ACQ 202 Exam Questions Review. 2022.
Graded A+
There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and
Actual Costs are three techniques. - ✔✔Engineering
Which appropriat
...
ACQ 202 Exam Questions Review. 2022.
Graded A+
There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and
Actual Costs are three techniques. - ✔✔Engineering
Which appropriation category would fund the design of new equipment, material, or software? -
✔✔Research, Development, Test and Evaluation
What's the primary purpose of an Analysis of Alternatives (AoA)? - ✔✔Provide decision-making aid in
selecting a cost-effective material alternative
When comparing alternative concepts to provide needed warfighting capabilities, which of the following
must be met? - ✔✔Thresholds
Estimating potential demand for a capability and developing a rough order of magnitude (ROM)
estimate of future sales are characteristics of which International Acquisition & Exportability (IA&E)
Assessment area? - ✔✔International Markets
Both the Army and Marine Corps have a capability need to procure additional helicopters beyond the
number specified in the current contract; the helicopter program is currently in production. What cost
estimating technique would the services most likely use as a basis requesting the funding to pay for the
additional aircraft? - ✔✔Actual Cost
The largest amount of software life cycle cost comes during the design development - ✔✔False
An AOA is a study of the _________ - ✔✔Potential Acquisition Strategies for the alternatives WRONG
Which of the following guidance documents requires DoD Components to incorporate interoperability
and defense exportability aspects into Joint Capabilities Integration and Development System
requirements documents to ensure they are addressed in initial planning and design? - ✔✔DFARSWhich of the following are characteristics of ICPs - ✔✔Shared cost, Shared risks and benefits, and
Government-to-Government
To obtain guidance and (if required) approvals on the level and type of protection required, the DoD
Component International Program Organization and Program Management Offices (PMOs) must
engage: - ✔✔TSFD technology area ("pipe") owners/authorities
In certain situations, there may be a U.S. Government requirements to restrict specific portions of a
weapon system sale to FMS only while permitting other portions to be acquired DCS - ✔✔True
As a general rule of thumb _______ of the total ownership costs of a system occur late in the life cycle,
due to costs associated with operations and support. - ✔✔70-80%
What element of IA&E assess the risks of transferring controlled technology and information that
provide U.S. warfighters a combat advantage as well as the benefits of international participation? -
✔✔Sales and Transfers WRONG
For FMS non-program of record acquisition programs, the FMS customer nation is responsible for
developing, awarding, and executing the contract in accordance with their own contracting policies and
procedures. - ✔✔False
____refers to the cost of procuring prime mission equipment. - ✔✔Flyaway cost
The ____ and the _____ along with the Funding Plan should be established early on in the JCTD to
ensure that preparations are developed to facilitate movement of the JCTD into the acquisition process.
- ✔✔Management Plan and Transition Plan
What document is developed for DoD acquisition programs with substantial international involvement,
as a companion to the Acquisition Strategy, to ensure effective integration of domestic and international
acquisition efforts throughout the program's life cycle? - ✔✔IBP