GCSS-Army Maintenance Supervisor's
Course Test 1 Already Passed
1. __________ are used to schedule preventive services and inspections. ✔✔d. Maintenance Plans
2. A single-cycle maintenance plan is used to schedule ser
...
GCSS-Army Maintenance Supervisor's
Course Test 1 Already Passed
1. __________ are used to schedule preventive services and inspections. ✔✔d. Maintenance Plans
2. A single-cycle maintenance plan is used to schedule services using either a ________ or a
________. ✔✔a. Date cycle, counter cycle
3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a
maintenance plan for deletion. ✔✔d. IP02
4. What process within GCSS-Army calculates the quantities needed to satisfy projected
consumption or to meet immediate requirements? ✔✔b. Material Requirements Planning (MRP)
5. What does the "P" indicate behind the MRP area when displaying the details of the DODAAC
Report (ZFE)? ✔✔d. That this is a Provisional MRP Area
6. A General Maintenance Task List can be assigned when: ✔✔d. All of the above
7. When granting GCSS-Army users the authority to post goods receipts using the AIT application,
what must be established for the AIT User record? ✔✔a. A validity period
8. Which transaction code can be used to verify a material's on-hand quantity balance? ✔✔c.
/n/ISDFPS/DISP_MAT_SIT
9. Within transaction code MIGO, what Action, Reference Document, and MvT posting selections
must be used to post a goods receipt for material that is considered Found on Installation (FOI)?
✔✔c. A01 Goods Receipt, R10 Other, and 501 (Receipt w/o PO)
10. Which Material Requirements Planning Type indicates that a material is a bench stock item?
✔✔b. PD
11. When the shop stock material initial (ZII) Purchase Requisition (PR) is saved, it is
automatically __________ by GCSS-Army and it must be reviewed before it can be converted to
a Purchase Order (PO). ✔✔d. Parked
12. Use the __________ transaction to display the current readiness posture of your organization.
✔✔b. Z_EQUST
13. True or False? Using the Equipment Status Report (ESR), a maintenance manager can review
the current status of all vehicles, including which vehicles are non-mission capable and which are
fully mission capable, prior to departure. ✔✔a. True
14. What type of purchasing documents can be displayed in the Order Status Report? ✔✔c.
Purchase order documents
15. How long is a work center shift interval valid? ✔✔b. For the defined validity period
16. The PP61 transaction can be used to perform the following: ✔✔d. All of the above
17. What must the work center personnel shift plan profile always be set to? ✔✔b. SAP_000002
(work center view)
18. Bench stock material is consumed using a________, which reduces the inventoried quantity
of the material on hand. ✔✔c. Goods Issue
19. A ________ is an inventory management term that denotes a physical inward goods movement
of materials resulting in an increase in inventory. ✔✔a. Goods Receipt
20. The aging indicators identify the age of return purchase requisitions for the materials to be
turned in to your Supply Support Activity. Which aging indicator light represents a PR that is
between 11 and 30 days old? ✔✔b. Yellow light
[Show More]