Alabama State University
ACQ 202
Module 1 - Consideration of Alternatives Exam
Module 1 Exam
· Here is your test result.The dots represent the choices you have made.
· The highlighted questions are the questions you
...
Alabama State University
ACQ 202
Module 1 - Consideration of Alternatives Exam
Module 1 Exam
· Here is your test result.The dots represent the choices you have made.
· The highlighted questions are the questions you have missed.
· Remediation Accessed shows whether you accessed those links.'N' represents links
not visited and 'Y' represents visited links.
Back to Status page
contains 10 Questions
1) The largest percentage of software life cycle costs is associated with
_________? [26b. Relate the typical distribution of software life cycle costs to the planning of an
acquisition program.]
Upgrades and
Maintenance
Research and
Development
Design and
Development
Test and
Evaluation
2) One cost estimation method can be used in combination with another
method. [28d. Select an appropriate approach (e.g., Analogy, Parametric, Top-Down,
Engineering (Bottom Up, Actual, Delphi) to estimate the cost and schedule for a software-intensive
system.]
True
Fals
e
3) Based on information from the Initial Capabilities Document (ICD), an AoA
includes (Select all that apply): [2a. Given an Initial Capabilities Document (ICD) and a
summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the
system developer, to meet the user's requirements.]
Test
Requirements
Key attributes as defined by Measures of
Effectiveness
Functional
Areas
Detailed System
Specifications
Range of Military
Operations
4) The majority of a system's life cycle costs can be attributed directly to
_________. [33a. Recognize the impact and interrelationship of life cycle product support and life
cycle cost.]
Operations and Support
Costs
Research and Development (R&D)
Costs
Procurement
Costs
Weapons System
Costs
5) What is a characteristic of a Joint Capabilities Technology Demonstration
(JCTD)? [3c. Determine the applicability of science and technology activities to the acquisition of a
system.]
Demonstrates technology in a field
environment
Requires no user involvement until after successful completion of the
demonstration
Is funded by procurement money set aside specifically for
JCTDs.
Is based on a validated requirement which is documented in a Capability
Development Document (CDD).
6) __________ consists of all costs associated with developing, procuring and
housing a weapon system. [9a. Given a cost breakdown, determine Development Cost,
Flyaway Cost, Weapons System Cost, Procurement Cost, Acquisition Cost, and Life Cycle Cost.]
Program Acquisition
Cost
Flyaway
Cost
Weapon System
Cost
Life Cycle
Cost
7) What is the procurement cost of this system?
Cost Types
Cost (in millions of
dollars)
Research, Development, Test &
Evaluation
$400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[9a2. Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, and Life Cycle Cost.] [Remediation Accessed :N]
$1,000
million
$800
million
$900
million
$1,400
million
8) The Air Force is in process of completing development on an upgrade to
an existing fighter aircraft that will improve survivability and reliability. The
contractor has provided the Government with detailed technical drawings
and associated costs of the parts, materials, and labor required to produce
the system. What cost estimating technique would the Air Force most likely
use to prepare their budget estimate for the upgrade? [9b. Select an appropriate
method to estimate the cost of an acquisition program.]
Engineerin
g
Analog
y
Parametri
c
Actual
Cost
9) The best time to reduce life cycle cost is _____ in the life cycle process.
______ can be applied throughout the life cycle to achieve an affordable and
effective system. Which combination below provides the CORRECT response
for the blanks above? [9d. Relate the concepts of Affordability and Should Cost to the
planning of an acquisition program.]
Early / Affordability and Should
Cost
Late /
CAIV
When the budget is submitted / The
spending plan
Mid Way /
Tradeoffs
10) When comparing two alternative concepts, you discover that both will
provide the needed capabilities. Alternative 1 requires new development
that will take 7 years and will cost more than the other alternative.
Alternative 2 can be developed in 4 years relying on proven Joint
Capabilities Technology Demonstration (JCTD) technology. Based on the
information provided here, which is the better alternative? [Given a draft
Capability Development Document (CDD) and a summary Analysis of Alternatives (AoA), select an
appropriate concept, from the perspective of the system developer, to meet the user's
requirements.]
Alternative
2
Alternative
1
Module 1 Exam
· Here is your test result.The dots represent the choices you have made.
· The highlighted questions are the questions you have missed.
· Remediation Accessed shows whether you accessed those links.'N' represents links
not visited and 'Y' represents visited links.
Back to Status page
contains 1 Questions
1) What is the program acquisition cost of this system?
Cost Types
Cost (in millions of
dollars)
Research, Development, Test &
Evaluation
$400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[9a2. Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System
Cost, Procurement Cost, and Life Cycle Cost.] [Remediation Accessed :N]
$1,400
million
$1,000
million
$1,100
million
$1,500
million
Module 1 Exam
· Here is your test result.The dots represent the choices you have made.
· The highlighted questions are the questions you have missed.
· Remediation Accessed shows whether you accessed those links.'N' represents links
not visited and 'Y' represents visited links.
Back to Status page
contains 1 Questions
1) What is the weapon system cost of this system?
Cost Types
Cost (in millions of
dollars)
Research, Development, Test &
Evaluation
$400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[9a2. Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System
Cost, Procurement Cost, and Life Cycle Cost.]
900
million
$5,410
million
$800
million
$400
million
1) A software-costing model that bases cost estimates upon statistical
data such as source lines of code is an example of a ________costing model.
[Select an appropriate approach (e.g., Analogy, Parametric, Top-Down, Engineering (Bottom Up,
Actual, Delphi) to estimate the cost and schedule for a software-intensive system.]
Parametri
c
Topdown
Bottomup
Delph
i
2) Based on information from the Initial Capabilities Document (ICD), an
AoA includes (Select all that apply): [Given an Initial Capabilities Document (ICD) and a
summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the
system developer, to meet the user's requirements.] [Remediation Accessed :N]
Key attributes as defined by Measures of
Effectiveness
Range of Military
Operations
Detailed System
Specifications
Functional
Areas
Test
Requirements
3) The majority of a system's life cycle costs can be attributed directly to
_________. [Recognize the impact and interrelationship of life cycle product support and life cycle
cost.]
Operations and Support
Costs
Research and Development (R&D)
Costs
Procurement
Costs
Weapons System
Costs
4) The _______________ and the _____________________ along with the Funding Plan
should be established early on in the Joint Capabilities Technology
Demonstration (JCTD) to ensure that preparations are developed to facilitate
movement of the JCTD into the acquisition process. Please choose from
below to fill in the blanks. [Determine the applicability of science and technology activities
to the acquisition of a system.] [Remediation Accessed :N]
Management Plan and Transition
Plan
Program Management Office and an Acquisition
Strategy
Technical Support IPT and a Technical Integration
Plan
Contracting Officer and an Acquisition
Plan
5) The largest amount of software life cycle cost comes during the design
and development. [Relate the typical distribution of software life cycle costs to the planning of
an acquisition program.] [Remediation Accessed :N]
Fals
e
True
6) __________ consists of all costs associated with developing, procuring and
housing a weapon system. [Given a cost breakdown, determine Development Cost, Flyaway
Cost, Weapons System Cost, Procurement Cost, Acquisition Cost, and Life Cycle Cost.]
Program Acquisition
Cost
Flyaway
Cost
Weapon System
Cost
Life Cycle
Cost
7) What is the procurement cost of this system?
Cost Types
Cost(in millions of
dollars)
Research, Development, Test &
Evaluation
$400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares
$100
Operations and Support
$70,000
Disposal $100
[Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, and Life Cycle Cost.] [Remediation Accessed :N]
$1,000
million
$800
million
$900
million
$1,400
million
8) Both the Army and Marine Corps have a capability need to procure
additional helicopters beyond the number specified in the current contract;
the helicopter program is currently in production. What cost estimating
technique would the services most likely use as a basis for requesting the
funding to pay for the additional aircraft? [Select an appropriate method to estimate
the cost of an acquisition program.]
Actual
Cost
Analog
y
Parametri
c
Engineerin
g
9) The best time to reduce life cycle cost is _____ in the life cycle process.
______ can be applied throughout the life cycle to achieve an affordable and
effective system. Which combination below provides the CORRECT response
for the blanks above? [Relate the concepts of Affordability and Should Cost to the planning
of an acquisition program.]
Early / Affordability and Should
Cost
Late /
CAIV
When the budget is submitted / The
spending plan
Mid Way /
Tradeoffs
10) When comparing two alternative concepts to provide needed warfighting
capabilities, you discover that the total life cycle costs of both are projected
to be nearly the same. Alternative 1 relies on technology that has been
successfully demonstrated during Advanced Technology Demonstrations and
can be fielded in 5 years. Alternative 2 relies on technology that is in the
basic research stage and can be fielded in 8 years. Based on the information
provided here, which is the better alternative? [Given a draft Capability
Development Document (CDD) and a summary Analysis of Alternatives (AoA), select an appropriate
concept, from the perspective of the system developer, to meet the user's requirements.]
Alternative
1
Alternative 2
1) The ________ compares alternatives by estimating their ability to satisfy
Analysis of
Alternatives
Capability Development
Document
Cost Analysis Requirements
Description
Acquisition Decision
Memorandum
2) What is a characteristic of a Joint Capabilities Technology Demonstration
(JCTD)? [Determine the applicability of science and technology activities to the acquisition of a
system.]
Demonstrates technology in a field
environment
Requires no user involvement until after successful completion of the
demonstration
Is funded by procurement money set aside specifically for
JCTDs.
Is based on a validated requirement which is documented in a Capability
Development Document (CDD).
3) The largest distribution of software cost will be __________ in the program's
life cycle. [Relate the typical distribution of software life cycle costs to the planning of an
acquisition program.]
Lat
e
Earl
y
4) What is the program acquisition cost of this system?
Cost Types
Cost(in millions of
dollars)
Research, Development, Test &
Evaluation
$400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, and Life Cycle Cost.] [Remediation Accessed :N]
$1,400
million
$1,000
million
$1,100
million
$1,500 million
1) A software costing method that uses a team of experts working both
independently and together to combine different approaches and arrive at
Delph
i
Topdown
Bottomup
Parametri
c
2) The ________ compares alternatives by estimating their ability to satisfy
the identified capability need through an effectiveness analysis and by
estimating their life cycle costs through cost analysis. [Given an Initial
Capabilities Document (ICD) and a summary Analysis of Alternatives (AoA), select an appropriate
concept, from the perspective of the system developer, to meet the user's requirements.]
Analysis of
Alternatives
Capability Development
Document
Cost Analysis Requirements
Description
Acquisition Decision
Memorandum
3) The largest amount of cost for a system is related to its operations and
support. [Recognize the impact and interrelationship of life cycle product support and life cycle
cost.]
True
Fals
e
4) The _______________ and the _____________________ along with the Funding Plan
should be established early on in the Joint Capabilities Technology
Demonstration (JCTD) to ensure that preparations are developed to facilitate
movement of the JCTD into the acquisition process. Please choose from
below to fill in the blanks. [Determine the applicability of science and technology activities
to the acquisition of a system.]
Management Plan and Transition
Plan
Program Management Office and an Acquisition
Strategy
Technical Support IPT and a Technical Integration
Plan
Contracting Officer and an Acquisition
Plan
5) The largest distribution of software cost will be __________ in the program's
life cycle. [Relate the typical distribution of software life cycle costs to the planning of an
acquisition program.]
Lat
e
Earl
y
6) Total ownership cost, which includes the costs associated with research,
development, test and evaluation, procurement, military construction,
military personnel, operations and maintenance, and disposal of a system, is
also known as: [Given a cost breakdown, determine Development Cost, Flyaway Cost,
Weapons System Cost, Procurement Cost, Acquisition Cost, and Life Cycle Cost.]
Life Cycle
Cost
Flyaway
Cost
Program Acquisition
Cost
Weapon System
Cost
7) What is the program acquisition cost of this system?
Cost Types
Cost(in millions of
dollars)
Research, Development, Test &
Evaluation
$400
Procurement of Prime Mission
Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost,
Procurement Cost, and Life Cycle Cost.]
$1,400
million
$1,000
million
$1,100
million
$1,500
million
8) The Air Force is in process of completing development on an upgrade to
an existing fighter aircraft that will improve survivability and reliability. The
contractor has provided the Government with detailed technical drawings
and associated costs of the parts, materials, and labor required to produce
the system. What cost estimating technique would the Air Force most likely
use to prepare their budget estimate for the upgrade? [Select an appropriate
method to estimate the cost of an acquisition program.]
Engineerin
g
Analog
y
Parametri
c
Actual
Cost
9) The best time to reduce life cycle cost is _____ in the life cycle process.
______ can be applied throughout the life cycle to achieve an affordable and
effective system. Which combination below provides the CORRECT response
for the blanks above? [Relate the concepts of Affordability and Should Cost to the planning
of an acquisition program.]
Early / Affordability and Should
Cost
Late /
CAIV
When the budget is submitted / The
spending plan
Mid Way /
Tradeoffs
10) When comparing two alternative concepts to provide needed warfighting
capabilities, you discover that the total life cycle costs of both are projected
to be nearly the same. Alternative 1 relies on technology that has been
successfully demonstrated during Advanced Technology Demonstrations and
can be fielded in 5 years. Alternative 2 relies on technology that is in the
basic research stage and can be fielded in 8 years. Based on the information
provided here, which is the better alternative? [Given a draft Capability
Development Document (CDD) and a summary Analysis of Alternatives (AoA), select an appropriate
concept, from the perspective of the system developer, to meet the user's requirements.]
Alternative
1
Alternative
2