GCSS-Army Watercraft in GCSS-Army
Test 1 Already Passed
1. When creating an OBSL work order, the 4 low priority list item is selected. ✔✔b. False
2. When a change is made to the OBSL BOM, a new XML file is received in
...
GCSS-Army Watercraft in GCSS-Army
Test 1 Already Passed
1. When creating an OBSL work order, the 4 low priority list item is selected. ✔✔b. False
2. When a change is made to the OBSL BOM, a new XML file is received into GCSS-Army via
the ______, which results in an update to the existing OBSL BOM. ✔✔b. Open Web Service
(OWS)/Universal Data Exchange (UDEx) Interface
3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links information
from the ______ to GCSS-Army. ✔✔c. Logistics Information Warehouse (LIW)
4. When installing equipment a(n) _____notification must be created. ✔✔d. M1 Notification
5. The intent of the OBSL work order is to be able to compare the OBSL material requirement
quantities with the ______. ✔✔a. On-hand material quantities
6. The nomenclature for the OBSL work order description is the OBSL, followed by the watercraft
vessel ______. ✔✔b. Serial Number
7. True or False? The OBSL work order is not to be released. ✔✔a. TRUE
8. The OBSL work order that is created for a watercraft mission is used for material replenishment.
✔✔b. FALSE
9. The ______ is used to view the provisional on-hand material quantities. ✔✔c. Material Situation
Report (/ISDFPS/DISP_MAT_SIT)
10. True or False? The Material Situation Report (/ISDFPS/DISP_MAT_SIT) is used to establish
and to manage the provisional safety stock requirements. ✔✔a. TRUE
11. The ______ transaction is used to create the OBSL/On-Hand Material Quantities spreadsheet.
✔✔d. Equipment Status Report (Z_EQUST)
12. The ______ transaction is used to display the open watercraft OBSL work order. ✔✔a.
Equipment Situation Report (/ISDFPS/DISP_EQU_SIT)
13. The ______ transaction is used to create the watercraft OBSL work order. ✔✔b. Create Order
(IW31)
14. Operators are entered into a ground equipment dispatch where as ______ are entered into a
watercraft equipment dispatch. ✔✔c. Crew Members
15. GCSS-Army performs an equipment qualifications check on the ______ and the ______ in a
watercraft equipment dispatch. ✔✔d. Vessel Master, Chief Engineer
16. True or False? The equipment usage reading is applied to the end item equipment and to the
engine and transmission in a ground equipment dispatch and to only the end item in a watercraft
equipment dispatch. ✔✔a. TRUE
17. True or False? Equipment usage readings are tracked for the crew members in a watercraft
equipment dispatch. ✔✔b. FALSE
18. The ______ transaction is used to display the Functional Location Structure for a piece of
watercraft equipment. ✔✔a. Equipment Situation Report (/ISDFPS/DISP_EQU_SIT)
19. Clicking the ______ button displays the Functional Location Structure for the selected piece
of equipment while using the Equipment Situation Report. ✔✔b. System View
20. True or False? Equipment usage readings can be entered for any piece of equipment that
requires usage to be tracked and that is installed in a watercraft Functional Location Structure.
✔✔a. TRUE
[Show More]