The lifting lines should be as vertical as possible - ✔✔When using a crane to lift a 12,000-gallon tank out
of the excavation, what is the preferable positi
...
Sample questions from all CSLB trade
exams, 100% Accurate.
The lifting lines should be as vertical as possible - ✔✔When using a crane to lift a 12,000-gallon tank out
of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes?
A. One lifting line should be horizontal
B. The lifting lines should be as far apart as possibles
C. The lifting lines should be as horizontal as possible
D. The lifting lines should be as vertical as possible
Material that contains more than 1% asbestos - ✔✔Which of the following describes surfacing ACM?
A. Material that contains more than 1% asbestos
B. Material that contains more than 0.1% asbestos
C. Material that contains more than 0.01% asbestos
D. Material that contains more than 0.001% asbestos
Inform each of the employers about the asbestos work being performed - ✔✔When removing asbestos
as a multi-employer work site, the asbestos abatement contractor must do which of the following?
A. Ensure that all other employers leave the site
B. Inform the local Cal/OSHA office within 48 hours
C. Ensure that all asbestos is removed
D. Inform each of the employers about the asbestos work being performed.
When airborne exposure exceeds the TWA and excursion limits - ✔✔When must a contractor provide
and require the use of protective clothing?
A. When Class II work requires removal of ACM exceeding 10 square feet
B. When airborne exposure exceeds the TWA and excursion limits
C. When Class II work requires removal of TSI exceeding 25 linear feet
D. When a negative exposure assessment is produced
Aluminum - ✔✔Alternating current would most likely be used in GTAW to weld which of the following
metals?
A. Low carbon steel
B. Deoxidized copper
C. Aluminum
D. Stainless steel
1/8" - ✔✔WHat is the minimum thickness of steel that is covered by the AWS D1.1 Structural Steel
welding code?
A. 1/8"
B. 1/4"
C. 5/16"
D. 3/8"
Shorten the stickout - ✔✔When welding with FCAW, how can the operator control excess spatter?
A. Change the drag angle
B. Run stringer beads.
C. Shorten the stickout
D. Lengthen the stickout
Basic knowledge of chemistry and the measurements used - ✔✔To read and properly interpret
laboratory analysis reports as they apply to hazardous sites, a contractor should have which of the
following?
A. The phone number of a contract a the lead agency
B. Basic knowledge of math
C. A contract at Cal/OSHA
D. Basic knowledge of chemistry and the measurements used
235.5 cubic feet - ✔✔How much material will it take to fill up three round holes drilled into the ground
25 feet deep and 2 feet in diameter?
A. 235.5 cubic feet
B. 180.5 cubic feet
C. 150.2 cubic feet
D. 100.7 cubic feet
Telephone over electrical conduit with a separation of at least 12" in between - ✔✔What method
should be used to install electrical and telephone conduit in the same trench?
A. Electrical over telephone conduit with a concrete barrier and 4" between them
B. Electrical over telephone conduit with a separation of at least 12" in between
C. Telephone over electrical conduit secured together every 12"
D. Telephone over electrical conduit with a separation of at least 12" in between
The paving is cut outside the ditch line by a few inches - ✔✔When replacing pavement over a trench,
what is meant by "overcutting"?
A. All wide spots and bell holes are cut square before paving
B. Paving is reinstalled one inch thicker than what was removed
C. The trench is base-paved and capped later
D. The paving is cut outside the ditch line by a few inches
4.0 mg/L - ✔✔What is the maximum fluoride level permitted in drinking water?
A. 2.0 mg/L
B. 4.0 mg/L
C. 6.0 mg/L
D. 8.0 mg/L
K and L - ✔✔When installing hard copper piping underground, what types of piping should a contractor
use?
A. K and L
B. K and M
C. L and M
D. M and DWV
To remove calcium and magnasium - ✔✔What is the function of a cation exchange unit?
A. To oxidize iron fro the water
B. To remove calcium and magnesium
C. To reduce dissolved solids
D. To increase pH
640 sq.ft - ✔✔How many square feet of the tile are needed for an area that measures 2-1/2" by 4" on a
plan that is drawn to an 1/8" scale?
A. 10 sq.ft
B. 160 sq.ft
C. 576 sq.ft
D. 640 sq.ft
Crackle-glazed - ✔✔Which of the following types of tile requires sealing before grouting?
A. Vitreous body
B. Semi-matte
C. Crackle-glazed
D. Ceramic
8 bags - ✔✔Assuming that a bag of grout covers 75sq.ft, how many bags are needed for a 25' x 23'
room?
A. 6 bags
B. 7 bags
C. 8.bags
D. 9 bags
Deck drainage and coping thickness - ✔✔When establishing the elevation of a swimming pool bond
beam on a residential pool, which of the following must be considered?
A. Bond beam width and coping thickness
B. Bond beam width and pool depth
C. Deck drainage and coping thickness
D. Deck drainage and pool depth
40 gpm - ✔✔What is the flow rate in gallons per minute for a 14,000 gallon pool to turn over in six
hours?
A. 40 gpm
B. 80 gpm
C. 144 gpm
D. 240 gpm
polyethylene pipe - ✔✔Which of the following pipes is approved for underground gas lines?
A. Schedule 40 CPVC pipe
B. Polyethylene pipe
C. Black iron pipe
D. Galvanized pipe
$10000 - ✔✔If a crane company charges $250 per hour of operation, how much will a crane cost for
four days of 8 hours each day and one day of 4 hours, in addition to 4 hours of travel time?
A. $32000
B. $10000
C. $8000
D. $4000
Engineer's structural specifications - ✔✔Where are the requirements for the completion of welding
inspections typically found?
A. Architectural cover pages
B. Cal/OSHA
C. California Building Code
D. Engineer's structural specifications
Continuity plate - ✔✔Which of the following would be the most commonly found in a moment
connections?
A. Base plate
B. Cap plate
C. Lintel brace
D. Continuity plate
$6,192 - ✔✔A contractor determines that a particular job will take three workers an 8 hour day to install
50 feet of retaining wall reinforcement. The labor cost is $43 per hour and the wall is 300 feet long.
What is the total labor cost for the job