor parts that wear out quickly
A workstation designed to ______ can reduce repetitive/stress injuries. -Ans-Minimize motions
Placing tools and equipment where they can be reached with minimal strain is a characteristic of a ______. -Ans-Well designed workstaiton
What is established when operating equipment is in good condition? -Ans-Normal running levels for physical characteristics
Workers should preform an emergency shut down of their equipment and notify their supervisor in which of the following circumstances? -Ans-They hear a loud banging noise coming from the equipment.