Electrical Engineering  >  Lab Report  >  University of Central Florida Department of Electrical and Computer Engineering Design Project Cours (All)

University of Central Florida Department of Electrical and Computer Engineering Design Project Course: EEL 4216 – Fundamentals of Electrical Power Systems

Document Content and Description Below

University of Central Florida Department of Electrical and Computer Engineering Design Project Course: EEL 4216 – Fundamentals of Electrical Power Systems Submitted by: Ryan Hromada Austin Mar ... tratt Joshua Radicchi1 Table of Contents 1 Scope………………………………………….…………………………………………………2 2 Design Specifications……………………..……………………………………………………..2 3 Design Process……………………….………………………………………………………….2 3.1 Base Case Contingency Violations….………………………………………………...2 3.2 Design 1………………..……………………………………………………………...3 3.3 Design 2……..………………………………………………………………………...8 4 Cost Analysis……………….……………………………………………………………..…...11 5 Conclusion……….…………………………………………………………………………….132 1 Scope The scope of this project is to implement a new substation at the CCW wind farm location. This substation will provide clean energy to the surrounding utility. 2 Design Specifications To implement the CCW wind farm, we needed at least two transmission lines exiting the substation to ensure stability and safety. The overall objective is to not only find a solution to implement the CCW wind farm substation into the system, but to also find the cheapest addition costs. The costs per mile for a transmission line and transformers,if any, are compared to the reduction in system loss due to the additions over a period of five years. This cost analysis will weigh heavily in deciding which design would be more beneficial for the addition of the CCW wind farm. We must also complete the integration of the new wind farm without any contingency violations. The transmission systems should be designed to operate at specific voltage levels, in this case 138/69kV and with certain current limits. If these limits and voltage levels are outside a certain tolerance it will result in a contingency violation. 3 Design Process 3.1 Base Case Contingency Violations To begin, we first needed to do a contingency analysis of the current system without the CCW wind farm. The initial system is shown in in Figure 1 below. [Show More]

Last updated: 3 years ago

Preview 1 out of 15 pages

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)
Preview image of University of Central Florida Department of Electrical and Computer Engineering Design Project Course: EEL 4216 – Fundamentals of Electrical Power Systems document

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Reviews( 0 )

$12.00

Buy Now

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Instant download

Can't find what you want? Try our AI powered Search

71
0

Document information


Connected school, study & course


About the document


Uploaded On

May 17, 2021

Number of pages

15

Written in

All

Seller


Profile illustration for Muchiri
Muchiri

Member since 4 years

209 Documents Sold

Reviews Received
19
5
1
1
6
Additional information

This document has been written for:

Uploaded

May 17, 2021

Downloads

 0

Views

 71

Document Keyword Tags

Recommended For You

Get more on Lab Report »

$12.00
What is Scholarfriends

Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·