1) With respect to product improvements, if a modification will not cause
an increase in system performance, does not require extensive
independe
...
Alabama State University
ACQ 202
Module 5 - Producing the System Exam
1) With respect to product improvements, if a modification will not cause
an increase in system performance, does not require extensive
independent testing, and the system is currently in production, its
development and test should be funded with ___________ and modification
kits should be funded with ___________. [Identify the proper DoD Appropriation
Category to be used for each of the phases of a Product Improvement Program.]
[Remediation Accessed :N]
Procurement;
Procurement
Research, Development, Test and Evaluation (RDT&E);
Procurement
Procurement; Operations & Maintenance
(O&M)
O&M;
O&M
2) ________duties are tailored at the request of the Program Manager (PM)
and are written in the Memorandum of Agreement, signed by both the PM
and the Contract Administration Office (CAO) Commander (Please note the
CAO Commander was previously referred to as the Contract Management
Office (CMO) Commander). [Identify the relationship between the Program Management
Office, the Procuring Contracting Officer, Administrative Contracting Officer, and Program
Integrator.] [Remediation Accessed :N]
Program
Integrator
Program Support
Team
Administrative Contracting
Officer
Procuring Contracting
Officer
3) The Army has an urgent requirement for trucks that can operate under
arctic conditions. The Contracting Officer on the current contract for trucks
tells the contractor to install special snow tires on a shipment of trucks. The
Contracting Officer does not have enough time to negotiate the price up
front, but she limits the Government's risk by putting a not-to-exceed price
on the work. This is an example of what kind of modification? [Contrast a
Change Order with a Supplemental Agreement.]
A change order that is
undefinitized
A supplemental
agreement
A constructive
change
A modification that is
definitized
4) Personal liability for unauthorized commitments is determined by
______________________. [Identify the causes and consequences of constructive changes and
unauthorized commitments.]
The procedures of each
agency
The Government Program
Manager
The Administrative Contracting
Officer
The Program Management
Office
5) Process proofing ensures that high risk areas, such as assembly methods
and personnel training, are optimized _______________________. [Identify methods of
controlling manufacturing costs (e.g., process proofing, variability reduction, and statistical process
control).]
Before the start-up of full rate
production
Before system integration is
complete
Before initial operational capability (IOC) is
achieved
Before entering the Operations and Support
phase
6) Which of the following is considered to be a practice of "Lean
Manufacturing"? [Recognize the value of Lean Manufacturing.]
Low levels of
inventory
Highly specialized
workforce
Centralized management
control
Mass
production
7) Choose the ideal cost of quality breakdown from the following options.
[Recognize the value of the Cost of Quality.]
Prevention 50%, Appraisal 35%, Failure
15%
Prevention 15%, Appraisal 35%, Failure
50%
Prevention 5%, Appraisal 45%, Failure
50%
Prevention 25%, Appraisal 50%, Failure
25%
8) Estimates based on learning curve theory may NOT apply if ________.
[Identify where and when learning curve theory is applied.]
The design of the product keeps
changing
The factory workforce remains
stable
Units of production are
homogeneous
The production process continues for 18 months without
a break
9) Which process is recommended for those products with the lowest volume
and the lowest standardization on the product continuum? [Distinguish between
process and product structures.]
Jumbled
flow
Batc
h
Assembly
line
Continuous
flow
10) As production of an item increases, what impact does that typically have
on the unit cost? [Recognize the impact of manufacturing on cost, schedule and
performance.]
Unit cost
decreases
Unit cost decreases initially, then
increases
Unit cost
increases
No
impact
11) What is the typical impact on a program’s cost and schedule when
unstable requirements lead to changes late in the system's development?
[Identify how instability of requirements, design, and production processes impact program cost
and schedule.]
Significantly negative impact on cost and
schedule
Marginally negative impact on cost and
schedule
Negative impact on cost; no impact on
schedule
No impact on cost; negative impact on
schedule
12) All of the five elements (5Ms) of manufacturing contribute to the cost of
production. Which one of the following is NOT one of the 5Ms? [Recognize the
considerations/concerns of the elements of manufacturing (5Ms) and how other areas are affected.]
Mandate
s
Method
s
Measureme
nt
Machiner
y
1) The Air Force needs to modify an aircraft to increase its range by 20%.
This improvement in performance will entail extensive developmental
testing as well as independent operational testing. The production line for
this aircraft shut down six months ago. What type of appropriation should
be used to pay for the development and testing of this product
improvement? [Identify the proper DoD Appropriation Category to be used for each of the
phases of a Product Improvement Program.]
Research, Development, Test and Evaluation
(RDT&E)
Procureme
nt
Operations and Maintenance
(O&M)
Expired
funds
2) The ____________ has a direct line of communication with the Procuring
Contracting Officer, and the __________ has a direct line of communication
with the Program Manager. [Identify the relationship between the Program Management
Office, the Procuring Contracting Officer, Administrative Contracting Officer, and Program
Integrator.]
Administrative Contracting Officer, Program
Integrator
Contract Management Office, Administrative Contracting
Officer
Program Integrator, Contract Management
Office
Program Manager, Administrative Contracting
Officer
[Show More]